Openpit fundamentals

venkoos 44,023 views 24 slides Sep 27, 2010
Slide 1
Slide 1 of 24
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24

About This Presentation

No description available for this slideshow.


Slide Content

Venkat

2
Terminology
BENCH:Ledgethatformsasinglelevel
ofoperationabovewhichmineralor
wastematerialsareminedfromthe
benchface.

2
Terminology
BENCHHEIGHT:Verticaldistancebetweenthe
highestpointonthebench(crest)andthelowest
pointorthebench(toe).Itisinfluencedbysizeof
theequipment,miningselectivity,government
regulationsandsafety.

2
Terminology
BENCHSLOPEorBANKANGLE:
Horizontal angleofthelineconnecting
benchtoetothebench crest.

5
BERM:Horizontalshelforledgewithintheultimatepit
wallslopelefttoenhancethestabilityoftheaslope
withinthepitandimprovethesafety.Berminterval,
bermwidthandbermslopeanglearedeterminedbythe
geotechnicalinvestigation.
Terminology

5
OVERALLPITSLOPEANGLE:Theanglemeasured
fromthebottombenchtoetothetopbenchcrest.Itis
theangleatwhichthewallofanopenpitstandsandit
isdeterminedbyrockstrength,geologicstructuresand
waterconditions.
Terminology

5
Theoverallpitslopeangleisaffectedbythewidthand
gradeofthehaulroad.
Terminology

8
HAULROADS:Duringthe
lifeofthepitahaulroad
mustbemaintainedfor
access.
HAULROAD-SPIRAL
SYSTEM:Haulroadis
arrangedspirallyalongthe
perimeterwallsofthepit.
Terminology

9
HAULROAD–SWITCHBACKSYSTEM: Zigzagpatternon
onesideofthepit.
HAULROADWIDTH:
Functionofcapacityof
theroadandthesize
oftheequipment.Haul
roadwidthmustbe
consideredinthe
overallpitdesign.
Terminology

10
HaulRoadEffectonPitLimits

11
ANGLEOFREPOSE:Maximumslopeofthe
brokenmaterial.
SUBCROPOROREDEPTH:Depthofwaste
removedtoreachinitialore.
PRE-PRODUCTION STRIPPING:Stripping
donetoreachinitialore.
Terminology

12
ULTIMATEPITLIMITS:Verticalandlateralextendof
theeconomicallymineablepitboundary.Determinedon
thebasisofcostofremovingoverburdenorwaste
materialvs.themineablevalueoftheore.
PITSCHEDULING:Materialmaybeminedfromthepit
eitherin:
1)sequentialpushbacks
2)conventionalpushbacks.
Terminology

STRIPPINGRATIO:Expressedintonsofwastetotons
oforeinhardrockopenpitoperations.Criticaland
importantparameterinpitdesignandscheduling.
AVERAGESTRIPRATIO:Totalwastedividedbytotal
orewithintheultimatepit.
CUTOFFSTRIPPINGRATIO:Costsofminingatonof
oreandassociatedwasteequalstonetrevenuefromthe
tonofOre.
Terminology

14
SingleWorkingBench

15
ShovelinWorkingBench

16
TwoWorkingBenches

17
Final
Pit
Limit

18
Example Mine
2001 2007 2011

21
Pit
Sequence
(1)

22
Pit
Sequence
(2)

23
Pit
Sequence
(3)

24
Pit
Sequence
(4)

25
SectionofPitSequence

25