OSH Assignment (1) we are free fwe areaw

zainzulfiqaralioffic 6 views 11 slides Sep 05, 2024
Slide 1
Slide 1 of 11
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11

About This Presentation

OSH Assignment (1)


Slide Content

L S R L S R
1
Industries Produce
Waste
Waste
Management
Hazard
Resulting In
Contamination And
Pollution In
Environment
Recycling Or Waste
Can Be Treated By
Chemical,
Biological And
Physical Methods
3 4 12
Surface Storage And Land
Disposal
1 4 4
Municipalities/I
ndustries
1-2 Months
2
Thunderstorms Usually
Occur In Spring
Summer And Fall
Lightening
Hazard
Extreme Injuries And
Even Death
A Safe Working
Procedure
4 5 20 Lightening Detectors 3 5 15
Concerned
Authorities
3-4 Weeks
3
Usually When
Underground Suddenly
Breaks And There Is A
Rapid Motion Along A
Fault
Earthquake
Hazard
Loss Of Life/ Injury,
Environmental
Damage
Building Safer
Structure
3 3 9
Providing Awareness On
Earthquake Safety
3 2 6
Concerned
Authorities
1-2 Months
4
Load Of
Work/Assignments
Stress Hazard
Anxiety/Depression/T
iredness
Regular
Consultation To
Staff About Work
Load
3 4 12
Increased Workload Should
Trigger Appointment Of
Additional Staff
1 1 1
Employers And
Employees
1 Week
Syeda Rujab Hussani EE-19154
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
5 Laptops Being Used
Eyesight
Hazard
Back And Shoulder
Pain/Eye Strain
Provide Training
To Staff On Using
Equipment'S Safely
2 1 2
Offer Eye Test To All
Staff/Student Using Laptop
1 1 1
Employers And
Employees
1-2 Weeks
6 Trailing Cables Trip Cut/Bruises/Sprain
Plan The Layout Of
Your Place To
Avoid Trailing
Cables
3 2 6
Move Desks So That Cables
Are Not Trailing On Floor
2 2 4
Owner Of
Premises
3-4 Weeks
7 Walking
Slip, Trip And
Fall Hazards
Minor Injuries Such As
Sprains And Strains
Removing
Obstacles From
Walkways And
Always Keeping
Walkways Free Of
Clutter
2 1 2 Maintenance Of Floor 1 1 1 Employees 1-2Weeks
8
Short Circuit , Fault In
Generator ,Motor,
Failure Of Machinery
Etc.
Fire Hazards
Risk Of Severe Injury
Or Death
Fire Detection
Devices, Fire
Warning Devices,
Emergency Fire-
Fighting
Equipment Are
Present
3 4 12
Safe Exits And Escape
Routes
2 4 8
Concerned
Authorities
2-3 Weeks

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
9
Working With
Hazardous Chemical,
Acids In Labs
Chemical
Hazards
Acute Foodborne
Illness, Or Chemical
Poisoning
Ventilation
Systems, And
Processes That
Reduce The Source
Of Exposure
4 2 8 Provide Precautions 3 2 6
Concerned
Authorities
1-2 Weeks
10
No Proper Grounding
Provided To Machinery
Electrical
Hazards
Injury From Exposure
To Arcing, Fire From
Faulty Electrical
Equipment Or
Installations
Insulation,
Guarding,
Grounding,
Electrical
Protective Devices,
And Safe Work
Practices
3 4 12
Providing Awareness And
Inspect Wiring Of
Equipment Before Each Use
2 4 8
Concerned
Authorities
As Soon As
Possible
11
Noise Produced When
Motors, Generators Are
Running Etc.
Noise Hazards
Permanent Tinnitus
And/Or Hearing Loss
Maintain Tools And
Equipment
Routinely (Such As
Lubricate Gears)
Reduce Vibration
Where Possible
2 3 6
Place A Barrier Between The
Noise Source And The
Employee
1 3 3 Employees 1-2 Weeks
12
Protects All Categories
Of Data From Theft And
Damage
Cyberattacks
The Probability Of
Exposure Or Loss
Resulting From A
Cyber Attack Or Data
Breach On Your
Organization
Usernames And
Passwords, Two-
Factor
Authentication,
Antivirus Software,
And Firewalls
4 5 20
Conducting A Cybersecurity
Risk Assessment Regularly
3 5 15
Cybersecurity
And
Infrastructure
Security
Department
As Soon As
Possible
Ayesha Kainat EE-19142

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
13 Animal Waste
Biological
Hazards
Harmful Bacteria,
Viruses, And Parasites
That Can Cause
Infections.
Provide A Proper
Dumping Waste
System
3 2 6 None 3 2 6
Sanitation
Workers
Daily
14
Electromagnetic
Radiation
Explosion
Hazards
Loss Of Life
Avoid Using
Electro-Explosive
Devices
2 5 10
Provide Awareness Among
The Students And
Employees
2 3 6
Owner Of
Premises
1 Week
15
Cracks And Uneven
Walls, Floors And
Ceilings
Structural
Hazards
Sprained Ankles And
Muscles
None 3 2 6
Provide Basic Maintenance
Once A Month
2 2 4
Owner Of
Premises
1 Month
16
Inadequate Lightening
On Pathways And In
Stairwells
Height
Hazards
May Causes Broken
Bones, Sprained
Ankles Or Wrists Or
Even Cause Death
Install More Or
Better Lighting
4 3 12
Provide Sensor Operated Or
Controlled Lighting System
3 2 6
Owner Of
Premises
2-3 Weeks
Anusha Javed EE-19153

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
17 Painting Lead Hazards
Anemia, Weakness,
And Kidney And Brain
Damage.
Restrict The
Unwanted
Movement Of
Public
4 2 8 None 4 2 8
Maintenance
Staff
2-3 Weeks
18
Insects Present In
Different Areas.
Pesticides
Hazards
May Causes Viruses,
Bacteria And Parasites.
Use Of Less
Hazardous
Pesticides.
5 3 15
Use Bio-Control And Natural
Pesticides
3 2 6 Gardener Daily
19
Employee Absenteeism
And Low Morale
Substance
Abuse
Hazards
Dehydration-Induced
Seizures And Damage
Immune Systems And
Mental Health
Problems
None 2 2 4 Provide Proper Consultation 2 1 2
Employers And
Employees
1 Week
20
Mobile Equipment On
The Construction Site
Excavation
Hazards
May Causes Loss Of
Body Parts Or Even
Causes Loss Of Life
Mobile Equipment
On The
Construction Site
2 4 8 Use Protective Systems 2 3 6
Construction
Staff
1-2 Months

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
21
Being Bitten By Insects
And Animals
Insect And
Animal
Hazard
Infection And Injury None 3 2 6
Using Insect Killers And
Removing Dangerous
Animals From University
1 4 4 Municipalities Weekly
22 Using Machines In Labs
Machinery
Hazard
Body Parts Can Be Cut,
Sheared Or Fractured
Safeguarding
Machines
3 4 12
Ppe'S Should Be Provided
To Students And Staff
3 3 9
Management
And Lab In
Charge
1 Week
23
Sitting With
Uncomfortable Position
Ergonomic
Hazard
Backpain And Neck-
Pain
None 5 1 5
Comfortable Seats Should Be
Provided
3 1 3 Management 2 Weeks
24
Over-Speeding In
University Premises
Vehicle
Hazard
Accidents And Injury
Speed Limit
Warnings
1 5 5
Provide Awareness To
Students
1 5 5
Teachers And
Management
Monthly
Ali Aman EE-19136

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
25
Drinking Water From
Water Coolers
Water Quality
Hazard
Unclean Water Can
Cause Health Issues
Filters Are
Provided In Water
Coolers
2 3 6
Coolers Should Be Cleaned
And Filters Should Be
Changed Timely
1 2 2
Management
And Staff
Daily
26
Fighting Between
Students
Violence
Hazard
Injuries And Loss Of
Life
Rules And
Regulations Are
Provided To
Students
1 2 2
Teaching Not To Promote
Violence
1 1 1
Teachers And
Management
Monthly
27
Mold Spores On Class
Room'S Walls
Mold Hazards
Causes Allergic
Reaction, Such As
Sneezing, Red Eyes
And Skin Rash.
Usually Mold Is
Cleaned By Water
In A Week
3 4 12
Bleach Solution Can Be Use
With Water To Kill Mold On
Surfaces
2 2 4 Workers
As Soon As
Possible
28
Working On Confined
Spaces Like
Underground Working
Confined
Space Hazard
Working In These
Spaces Cause Reduce
In Oxygen Level, Risk
Of Fired
Mostly Avoid
Working On These
Places
3 5 15
Proper Lightening In
Confined Places, Proper
Ventilation Wear
Appropriate Ppe
2 3 6 Employees
As Early As
Possible
Aleema EE-19158

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
29
Walking/ Working
Outside Of Building
Tornado
Hazard
Due To Extremely High
Winds And Risk Being
Struck By Flying And
Falling Object
Go Inside The
Room Without
Window On
Lowest Floor
3 5 15
Built Wall With Insulated
Concrete Forms Icf Like Fox
Blocks
1 2 2
Concerned
Authorities
4-5 Months
30
Using Of Automotive
Parts, Industrial
Material Etc.
Asbestos
Hazard
Fatigue, Chest Pain
And Cough Etc.
Avoid Eat And
Drink In Area
Where Asbestos Is
Possible
3 3 9
Avoid Dry Sweeping,
Shoveling
2 2 4 Employees 1 Week
31
Bacteria In Drinking
Water
Legionella
Hazards
Lungs Infection
By Ensuring Water
Is Not Stagnant
4 4 16
Avoid Water Temp And
Conditions That Favors
Growth Of Legionella
2 1 2 Workers 1-2 Weeks
32 Smoking
Occupational
Hazards
Stroke, Heart Disease,
Copd Etc.
Normally Not
Allowed
3 4 12
Cctv Camera, Strict Action
Must Be Taken Against
Smoking
2 1 2
Concerned
Authorities
1-2 Weeks

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
33
Coming In Contact With
Broken Window Glass
Physical
Hazard
Cut/ Skin Damage
Metal Grill Before
Windows
3 2 6 None 3 2 6
Management
Authorities
< 1 Week
34
Coming In Contact With
Main Db Present In
Classroom
Unintentionally
Electrical
Hazard
Electric Shocks,
Injuries, May Cause
Death
Caution Warning
Label, Proper
Insulation
Provided By A Box
2 4 8
Providing Awareness To
Students/Teachers
2 3 6
Management
Authorities
1 Month
35
Loose Power Sockets In
Classroom/ Bare Live
Wires
Electrical
Hazard
Electric Shocks,
Injuries, May Cause
Death
None 3 4 12 None 3 4 12
Management
Authorities
Within A
Week
36
Open Manholes In
Common Walking Area
Near Playground
Safety Hazard
Minor Injuries Such As
Sprains And Strains
Area Secured By
Warning Tapes
3 4 12 Placing A Danger Sing Board 2 4 8
Construction
Staff
<1 Week
37
Working Fans
Producing Too Much
Noise
Physical
Hazard
Harm The Body
Physically Or Mentally
None 3 3 9
Replacing The Fan With A
Proper Working One
1 3 3
Management
Authorities
<1 Week
Abdul Moeed EE-19170Hammad Ali Khan EE-19139

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
38
Heat Being Dissipated
During Equipment
Malfunction
Thermal
Hazard
Burn, Skin Damage
High Temperature
Warning Sign
Indication
3 2 6 None 3 2 6
Working
Student/Staff
Daily
39
Fire Caused By
Flammable Substances
In Labs
Fire Hazard
Severe Injury, Burns,
Death
Controlled Use Of
Chemical; Under
Supervision
4 4 16
Proper Safety Precautions
To Be Taken While Handling
Such Substances
3 4 12
Teachers And
Management
Daily
40
Poor Sanitary
Conditions
Physical
Hazard
Stinky Smell In
Washrooms And
Pathways Due To Old
Infrastructure Leads
To Discomfort
None 5 1 5
Cover Drainage Lines And
Improve The Conditions Of
Washrooms
2 1 2
Ned
Management
Daily
41
No Emergency Exit
Doors In Classroom
Safety Hazard
In Case Of Emergency
Or Primary Exit Cut
Off, No Secondary Exit
None 3 1 3
Back Doors Should Be
Opened For Secondary Exits
2 1 2
University
Management
And Staff
Daily
42
No Lockout/Tagout On
Under Construction Site
Safety
Hazards
Building Under
Construction Near Sfc
Has No
Lockout/Tagout,Stude
nts Can Fall Into The
Ditch And Get Injured
By The Steel Rods
Students Should Be
Careful While
Walking Around
The Edge Near The
Site
3 4 12
There Should Be Proper
Protection Around The
Edges Which Prevent
Students From Going Near It
2 1 2
Construction
Staff
1-2 Days
43
Fungi Dwelling On
Floor,
Safety Hazard
Neglected
Maintenance Of
Sewerage Systems And
Pipes Causes Still
Water In Different
Compact Spaces That
Produces Slippery
Fungi Due To Which
Person May Slip, Trip
Or Fall
Sometimes Maids
Mops
4 3 12
Broken Pipes Or
Equipments Should Be Fixed
To Avoid Leakage Of Water
1 1 1
Supervisor Of
Department Of
Cleaning
As Soon As
Possible
Hammad Ali Khan EE-19139 Hammad Ali Khan EE-19139

L S R L S R
Responsible
Person
Timeline
Risk (After existing Control) Residual Risk
S. No.
Group
Members
Distinct Activity Hazard
Hazard Effect /
Consequences
Existing Controls
Additional Controls
(action to ensure ALARP)
44
Unhygienic Water
Purifiers And Filters
Biological
Hazard
Causing Health Issues
Because Water Is A
Basic Necessity And It
Should Be Clean And
Pure
No Existing Control4 4 16
Clean And Pure Water
Purifiers To Be Installed
1 1 1
Concerned
Health
Authorities
Within A
Week
45
Improperly Built
Structures
Safety Hazard
Slipping, Tripping And
Airborne Material
Exposure
Face Mask,
Frictioned Shoes
2 4 8
Proper Regulation For
Workers Working Near
Sharp Ends And Falling
Points
2 2 4
Management
Authorities
1-2 Months
46 Stray Animals
Biological
Hazard
There Are Dogs
Roaming All Over The
University Which Can
Bite The Students Or
Staff
None 3 2 6
The Animals Must Either Be
Spayed/Neutered Or
Captured And Taken To
Shelter Homes For The
Safety Of Students
2 1 2
Concerned
Health
Authorities
Within A
Week
47 Inadequate Road Signs Safety Hazard
Passer-By Has No
Indication Sign For
Assistance
None 5 1 5
Place More Signs For Better
Assistance
1 1 1
Ned
Management
Within A
Week
48 Collision Possibility Safety Hazard
Causes Permanent
Head Damage And Life
Long Injury And
Sometimes Death
Proper Trails And
Roads For Forklift,
Carts Etc
5 2 10
Proper Trails And Roads For
Forklift, Carts Etc
1 1 1 N/A N/A
49
Contamination Of Viral
Infections
Biological
Hazard
Can Cause Flu, Illness
And Other Infectious
Diseases To A Number
Of People Who Come
In Contact With Each
Other.
Proper Cleaning
And Sterilisation Of
Equipment Is
Required To
Reduce Spread Of
Viruses. The Sick
People Should
Avoid Contact With
People By Wearing
Masks And Gloves.
4 2 8
Strict Observation And
Implementation Of Sops
Within The University.
1 4 4
Individual
Persons
N/A
50
Lack Of Facilities In
Medical Centre
Biological
Hazard
Can Make An Injury
Worse If Not Treated
At Time
Few Medicines Are
Available
3 4 12
Proper First Aid Equipments
Should Be Made Available At
Medical Centre
2 2 4
Management
Authorities
Within A
Week
Wajahat Ullah EE-19167
Tags