PCOM Operating 022 conf-25 1650 130925-1.pptx

deepakneweee 12 views 25 slides Sep 16, 2025
Slide 1
Slide 1 of 25
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25

About This Presentation

Railways Operating


Slide Content

SOLAPUR DIVISION CENTRAL RAILWAY Progress of Traffic Facility works, Status of sidings

SOLAPUR DIVISION CENTRAL RAILWAY PCOM/CR CONFERENCE SEP-2025 PROGRESS OF TRAFFIC FACILITY WORKS (PH-16)

SN Name of work Year /Last San. Cost Allocation/ Exec. Agency Estimates ESP SIP CRS Tender Position Status 1 Latur : Development of Latur Terminus, construction of Washing cum Pit line & Stabling line . 2023-24 27.71 Cr CAP TDC : NOV 2025 DEC 2025 FEB 2026 Accounts vetted on 17.05.204 Approved by HQ on 22.11.2024 Pucca number (GM (W) BB/P/17975/Alt-I Approved by HQ on 04.03.25 CRS paper under preparation Engg :- Tender called on 14.03.2024 Opened on 04.05.2024 LOA issued 17.05.2024 . S&T:- Tender opened on 20.06.2024 LOA issued 01.08.2024 . TRD :- Tender opened on 11.08.2025, LOA issued on 09.09.2025 Final SIP received on 09.03.2025 SWR prepared without TRD portion and Sent to S&T on 30.06.2025 & now with Engg . From 26.08.2025 for preparation of CRS papers. Civil work status:- Latur PIT line- Earthwork for PIT line, stabling line & track machine siding in progress, PIT line foundation completed. Physically & financially 35 % work completed. EI building plan finalized, Footing work completed. Frame work completed upto slab level remaining work is in progress. TDC:15.10.2025 S&T work status:- Excavation, cable laying work in progress (25% work completed) Sanctioned works status

Name of work Year /Last San. Cost Allocation/ Exec. Agency Estimates ESP SIP CRS Tender Position Status 2 Wadi-HG-DD : Extension of running lines CSR and conversion of GF points to motor operated points at TKWD, BALE & BRB. 2023-24 17.80 Cr CAP TDC : TKWD: SEP-2025 Nov. 25 BALE: NOV-2025 Dec 25 BRB: MARCH-2026 Accounts vetted TKWD : 30.08.24 BALE :- 29.08.24 BRB: - 30.08.24 TKWD: - 21.10.24 BALE 07.11.24 BRB 28.10.24 TKWD: sent to HQ on 28.05.25 Engg :- Tender called on 10.05.2024 Opened on 31.05.2024 LOA issued 05.07.2024 S&T:- TKWD : EI LOA issued 26.07.2024 TKED, Bale & BRB : Tander opened on 06.01.2025 LOA issued on 23.01.2025 TRD:- TKWD, BRB, Bale Tender opened on 11.11.2024. LOA issued on 17.01.2025 1) TKWD:- ESP Pucca number issued on 30.08.2024 (GM (W) BB/P/20909 ) Final SIP received on 21.10.2024. SWR Sent to HQ for CRS sanction on 28.05.2025 . CRS observations received on 25.06.2025, Condonation paper Undern Division approval. 2) BALE : - ESP Pucca number issued on 29.08.2024. (GM (W) BB/P/17716/Alt Final SIP received on 7.11.2024 Revised ESP as per ground reality approved by division and sent to HQ on 04.08.2025. Engg . HQ returned with observation on 28.08.2025, sent to HQ on 11.09.2025. 3) BRB :- ESP Pucca number issued on 30.08.2024 (GM (W) BB/P/20910) Final SIP received on 28.10.2024 for preparation of SWR SWR prepared & approved by division. Sent to S&T on 06.06.2025 and with Engg . From 26.08.25 for preparation of CRS papers. 3 Proposal for Safety fencing along the track and pedestrian subways under SUR division. (Proposed by Sr. DEN (Co) 2023-24 474.85 Cr CAP TDC : Mar. 26 (18 Months from LOA issued Accounts vetted on 02.08.24 N.A . N.A. N.A- 03 Tender LOA issued on 16.08.2024. 13 nos LOA issued on 09.09.2024. Total 16 no. of tenders are floated and opened on 26.07.2024. Out of which 03 nos. of tenders are finalized and LOA issued on 16.08.2024. (Agency; Sajoy Bhumik ) 13 Nos of tender are finalized and LOA issued on 09.09.2024 . SN Section Scope in Km Work completed KM 01 Daund -Solapur 355.40 86.70 02 Solapur-Wadi 255.90 91.00 03 Kurduwadi-Latur 33.61 16.00 04 Kurduwadi-Miraj 11.50 00.00   TOTAL 656.41 193.70

Traffic Facility Works (PH-16) under Umbrella 2024-25 sanctioned works SN Name of work Year /Last San. Cost Allocation/ Exec. Agency Estimates ESP SIP CRS Tender Position Status 1 Akkalkot Road :- Provision of one Long-haul loop line in each direction in SUR-WADI-SUR section 2024-25 Rs. 30.73 Cr. CAP 30.06.2025 Joint survey done on 10.06.25 - - Tender called on 24.07.2025 and opened on 14.08.2025 under Finalization PID Generated on 25.03.2025 (01.05.16.24.54.004) Detailed estimate Account vetting on 30.06.2025. Joint survey done on 10.06.25 ESP approved by division and sent to HQ on 29.07.2025, sent to S&T HQ on 14.08.25. Returned by HQ on 26.08.2025, Reply sent to HQ on 08.09.2025 . 2 Malthan :- Provision of one Long-haul loop line in each direction in Daund- Solpaur section 2024-25 Rs. 43.11 Cr. CAP 30.06.2025 Joint survey done on 19.06.25 - - Tender called on 24.07.2025 and opened on 14.08.2025 under Finalization PID Generated on 28.03.2025 (01.05.16.24.54.005) Detailed estimate Account vetting on 30.06.2025 Joint survey done on 10.06.25 ESP approved by division and sent to HQ on 29.07.2025, sent to S&T HQ on 14.08.25. Returned by HQ on 29.08.2025, Reply sent to HQ on 08.09.2025 3 Bahatangli : Creation of New Block station between Latur-Latur Road section 2024-25 Rs. 45.58 Cr. CAP Under Account vetting. Joint survey done on 05.07.2025 - - PID Generated on 24.07.2025 (01.05.16.25.3.54.001) Detailed estimate is being prepared for account vetting. (S&T has been received, Civil- prepared and Elect TRD DE under preparation.) Pending from 28.07.2025 Joint survey done on 05.07.2025 ESP under Divisional review. New station Gharni - Joint survey done on 20.08.2025

Traffic Facility Works (PH-16) under Umbrella 2025-26 approved by GM SN Name of work Year /Last San. Cost Allocation Estimates ESP SIP CRS Tender Position Status 1 Tikekarwadi- Proposed coaching maintenance depot- Phase-I (444133) New (474008) 2025-26 under Umbrella 2024-25 Rs. 49.52 Cr. CAP Under Divisional Accounts vetting Sent to HQ - - - Abstract estimate vetted by Accounts Dept. on 31.07.2025, Proposal sent to HQ on 31.07.2025 in IRPSM ESP approved by Division and sent to HQ on 25.07.2025. PID No 01.05.16.25.3.54.002 dt. 22.08.2025. Detailed estimate under Account vetting from 28.08.25 2 Boribial :- Provision of additional loop lines with yard remodelling (363667) 2025-26 under Umbrella 2024-25 Rs. 33.72 Cr. CAP Under preparation - - - Approved by GM/CR and Abstract estimate vetted by Division Account dept. on 08.09.2025 and sent to HQ on 10.09.2025 in IRPSM. 3 Daund~Wadi-Provision of Bi-directional Block sections adjacent to Major Station/Yard (8 stations- DHS, KWV, WDS, Bale, SUR, TKWD, SDB & WD) (456245) 2025-26 under Umbrella 2024-25 Rs. 46.86 Cr. CAP Under preparation Under HQ Approval - Approved by GM/CR and Abstract estimate vetted by Division Account dept. on 08.09.2025 and sent to HQ on 10.09.2025 in IRPSM. Out of 8, seven SIP approved by Division and sent to HQ (except WADI) DHS approved by Division, WDS-BALE-SDB-WADI under Divisional approval, KWV-SUR-TKWD under preparation. 4 Wadi~Daund-Conversion of loop line in common loop line where favorable crossover is available. (10 stations) UP side- SVG, KUI, ANG, BGVN and DN side- DUD, BOT, MKPT, WKA, BLNI, JNTR) (413673) 2025-26 under Umbrella 2024-25 Rs. 20.11 Cr. CAP Under preparation - - - Approved by GM/CR and Abstract estimate vetted by Division Account dept. on 10.09.2025 and sent to HQ on 11.09.2025 in IRPSM. 5 Tilati :- Extension of shunting neck and converted into DN goods loop line (Uploaded in IRPSM 08.03.2025) (408856) 2025-26 under Umbrella 2024-25 Rs. 11.81 Cr. CAP Under preparation - - - Approved by GM/CR and Abstract estimate vetted by Division Account dept. on 10.09.2025 and sent to HQ on 11.09.2025 in IRPSM.

SN Name of work Year /Last San. Cost Allocation/ Exec. Agency Estimates ESP SIP CRS Tender Position Status 1 Wadi yard-Shifting of point & Starter signals by 40 m towards SUR end for increasing CSL of NRD lines 2024-25 DPWP 2.31 Cr CAP Accounts vetted on 07.12.24 Division approved On 04.04.2025 . Extension of NRD-2-line work completed on 26.12.2024 . Extension of NRD-1, work Completed on 21.01.2025. ESP: Div. approved on-04.04.25 Sent to HQ on-04.04.25 Resubmitted to HQ on 03.06.2025 . Adv.SIP signed by Sr.DOM on 26.06.2025. ESP under S&T HQ approval from 12.09.2025 2 Solapur yard minor remodeling work for increasing CSL of PF no.3 and releasing of interlocking related to simultaneous movements 2024-25 DPWP 2.37 Cr CAP Accounts vetted on 19.03.25 Under review Engg : Tender Opened on 09.06.25 TC under evaluation. S&T: Tender opened on 06.06.25. TC under process. Elect(TRD): Tender opened on 30.06.25. TC under process. Removal of Point No. 146 A&B and Increase CSL of UP & DN ML no.1 (PF-3) from 576m to 696m by shifting of starter signals and 8 simultaneous movements. Detailed estimate sanctioned on 19.03.2025 ESP processed in E-Das from 04.04.2025 . All Departments review completed now with Engg . dept for compliance. Joint survey done on 05.07.2025 ESP under divisional review. DPWP Sanctioned works status

Works proposed in PWP 2025-26 under above 50 Cr. SN Name of work Cost (in 000’) Current Position. 1 Tikekarwadi : - Proposed Mega Terminal and Coaching maintenance facility Phase-II 1573260 Uploaded in IRPSM 2 Wadi: - Yard remodelling (Uploaded in IRPSM on 18.11.2024) 2074480 ED/Gati Shakti (Traffic) from 02.12.2024 3 Solapur Yard Remodelling (Uploaded in IRPSM on 18.11.2024) 1538898 ED/Gati Shakti (Traffic) from 02.12.2024 4 Modlimb :- Provision of additional loop line with Yard remodelling. (Uploaded in IRPSM on 30.11.2024) 672873 ED/Gati Shakti (Traffic) from 02.12.2024 5 Provision of Chord line connected Kurduwadi -Miraj Main line with Kurduwadi Daund Main line at Kurduwadi station 1923482 Uploaded in IRPSM

Works proposed in WP 2025-26 under Traffic Facility Works (PH-16) Below 50 Cr. SN Name of work Cost (in 000’) Current Position. 01 Hirenanduru - Extension of Loop line with Yard remodelling. (686 to 720 mtrs ) 129553 Uploaded in IRPSM 02 Provision of Pathway at GDR checking 12 stations 245178 Uploaded in IRPSM 03 Bale - Development of 6 stabling sidings (Uploaded in IRPSM 24.04.2025) 307015 Uploaded in IRPSM 04 Murud - Convertion of D class station to B class station between Ausa Road- Dhoki stations in LUR-KWV section 470826 Uploaded in IRPSM 05 Babhulgaon - Creation of New Block station between Pandharpur- Modlimb stations in MRJ-KWV section 474358 Uploaded in IRPSM 06 Bamani - Creation of New Block station between Pandharpur- Sangola stations in MRJ-KWV section 446480 Uploaded in IRPSM 07 Javale - Conversion of ‘D’ class station into ‘B’ Class station between Sangola – Jathroad stations in KWV-MRJ section. (Uploaded in IRPSM on 01.12.2024) 474226 Uploaded in IRPSM 08 Bolwad - Creation of New Block station between Arag - Miraj stations in KWV-MRJ section. (Uploaded in IRPSM on 01.12.2024) 474482 Uploaded in IRPSM 09 Laul: - Creation of New Block station between Kurduwadi-Modlimb stations in KWV-MRJ section. (Uploaded in IRPSM on 01.12.2024) 474482 Uploaded in IRPSM 10 Mahisgaon -Creation of New Block station between Shendri-Kurduwadi stations in LUR-KWV section 474526 Uploaded in IRPSM 11 Savalgi - Provision of one Long-haul loop line in each direction in Solapur-Wadi section 212246 Uploaded in IRPSM 12 Mundhewadi - Provision of one Long-haul loop line in each direction in Daund-Solapur section. 433908 Uploaded in IRPSM 13 Pandharpur - Extension of Bay line by 250 m at Miraj end 110927 Uploaded in IRPSM

SOLAPUR DIVISION CENTRAL RAILWAY GOODS SHED WORKS PROGRESS UNDER PH-16 NIL

SOLAPUR DIVISION CENTRAL RAILWAY Status of Siding, PFTs & GCTs

SN Siding, PFT, GCT Traffic Projection DOA/IPA/DPR Scope Issues 1 ACC WADI Modification / Remodeling Consultant – MGR TDC : Not fixed I/W-15 rakes/month (Dry Fly ash) DOA : 21.12.23. IPA:- 04.10.24 In plant:- 1) Alteration in old plant area, Existing stabling line No. 3,4,5 converted into Pre/Post Fly ash unloading line. 2) Provision of Fly ash pit. 3) Provision of two Crossovers for direct reception facility. FR & CP approved by all BO’s & DRM/SUR and sent to HQ on 22.07.2024 for ‘ IPA ’. PCOM/CR has approved committee for approval of IPA. “IPA” issued vide letter No. TW/ACC/Wadi/SUR/732 dt. 04.10.2024. ESP/DPR received on 21.11.2024 with 2% codal charges of Rs. 19,23,400/- ESP under divisional approval from 22.01.2025 Joint Survey done on 23.05.2025, Revised ESP received on 25.06.2025, Approved by Division on 09.09.2025 and sent to HQ on 10.09.2025 DPR approved by Division and sent to HQ on 07.07.2025 2 NVCL (NUVUCO VISTAS CORPORATION Ltd.) WADI GCT Consultant – RCC/NGP I/W – 37 rakes/month (Coal, Fly Ash, Gypsum) O/W – 66 rakes/month (Bulk, Bagged cement) DOA : 05.3.21 IPA : 30.04.21 ESP : 28.03.23 SIP: Awaited RLY YD : Y-connection from Secunderabad end IN PLANT : 1 Wagon tippler for coal/gypsum unloading, 1 bulk cement loading cum fly ash unloading pit, 1 engine escape line, 2 cement loading line with high level island platform, 1-B/Van Sdg Security deposit awaited. Work not started. Party not responding. As per GCT policy, due to no response, the proposal has been kept in abeyance with approval of competent authority. Advised to party vide this office letter No. SUR/T/205/NVCL/WD dt. 20.01.2025 & 06.03.2025. Reply received from party on 09.06.2025 & letter for resubmission of ESP/DPR sent to party on 13.06.2025 .

SN Siding, PFT, GCT Traffic Projection DOA/IPA/DPR Scope Issues 3 Augmentation of existing railway siding facilities of M / s Ultra Tech Cement , Hotgi Consultant – RITES/Mumbai TDC: I/W-11.5 rakes/month (Clinker, Dry Fly Ash, Gypsum & Lime Stone) O/W – 34 rakes/month (Bulk, Bagged cement) DOA: 15.6.23 IPA: 14.07.23 Rev. IPA:26.03.25 ESP: SIP : IN PLANT– One Bulk Cement line Two Engine escaping cum Holding lines. One Fly Ash unloading line. IPA issued on 14.07.2023 Joint survey has been conducted on 22.10.2024 and revised ESP submitted by party on 28.10.2024 Revised IPA issued by HQ on 26.03.2025. Revised ESP & DPR received on 16.05.2025, ESP S&T, OPTG & Elect TRD review completed. DPR approved by division and sent to HQ on 14.07.2025 Revised ESP approved by division on 14.08.2025 and sent to HQ for review. Returned from Engg . HQ on 28.08.2025 Engg . HQ observation received on 28.08.2025. Reply received from party on 12.09.2025 and sent to HQ on 15.09.2025. 4 Kesoram Cement pvt sdg , (Previously Vasavdatta cement sdg ) Hotgi Consultant – MGR/NDLS I/W – 1.9 rakes/day (Clinker, Dry Fly Ash,) O/W – 2.42 rakes/day (Bagged cement) DOA :04.12.2023 IPA :14.05.2024 ESP : -23.12.2024 SIP : - IN PLANT – One Pre tippling line, One post tippling line, One Holding line cum engine escape line, Two loading line, Feasibility report received on 04.12.2023. Proposed under GCT Policy. ‘IPA’ issued on 14.05.2024. DPR approved by DRM on 09.10.2024 ESP Pucca No. GM (W)/BB/P-21107 DT. 23.12.2024 Adv. SIP sent to HQ on 26.05.2025 Adv. SIP with S&T HQ for approval. Revised ESP under HQ approval from 25.07.2025

SOLAPUR DIVISION CENTRAL RAILWAY Status of FLS Survey & Requirements

Additional Hotgi Bye Pass Line 1 The work of Additional Hotgi Bye pass line was sanctioned by GM, CR 06.10.2023 2 Sub Work order was issued to KRCL amounting to Rs. 23.99 Lakhs. 06.11.2023 3 Alternative Alignment Design report was submitted by KRCL on 10.03.2024 and approved by CE (C) Central on 05.04.2024. 05.04.2024.   4 The latest DPR and Cost Estimate was submitted to the Railway Board 04.02.2025  5 Railway Board Sanction for Capacity augmentation projects were obtained 06.02.2025 6 Project Sanctioned amounting to Rs. 176.52 Cr vide Railway Board’s letter no. 2025/ W-I/ CR/ DL/ Hotgi Chord Line/ 10 (E-3493361) dated 22.04.2025. 7 Land Acquisition proposal submitted to Collector, Solapur 23.05.2025. 8 Project Sheet is approved from Open line HQ. ESP of Tilati is under HQ Approval.   9 Notification for 20 A is published in the Gazette of India.  

1 FLS Work Sanctioned 16.10.2023 2 Reconnaissance Survey Completed in Jan & Feb 2024. 3 Primary Alignment Report Submitted on 27.06.2025 and put up for approval of Alternative Alignment. 4 Fixing of Primary Control Points Completed on 10.10.2024. 5 Levelling along Project Route Completed on 12.10.2024. 6 Topographic Survey LiDAR Survey and Field Surveys are completed. 7 Traffic Survey Completed. 8 Concept Plans Under compliance of Divisional Operating remarks. 9 Detailed Project Report Preliminary designs, Estimation in progress. Pune to Wadi 3rd & 4th Line

1 FLS Work Sanctioned 05.02.2024 2 Reconnaissance Survey Completed in May 2024. 3 Alignment Design Report Submitted on 13.06.2024. 4 Fixing of Primary Control Points Completed on 15.07.2024. 5 levelling along Project Route Completed on 25.07.2024. 6 Topographic Survey LiDAR Survey and Field Surveys are completed. 7 Traffic Survey Completed. 8 Concept Plans Dy. COM (PL), CSMT vide letter no. TW/Survey/ Bye pass lines/737 dt. 11/07/2025 asked to keep the proposal on hold for time being. 9 Detailed Project Report Cost estimate and Draft DPR vetted by Associate Finance. Submitted to HQ Finance for concurrence. Kurduwadi Chord Line (LUR-SUR-LUR)

1 FLS Work Sanctioned 05.02.2024 2 Reconnaissance Survey Completed in June & July 2024. 3 Alignment Design Report Submitted on 22.07.2024. 4 Fixing of Primary Control Points Completed on 12.09.2024. 5 levelling along Project Route Will be completed on 30.01.2025. 6 Topographic Survey LiDAR Survey and Field Surveys are completed. 7 Traffic Survey Completed. 8 Concept Plans Under compliance of HQ Operating review. 9 Detailed Project Report DPR and Cost Estimate is under preparation. Kalaburagi Latur new BG Line

Constraints:- PVR-DD & vice versa trains require Engine/ BV reversal at Kurduwadi Justification: Kurduwadi is a very busy Railway junction of Solapur division of Central Railway. Handling four directional traffic makes the operations more complicated. Solapur – Latur – Solapur & Daund – Pandharpur – Daund trains require loco reversal at Kurduwadi resulting in detention of Mail/Exp trains (30minutes) & Goods trains (2 hrs). To reduce the detention of trains at Kurduwadi junction, there is a need to construct a chord line at KURDUWADI connecting to Dhavlas and Laul stations, bypassing Kurduwadi station. Benefits: The project if sanctioned will be contributing for the following points from operational point of view, Reduce the detention of trains Ease congestion of Kurduwadi station Increase average speed of Freight trains Improve wagon turn round Increase availability of wagons for loading Enhance safety in train operations, and Improve overall mobility of operation Chord line at Kurduwadi connecting to Dhavlas and Laul stations (PVR-DD-PVR)

Justification: Kurduwadi is a very busy Railway junction of Solapur division of Central Railway. Handling four directional traffic makes the operations more complicated. Also, POH/ROH workshop activities are playing vital role in Kurduwadi yard. POH (Coaching) workshop is required at Kurduwadi . A joint survey was conducted on 21.08.2025 regarding feasibility for POH (Coaching) workshop at Chink-Hill (Old RPF Training Centre) Near KWV. Benefits: The project if sanctioned will be contributing for the following points from operational point of view, maintains operational reliability, minimizes en -route failures, and reduces costly detentions. Minimize safety hazards, and passenger inconvenience. Coaches remain fit for service until they are due for maintenance, minimizing in- service failures. POH Shed (Coaching) at Chink-Hill (Old RPF Training Center ) Near Kurduwadi

Constraints:- Bidar-Solapur & vice versa trains require Engine/ BV reversal at Kalaburagi Justification: Kalaburagi is a very busy Railway junction of Solapur division of Central Railway. Handling three directional traffic makes the operations more complicated. Solapur – Taj-Sultanpur – Solapur & vice versa trains require loco reversal at Kalaburagi resulting in detention of Mail/Exp trains (30minutes) & Goods trains (2 hrs). To reduce the detention of trains at Kalaburagi junction, there is a need to construct a chord line connecting to Taj-Sultanpur and Bablad stations, bypassing Kalaburagi station. Benefits: The project if sanctioned will be contributing for the following points from operational point of view, Bidar-Solapur & Solapur-Bidar more trains can be handled. Bidar-CSMT-Bidar new train can be introduced. Avoid train detention at Kalaburagi. Increase average speed of Freight trains Improve wagon turn round Increase availability of wagons for loading Enhance safety in train operations, and Improve overall mobility of operation Chord Line from Taj-Sultanpur to Solapur connected at Bablad (Bidar-SUR-Bidar)

SOLAPUR DIVISION CENTRAL RAILWAY Mega Terminal proposal at Tikekarwadi

TIKEKARWADI-Coaching Maintenance Depot in Phase-I & II. Tikekarwadi- Proposed coaching maintenance depot- Phase-I, PH-16, sanctioned in 2025-26, Total cost of Rs. 46.26 Cr. Following works are proposed in Phase-I Existing UP loop line converted into UP & DN common line. Existing Ballast siding converted into DN reception cum UP departure line, Provision of Two stabling sidings of 750 m each Provision of Two Washing cum pit sidings with connectivity at Wadi end only. Tandem wheel lathe line. Alteration in EI panel for removal & placement. Tikekarwadi- Proposed coaching maintenance depot- Phase-II, Proposed in PH-16, 2025-26 for Total cost of Rs. 157.32 Cr. and sent to HQ. Following works are proposed in Phase-II All lines (Total 7 lines including Main lines) to be converted into common line for reception and dispatch. Provision of Four stabling lines with both end connectivity. Provision of One shunting necks of 750 m at Solapur end. Provision of Engine escape line. Provision of Two pit lines of 750 m (Pit 650 m) with both end connectivity with ACWM. Provision of Two Sick lines of 400 m each, drop pit line connected to Sick line with Bogie Repair shop with both end connectivity and Alteration in existing EI & Proposed CYM office with EI & S&T cabins for proper shunt signal shunt signal movement.

TIKEKARWADI-Coaching Maintenance Depot Master plan