Pembangunan Jembatan Jalur Ganda Antara Cirebon – Larangan Lintas Cirebon - Kroya By : Surono, ST 2013
Gambaran Umum lokasi Pekerjaan ST. Prujakan ST. Luwung ST. Sindang Laut ST. Karang Suwung ST. Ciledug ST. Larangan ST. Ketanggungan ST. Ketanggungan Barat Existing Track New Track Stasiun BH 728 BH 736 BH 745 BH 776 BH 777 BH 785 BH 795 BH 807 BH 824 BH 831 BH 856 BH 883 BH 911 BH 924 BH 926 BH 934 BH 937 BH 941 BH 953 BH 961 By : Surono, ST
Pekerjaan Persiapan Pekerjaan Tanah Pekerjaan Substructure Bored Pile Abutment/Pier Konstruksi Pengaman Abutment/Pier Pekerjaan Superstructure Struktur Rangka Baja Jembatan Beton (Girder) Pekerjaan Penyelesaian Items Pekerjaan Jembatan By : Surono, ST
Administrasi Teknik Pengendalian Mutu Time Schedule Shop Drawing Material Sample Sheet (MSS) Request For Inspection (RFI) Request For Measurement (RFM) Checklist Pekerjaan Progress Report Photograph Activity As Built Drawing Uji Material Tanah Timbunan Uji Kuat Tarik dan Tekuk Besi Tulangan Uji Kuat Tekan Beton PDA Test Vibration Test Uji Material Jembatan Quality Control By : Surono, ST
Manual Hummer Electric Hummer Bor Mesin Test (Bor Log) By : Surono, ST
Tanah Jenis Pasir Tanah Jenis Lempung/Lanau Nilai N Kepadatan (Relative Density) 0 - 4 Sangat Lepas (Very Loose) 4 - 10 Lepas (Loose) 10 - 30 Sedang (Medium) 30 - 50 Padat (Dense) > 50 Sangat Padat (Very Dense) Nilai N Kekerasan (Consistency) 0 - 2 Sangat Lunak (Very soft) 2 - 4 Lunak (Soft) 4 - 8 Sedang (Medium stiff) 8 - 15 Keras (Stiff) 15 - 30 Sangat Keras (Very stiff) > 30 Keras sekali (Hard) Data SPT By : Surono, ST
Analisis Daya Dukung Bored Pile Data yang diperlukan untuk analisis daya dukung bored pile : Sebelum Konstruksi : Data hasil sondir Data hasil SPT Data Parameter Kuat Geser Tanah Setelah Konstruksi : Loading Test/PDA Test By : Surono, ST
General View By : Surono, ST
General Drawing Of Abutment By : Surono, ST
Peralatan Bored Pile (Mesin Mekanis) Mesin Bored Pile : - Kelly - Auger - Drilling Bucket - Cleaning Bucket Service Crane Casing Temporary Pipa Tremie Corong Cor By : Surono, ST
Metode Pelaksanaan Bored Pile By : Surono, ST
Peralatan Bored Pile (Mesin Semi Mekanis) Mesin Bored Pile : - Diesel Penggerak - Stang Bor - Mata Bor (Cross Bit) Casing Temporary Pipa Tremie Corong Cor By : Surono, ST
Mesin Mekanis Mesin Semi Mekanis Pekerjaan Bored Pile By : Surono, ST
Loading Test By : Surono, ST Pembebanan Grafik Load vs Settlement
Peralatan PDA Test Alat PDA Test By : Surono, ST
Pemasangan Accelerometer dan Transduser Sofware Analisis PDA Test By : Surono, ST
Hasil PDA Test Hasil Analisis Hasil PDA Test By : Surono, ST
Pekerjaan Galian Abutment dan Cut Of Level Bored Pile By : Surono, ST