Peshawar City UPU Pedestrian Bridges.pptx

AvaisHidayat 11 views 27 slides Jul 22, 2024
Slide 1
Slide 1 of 27
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27

About This Presentation

Peshawar City UPU Pedestrian Bridges possible solutions


Slide Content

PEDESTRIAN BRIDGE CONNECTING CIVIL SECRETARIAT TO BRT STATION

CIVIL SECRETARIAT PESHAWAR Accessibility to Civil Secretariat is from two main Roads N-5 and Saddar Road No public transport is serving these two roads. An estimated amount of 6 thousand employees work in Civil Secretariat Total of 3500 to 4000 employees are using public transport Presently 500 employees using BRT Growth in daily BRT commuters is expected to create increase demand for pedestrian bridges from many places on the corridor to serve more people and to increase the rider ship.

BRT ROUTE Cantt Area Civil Secretariat Pedestrian/Cycle/Motorcycle Vehicle Entrance Pedestrian Vehicle Entrance Entrances to Secretariat

steel truss STEEL Prefabricated pedestrian steel truss bridges are the most commonly used throughout the world, due to their easy and reliable construction techniques. In BRT all the pedestrian bridges are of steel TYPES OF BRIDGES

CONCRETE Strong structure Less maintenance Cost Multiple design options TYPES OF BRIDGES

Considerations In Selecting the Station Distance Obstacles free corridor Easy and Fast Construction Security Better Integration in existing infrastructure Aesthetics

DESIGN CONSIDERATIONS Parameter Minimum Maximum Length 150’0 ” 250’0” Width 8’0” 15’0” South Elevation 20’7” 25’7 ” North Elevation 25’0” Head Clearance* 0’0” 1’1” Grade -5% 5%

Design Loads Load Name Load Type Calculated Design Load Reference Dead Load (DL) Gravity 60 psf - Live Load (LL) Gravity 90 psf AASHTO Pedestrian Bridge Design Guide Snow Load (SL) Gravity 30 psf ASCE 7 Earthquake Load (E) Lateral 2.8 kips ASCE 7 & USGS

PROPOSED ALLINGMENTS

OPTION #1 SECRNO CHOWK STATION

Judicial Complex Provincial Assembly CIVIL SECRETARIAT Central Jail 362 meters 211 meters

SECRNO CHOWK STATION PROS Could serve Civil Secretariat and judicial complex at a same time CONS O bstacle free alignment not available Privacy of private houses compromises Right of Way is not available Over head bridge in ROW

OPTION #2 PARALLEL TO SHUBA BRIDGE

Built up Area Built up Area 215 meter

PARALLEL TO SHUBA BRIDGE PROS Shortest bridge span CONS Bridge lands in front of Central Jail which is security risk High rise building ROW is not enough

OPTION #3 SHUBA BAZAR STATION

BRT STATION BRT STATION Central Jail Built up Area 225 Meters

SHUBA BAZAR STATION PROS Directly initiates from the BRT station Short Bridge span CONS Obstacle free alignment not available MPA hostel in ROW Central Jail High Cost

OPTION #4 SHUBA BAZAR STATION OVER CANAL

290 meter Built up Area

SHUBA BAZAR STATION OVER CANAL PROS Obstacle free alignment available Low cost Easy and Fast construction CONS Has to pass through Gov Buildings

Starting Point Existing Ground situation Site Survey

Site Survey Railway Crossing

EXISTING EXAMPLE

553 M Already existing bridge MAP OF EXISTING EXAMPLE

Existing Example Connection to the existing Pedestrian Bridge

3D Design