Physical Training Risk Assessment

MintchoMintchev 62,424 views 1 slides Mar 08, 2011
Slide 1
Slide 1 of 1
Slide 1
1

About This Presentation

No description available for this slideshow.


Slide Content

RISK MANAGEMENT WORKSHEET
1. Organization and Unit Location:
710
th
ASMC, IL ARNG, North Riverside Armory
2. Page:
1

of

1
3. Mission/Task:
Classroom Instruction
4. Begin Date / Time Group:
(DDTTTTRMMMYY)

5. End Date / Time Group:
(DDTTTTRMMMYY)

6. Date Prepared:

7. Tasks 8. Identify Hazards
9. Initial
Risk Level
10. Develop Controls
11. Residual
Risk Level
12. Implement Controls (“How To”) 13. Who/How Supervised
Conduct
Physical
Training (PT)
Terrain




Hot Weather /
Dehydration





Wild Life


Physical
Injury

Profiles and
Special
Populations

Inclement
Weather
M




M






M


M


M



M
Carefully examine PT area prior
to conducting activities ;



Drink water and monitor
intensity;





Practice awareness, look prior
to sitting down;

Conduct proper warm-up;


Stay within profile limits;



Read weather report; Dress
appropriately;
L




L






L


L


L



L
Warn participants
about uneven terrain ;
Conduct PT on the
best site available

Enforce regular
hydration;
Participants bring
full canteens or
water hydration
systems to PT;

Brief participants;


Brief participants;


Brief participants;



Brief participants;
SGL and PT
Instructor



SGL and PT
Instructor





SGL and PT
Instructor

SGL and PT
Instructor

SGL and PT
Instructor


SGL and PT
Instructor


14. Overall Mission/Task Risk Level After Countermeasures are Implemented:
(Circle Highest Remaining Risk Level)
LOW (L) MODERATE (M) HIGH (H) EXTREMELY HIGH (E)
15. Prepared By:

16. Authority: