PML CALCULATIONS.ppt

1,182 views 53 slides Apr 27, 2023
Slide 1
Slide 1 of 53
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53

About This Presentation

PROBABLE MAXIMUM LOSS IN INSURANCE


Slide Content

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 1
PROBABLE MAXIMUM LOSS
BY
•N. VAIDYANATHAN
•BE(MECH)., D.O.M., M.I.E., F.I.V., F.I.I.I.S.LA.,
M.I.S.NDT, M.I.R.M(UK)
•CHARTERED ENGINEER
•RISK MANAGEMENT CONSULTANT

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 2
PML AGENDA
•NEED FOR PML
•TERMINOLOGY USED
•ADVANTAGES
•DISADVANTAGES
•CALCULATION METHODS
•TAC DEFINITION
•DOCUMENT REQUIREMENTS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 3
“Anestimateofthemonetary loss
whichcanbesustainedbyinsurerson
aSingleRiskasaresultofasinglefire
orexplosion considered bythe
underwriterstobewithintherealmsof
probability.Theestimateignoressuch
remotecoincidence andcatastropheas
maybepossiblebutwhichstillremain
unlikely”.
“definedbyInternationalUnderwriters’
Association(IUA) formerlyknownas
London Insurance andReinsurance
MarketAssociation(LIRMA)“
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 4
Probable Maximum Loss (PML) is
the maximum loss that an insurer
would be expected to incur on a
policy. Probable maximum loss
(PML) is most often associated with
insurance policies on property, such
as fire insurance. The probable
maximum loss represents the worst-
case scenario for an insurer.
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 5
Insurance companies use a wide variety of data
sets, including Probable Maximum Loss (PML),
when determining the risk associated with
underwriting a new insurance policy, a process
which also helps set the premium. Insurers
review past loss experience for similar perils,
demographic and geographic risk profiles, and
industry-wide information to set the premium.
An insurer assumes that a portion of the policies
that it underwrites will incur losses, but that the
bulk of policies will not.
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 6
Insurance companies differ on what probable
maximum loss means. At least three different
approaches to PML exist:
PML is the maximum percentage of risk that
could be subject to a loss at a given point in
time.
PML is the maximum amount of loss that an
insurer could handle in a particular area before
being insolvent.
PML is the total loss that an insurer would
expect to incur on a particular policy.
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 7
PROBABLE MAXIMUM LOSS
•MANY INSURERS FOLLOWED THE
CONCEPT BASED ON SUM INSURED
•STARTED MAINLY WITH FIRE
INSURANCE
•RETENTION BASED ON SUM
INSURED

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 8
PROBABLE MAXIMUM LOSS
•TERMINOLOGY USED:
•PML -PROBABLE MAXIMUM LOSS
-POSSIBLE MAXIMUM LOSS
-POTENTIAL MAXIMUM LOSS
•MPL -MAXIMUM PROBABLE LOSS
•EML -ESTIMATED MAXIMUM LOSS
•NML -NORMAL LOSS EXPECTANCY

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 9
PROBABLE MAXIMUM LOSS
•TERMINOLOGY USED:… CONTD…
•MEL -MAXIMUM ESTIMATED LOSS
•CML -CREDIBLE MAXIMUM LOSS
•MCL -MAXIMUM CREDIBLE LOSS
•FML -FORSEEABLE MAXIMUM LOSS
•MFL -MAXIMUM FORSEEABLE LOSS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 10
Definitions
Numerous definitions in the
market
Insurers have their own
definitions
Most commondefinitions:
Probable Maximum Loss(PML)
Estimated Maximum Loss
(EML)
Maximum Amount Subject
(MAS)
There No single
clear acronym and
for every acronym
there is a definition
and description,
which can further
be interpreted in
different ways …..
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 11
Construction
Occupancy
Protection
Exposures
S-COPE
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 12
Construction
First consideration
Relates to ability to withstand
damage by fire and other perils
and wind
Various Classes based on the
strength and material property
used for construction
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 13
OtherConsiderations
Age
BuildingHeight
FireDivisions
BuildingOpenings
BuildingCodes

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 14
Occupancy
IgnitionSources
Combustibility
Damageability
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 15
Occupancy
Habitational –apartments, hotels, motels,
nursing homes
Office –low hazard
Institutional –schools, churches, hospitals,
government property
Mercantile –department, hardware and
specialty stores
Service –dry cleaners, laundries, auto service
stations
Manufacturing –nature of product
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 16
Hazards
Common hazards
Housekeeping
Heatingequipment
Electricalequipment
Smokingmaterials
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 17
Protection
Keymaybelocationofwatersupply
andfirehydrants
Water hoses/ Fire detectors/ Fire
extinguishers
Smokedetectors
5 -17
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 18
PROBABLE MAXIMUM LOSS
•IT IS GENERALLY BASED ON:
•1. FREQUENCY
•2. SEVERITY OF THE LOSS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 19
PROBABLE MAXIMUM LOSS
•CALCULATION OF PML:
•NO FORMULA AVAILABLE
•NO HARD AND FAST RULES LAID
OUT
•IT IS ONLY A GUESTIMATE
•A COMPLEX EXERCISE
•ANALYSIS OF TECHNICAL DATA

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 20
PROBABLE MAXIMUM LOSS
•ADVANTAGES:
•LARGER SHARES OF RISKS CAN BE
HANDLED
•EASY FOR PLACING LARGE RISKS
•ACHIEVING A BALANCED
PORTFOLIO

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 21
PROBABLE MAXIMUM LOSS
•DISADVANTAGES:
•IT IS ONLY A GUESTIMATE AND
SUBJECTIVE
•LARGER LOSS THAN PML WOULD
BE DISASTEROUS
•NO STANDARD DEFINITION OR
FORMULA
•CONTINOUS REVIEW NOT
POSSIBLE

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 22N. VAIDYANATHAN 22
WhileinpracticePMLunderwritingisapowerfultoolinthehands
ofunderwriters,ithastobeusedwithgreatcareanddiligence.
Thedisadvantagesofthepracticeinclude
PMLisasubjectiveassessmentofmaximum severityofloss,
andtoomuchrelianceonitcanprovecostly.Ifactualloss
exceedsPML,thereinsurerwillsuffer.
JudgmentplaysanimportantroleinthedeterminationofPML,
andmaygowrongifmadebyinexperiencedperson.
ThelowerthePML,thehighertheunderwritingcapacity.Hence
thereisatendencytofixthePMLonthelowersidetogenerate
highercapacity.Atthesametime,thelowerthePML,the
greaterthepossibilityoftheactuallossamountbeinghigher
thananticipated.
Disadvantages ofPML

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 23
PROBABLE MAXIMUM LOSS
•DEFINITION:
•‘ THE PROBABLE MAXIMUM LOSS IS AN
ESTIMATE OF THE MONETORY LOSS
WHICH CAN BE SUSTAINED BY THE
INSURER ON A SINGLE RISK AS A
RESULT OF A SINGLE FIRE OR
EXPLOSION, AS CONSIDERED BY THE
INSURER TO BE WITHIN THE REALMS
OF PROBABILITY. THE ESTIMATE
INGNORES SUCH REMOTE
CATASTROPHES AS MAY BE POSSIBILE
BUT WOULD REMAIN UNLIKELY’

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 24
ELEMENTS OFRISK

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 25
PROBABLE MAXIMUM LOSS
•MANDATORY RISK INSPECTION:
•IT IS MANDATORY TO CARRY OUT
RISK INSPECTION FOR ARRIVING
AT PML ASSESSMENT OR ANY
REVISION THEREAFTER. RISK
INSPECTION MUST BE CARRIED
OUT ATLEAST ONCE IN 2 YEARS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 26
PROBABLE MAXIMUM LOSS
•RISK INSPECTION REPORT:
•PRODUCTION/PROCESS DATA –FLOW
DIAGRAM
•BLOCK WISE PROCESS/OPERATION DATA –
SHOWING PRESSURE/TEMP
•LAY OUT OF THE FACTORY
•EQUIPMENT LAYOUT PLAN
•DETAILS OF CONSTRUCTION
•QUANTITY AND NATURE OF STORAGE
•DETAILS OF HAZARDOUS/ NON HAXARDOUS
GOODS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 27
PROBABLE MAXIMUM LOSS
•RISK INSPECTION REPORT:.. CONT.
•UTILITIES/POWER DISTRIBUTION
•REPAIR FACILITIES
•DETAILS OF SPARES
•RELATIVE IMPORTANCE OF MACHINES
•HOUSE KEEPING/MAINTENANCE
•DISASTER MANAGEMENT PREPAREDNESS
•HAZOP/ HAZAN REPORTS
•DETAILS OF FIRE PROTECTION SYSTEMS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 28
PROBABLE MAXIMUM LOSS
•RISK INSPECTION REPORT:.. CONT.
•POLICY SCHEDULE GIVING BLOCK
WISE SUM INSURED
•GROSS PROFIT AS PER PL ACCOUNT
•SUM INSURED VS GROSS
PROFIT/INDEMNITY PERIOD/TIME
EXCESS
•CLAIM HISTORY
•HISTORY OF CATASTROPHE EVENTS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 29
PROBABLE MAXIMUM LOSS
•RISK INSPECTION REPORT:.. CONT.
•WARNING:
•PML IS ASSESSED ON BASIS OF FIRE AND
EXPLOSION PERILS IN MIND. IN THE
EVENT THE CATASTROPHE (FLOOD,
CYCLONE, EARTHQUAKE ETC) PERILS
ARE DOMINANT, THE RISK INSPECTION
SHOULD QUALIFY THE SAME SUITABLY

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 30
PROBABLE MAXIMUM LOSS
•THE GUIDELINES GIVEN ARE FOR
DETERMINATION OF PML FOR
RISKS WHICH ARE EXPOSED TO
FIRE, SMOKE, WATER DAMAGES
ONLY

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 31
Fire AreaSeparation
Structural Fire AreaSeparation

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 32
PROBABLE MAXIMUM LOSS
•METHODOLOGY:
•FIND OUT DISTANCES BETWEEN
BLOCKS. CONSIDER THE BLOCKS
AS A SINGLE RISK UNLESS THE
FOLLOWING DISTANCES ARE
MAINTAINED FOR THE
OCCUPANCIES MENTIONED
AGAINST THEM

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 33
PROBABLE MAXIMUM LOSS
Occupancy SuperiorClass I Class II
Light hazard 5 M 7 M 10 M
Ordinary Hazard10 M 15 M 20 M
High Hazard 15 M 30 M 50 M
High Piled
storage/ Storage
of Flammable
Liquids/ Gases
50 M 50 M 50 M
CLASS OF CONSTRUCTION

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 34
PROBABLE MAXIMUM LOSS
•ESTIMATE THE DAMAGE RANGE (IN TERMS OF
SUM INSURED) ON THE FOLLOWING BASIS:
•PERCENTAGES FOR LIGHT HAZARD
RISKS ARE SHOWN IN THE NEXT SLIDE.
THE DAMAGE PERCENTAGES SHOULD
BE SUITABLY ARRIVED AND LOADED IN
CASE OF ORDINARY HAZARD RISKS AND
HIGH HAZARD RISKS.

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 35
PROBABLE MAXIMUM LOSS
DescriptionSuperiorClass IClass II
Buildings5-25% 20-50% 30-80%
M/c.
Equipment
10-40% 15-50% 40-90%
Heavy
Precision
25-80% 25-100% 70-100%
Stocks 40-100% 40-100% 70-100%
PERCENTAGES FOR LIGHT HAZARD RISKS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 36
PROBABLE MAXIMUM LOSS
•IN THE EVENT THE LOWER
HAZARD RISK OCCUPANCY IS
WITHIN THE STIPULATED
DISTANCES FROM THE HIGHER
HAZARD RISK, THE PERCENTAGE
DAMAGE IS TO BE TAKEN FROM
THE TABLE ON THE BASIS OF
HIGER HAZARD RISK OCCUPANCY

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 37
PML -EXAMPLE
•CALCULATE PML FOR THE RISK HAVING THE
FOLLOWING DATA:
•RISK –TEXTILE MILLS
•TOTAL SI –100 CRORES
•BLOW ROOM, CARDING, SPINNING ROOMS ARE
SEPARATED FROM EACH OTHER
•WEAVING, WINDING, WARPING, CLOTH
PROCESSING, PACKING ARE COMMUNICATING
WITH EACH OTHER
•FINISHED GOODS GODOWN IS WITHIN 10 M OF
PACKING DEPT
•BUILDINGS NOT COVERED UNDER POLICY

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 38
PML -EXAMPLE
•DATAON SUM INSURED: FINISHED GOODS –64 CRORES
BLOCK MACHINERY SUM
INSURED
STOCKS
BLOW ROOM GEN.MACHINE 1 CRORE 1 CRORE
HEAVY 2 CRORES
CARDING/SPINNING GEN. MACHINE 3 CRORES 2 CRORES
PRECISION 10 CRORES
WEAVING/WINDING
AND OTHERS
GEN.MACHINE 2 CRORES 5 CRORES
HEAVY 10 CRORES

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 39
PML -EXAMPLE
•RISK –TEXTILE MILLS
•SINGLE RISK
•CATEGORY –ORDINARY HAZARD (IN CRORES)
BLOCK
SUM INSU
BLOW
ROOM
CARDING/
SPINNING
WEAVING
WINDING
FINISHED
STOCKS
GEN.MAC
01 03 02
HEAVY/
PRECISIO
02 10 10
STOCKS
01 02 05
FINISHED
STOCKS
64

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 40
PML -EXAMPLE
SR.NOASSETS TOTAL
S.I
% OF
PML
PML
1 GEN.MACH
IN
06 CR 25% 1.5 CR
2 HEAVY/
PRECISION
22 CR 80% 17.6 CR
3 STOCKS 08 CR 100% 8.0 CR
4 FINISHED
STOCKS
64 CR 80% 51.2 CR

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 41
PML -EXAMPLE
SUMMARY:
TOTAL SUM INSURED: 100.00 CRORES
PML ARRIVED AT: 78.30 CRORES

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 42
PML RATINGS
SR.NOPML RATING RANGE IN %
1 MINIMUM PML UPTO 10
2 LOW PML 11 TO 30
3 MODERATE PML 31 TO 60
4 HIGH PML 61 TO 90
5 VERY HIGH PML 91 UPWARDS

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 43
PML –EXAMPLE ---2 method
BY GROUPING BLOCK WISE WITH MERITS
CARDING/
SPINNING
S.INSURED% ge PML PML-SI
GEN.MACH 3.0 CR 50% 1,50,00,000
HEAVY 10.0 CR 70% 7,00,00,000
STOCKS 2.0 CR 85% 1,70,00,000
TOTAL 10,20,00,000

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 44
PML –EXAMPLE ---2 method
BY GROUPING BLOCK WISE WITH MERITS
WEAVING/
WINDING
S.INSURED% ge PML PML-SI
GEN.MACH 2.0 CR 25% 50,00,000
HEAVY 10.0 CR 65% 6,50,00,000
STOCKS 5.0 CR 70% 3,50,00,000
TOTAL 10,50,00,000

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 45
PML –EXAMPLE ---2 method
BY GROUPING BLOCK WISE WITH MERITS
BLOW
ROOM
S.INSURED% ge PML PML-SI
GEN.MACH 1.0 CR 40% 40,00,000
HEAVY 2.0 CR 75% 1,50,00,000
STOCKS 1.0 CR 100% 1,00,00,000
TOTAL 2,90,00,000

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 46
PML –EXAMPLE –2 METHOD
•SUMMARY:
•BLOW ROOM ETC 2,90,00,000
•CARDING/SPINNING 10,20,00,000
•WEAVING/WINDING 10,50,00,000
•FINISHED STOCKS 51,20,00,000
(FINISHED STOCK 64 CR AT 80%)
TOTAL PML 74,80,00,000

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 47
A1
A2
A3
A4
A5
A6
Probable MaximumLoss

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 48
FIRE AREA
SUM
INSURED
MPL
A1
Finished Product
Storage
15 M
15%
-Building
5 M
-Plant & Machinery
-
-Stock
10 M
A3
Raw Paper Stores I &
II
10 M
10%
-Building
4 M
-Plant & Machinery
-
-Stock
6 M
A4
Admin Block 5 M
5%
-Building
5 M
-Plant & Machinery
-
-Stocks
-
FIRE AREA
SUM
INSURED
MPL
A5
Boiler House 10 M
10%
-Building
3 M
-Plant & Machinery
7 M
-Stock
-
A6
Fuel Storage Area 10 M
10%
-Building
-
-Plant & Machinery
4 M
-Stock
6 M
Total Sum Insured
(TSI)
100 M
Production area 50M
Building 20M
Plant and machi 25M
Stocks 5M

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 49
PROBABLE MAXIMUM LOSS
•GUIDELINES FOR DETERMINATION OF
PML FOR RISKS UNDER MBD POLICIES:
•1. IDENTIFY THE MACHINERY WITH
HIGHEST SUM INSURED VALUE
•2. IF DAMAGE TO ONE WILL LEAD
DAMAGES TO OTHER(S), TAKE ALL
MACHINES FOR CALCULATION
•3. HIGER OF THE TWO PML, TO BE
CONSIDERED

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 50
It is hereby noted and agreed that with effect from
March 2019, following amendments will be made to
the contract written under Fire department:
MINIMUM PML TO BE REVISED AS UNDER: IN INR
100%SUM INSURED
(MD+BI)
MINIMUM PML (MD+BI)
UPTO 500 CRORES 100% SUM INSUREDBASIS
500 CRORES TO 1500
CRORES
60% MD + 100% BI–TOP LOCATION
1500 CRORESTO 2500
CRORES
40%MD + 100% BI –TOP LOCATION
ABOVE2500 CRORES 30% MD + 100%BI –TOP LOCATION
All risks with Sum Insured INR 20,000 crores and
above to be referred to GIC Re for approval
before any cession is made.

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 51
3-51
Knowledge of Risk Manager
INSURANCE
SAFETY
Your
INDUSTRY

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN 52
52
ANY QUESTIONS ???

4
2
5
1
3 0011 0010 1010 1101 0001 0100 1011 N. VAIDYANATHAN