Pre and post concreting checks

AmardeepSingh127 1,584 views 36 slides Sep 06, 2017
Slide 1
Slide 1 of 36
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36

About This Presentation

Tolerances in field of civil engineering


Slide Content

Amardeep Singh

To enable systematic process within reasonable cost and time. To have standard Quality System . Measuring constructed works against Workmanship standards, Drawings and Specifications. Acceptable Quality /Tolerances for Concrete Works. Independent Structure report. Address Corrective action.

Visual Free from Defects. No gaps at joints. Interiors free from debris. Adequate support, bracing and tie-back Dimensions Cross-sectional dimensions as per drawing. Penetration / opening for services. Length of precast members (major dimension of unit). Alignment Departure of any point from its position. Verticality. Mean level of staircase thread to temporary benchmark. Level for cast in-situ elements.

Visual Surface Defects -cracks/ damaged threads Twist/ bend/ warpage . Application of sleeves Dimensions Numbers as per drawings. Sizes as per drawings. Inclination of Pockets for smooth extraction after pouring. Alignment/Fixing C/C distances between Bolts/Pockets . Verticality . Stability of Fixing arrangement (welding in case of Bolts/IPs). Removability of Pockets

Dimension for elements / opening for services Cross-sectional dimension of cast in-situ and precast elements. Required opening for services. Precast members: Length Straightness or bow (deviation from intended line) Dimension Twist Flatness

Alignment, plumb and level Departure of any point from its position. Verticality Deviation from mean level. Camber at mid span Exposed surface No visual exposure of coarse aggregates. Cold joint & formwork joint must be smooth. No bulging of structural elements. Free from formwork, nails, zinc strips, etc.

Lifting points / inserts Free from Damages. Position / Placement Sleeve System / Connections Free from concrete droppings or corrosion. Sleeves, grout holes, grout tubes not congested with debris. Position / Placement. Bar protrusion length according to requirements. Bars should be free from bending, cracks or damages.

Interface / Joint R equirements Alignment of horizontal and vertical joint. Joint taper alignment. Jog in alignment of matching edges Sitting of element as per specifications. Installation of sealant and waterproofing as per specifications. Cast-in steel items / welded & bolted connections Position of embedded steel items / Pockets as per drawing. Position of openings for bolt connections. Other requirements as per drawing.