Process fmea

11,081 views 57 slides May 02, 2014
Slide 1
Slide 1 of 57
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57

About This Presentation

Process FMEA course slides


Slide Content

Failure
Mode and
Effects
Analysis
Lawrence Hallett!

Purpose
How to conduct an FMEA.

Origin
Failure mode and effect analysis (FMEA) was one
of the first systematic techniques for failure analysis.
It was developed by reliability engineers in the 1950s
to study problems that might arise from malfunctions
of military systems

Definition of FMEA
A Failure Mode and Effect Analysis uses a
disciplined technique to identify and help eliminate
product and process potential failure modes.
oBy ID of potential failures
oAssessing the risks caused by failure modes and Identify
corrective actions
oPrioritizing corrective actions
oCarry out corrective actions

Most COMMON Types of FMEA's
Design (Potential) Failure Modes and
Effects Analysis-DFMEA
•Focus is on potential design- related failures
and their causes.
!
Process (Potential) Failures Modes and
Effects Analysis-PFMEA
•Focuses is on potential process failures and
their causes.

PFMEA's
!
●Focus is on potential process –related
failures and their causes.
▪Main drive is to understand the process through the
identification of as many potential failures as possible.
oe.g. Incorrect material used
●PFMEA typically assumes that the design
is sound.
●Development of Recommended Actions is
targeted at eliminating the Root Cause of
the potential failures.

PFMEA's benefits
•Identifies Process Functions
and Req’s!
•Identifies potential failure
modes!
•Assesses effect of failure!
•Identifies causes of failures!
•Identifies process controls!
•Identifies confirmed Critical
Characteristics!
•Provides an objective base for
action

PFMEA's outputs

PFMEA's - who
prepares it
•A team effort - including!
•Manufacturing/production!
•Engineering!
•Design !
•Quality!
•Test!
!
•However it is a moving feast

Related Documents

PFMEA
Three Parts:
●Process Flow Diagram (PFD)
●Process Failure Mode and Effects
Analysis (PFMEA)
●Process Control Plan (PCP)

Product Definition:
Key Product Characteristics, DFMEA
Process Definition:
Process Flow Diagram (PFD),
Failure Mode Analysis:
PFMEA
Control Strategy:
Control Plan,
Error proofing
Customer Requirements:
Manufacturing:
Work Instructions & Process Monitoring
Information Flow
SOR, Vehicle Tech Specs,
System Technical Specs
Product and Process Characteristics

DFMEA/PFMEA Information
Interrelationships
DFMEA
Design FMEA
Process Flow
Diagram
PFMEA
Process FMEA
Boundary (Block)
Diagram, P- Diagram,
Etc.
Design Verification
Plan & Report
(DVP&R)
Process Control
Plan

Process Function/Requirements

Process Flow Diagrams
●The Process Flow
Diagram provides a
logical (visual)
depiction of the
process that is being
analyzed.

12
●The SAE/AIAG PFMEA guidelines describe two
methods of defining process functions. 

Either or both may be used.
●Process Functions may be described in terms of:
▪The product features/characteristics that are
created
or
▪The process actions that are performed
●Process functions should be identified in detail
as necessary to provide information for the
PFMEA to develop effective Process Controls
Process Function / Requirement

13
●Consider a simple operation to drill a hole in a
metal part
●The product characteristics & requirements are:
▪Hole size: 4.00 mm +/- 0.13
▪Hole Location:

X = 28.0 mm +/- 0.2
Y = 15.0 mm +/- 0.2
▪Perpendicular to surface, no burrs, etc.
●The process operation must create these
product characteristics and meet the
requirements
Process Function / Requirement
X
Y
4.00

●To drill the correct hole size in the
specified location, the process must:
▪Position and hold the part
▪Align the part fixturing

with the drill position
▪Assure the correct drill

bit size is used
▪Set and control drill speed
▪Anticipate tool wear and

schedule preventive maintenance
●If the Function/Requirement is defined in
the PFMEA as “Drill Hole” could any of
these be missed?
Process Function / Requirement

Process Flow Diagram (PFD)
●Process Flow Diagram is the foundation
▪The process must be defined step by step, including
interfaces
▪The PFD provides the structure to document what product
characteristics and requirements (OUTPUTS) are affected
by a given operation and how these characteristics and
sources of variation are controlled (INPUTS)
▪PFD is a graphical representation of every possible path a
part can take through the anticipated manufacturing
process
▪A well defined PFD establishes the foundation for the
PFMEA
●Helps in developing equipment specifications.
▪How will the process control non-conforming material?
▪How and when will inspections be performed, what is
required?
▪How and when will parts be re-introduced into the
process?

PFD Example

PFD Feeds PFMEA

Identify the Function(s)
●Function is a description of what the
Process does to meet the requirements
➢Related to process specification and product
characteristics
➢Comes from the PFD operation description column
●Functions can be described as:
➢Do this operation…
➢To this part or material…
➢With this tooling or equipment…

Potential Failure Mode

Potential Failure Modes
Often missed

Potential Effect of Failure

Example Failure
Modes
Effect of Failure
Case
assembled
but not to the
correct height
Fails height check
causing rework(3) if
not detected
Connector
corrosion leading to
intermittence
premature part
failure(8)

Potential
Effects
of
Failure

Potential
Effects
of
Failure

Severity Ranking

Severity

Potential Cause of Failure

Cause of Failure

How to identify Cause of Failure

Developing Causes
Always assume a direct correlation between cause and failure
i.e if the cause occurs then the failure mode occurs

Assumptions

Assumptions

Occurrence

How to identify Occurrence

Occurrence Evaluation Criteria
Probability of Likely Failure Rates Over Design Life Ranking
Failure
SUGGESTED OCCURRENCE EVALUATION CRITERIA
Very High: Persistent failures
High: Frequent failures
Moderate: Occasional failures
Low: Relatively few failures
Remote: Failure is unlikely
≥ 100 per thousand vehicles/items
50 per thousand vehicles/items
20 per thousand vehicles/items
10 per thousand vehicles/items
5 per thousand vehicles/items
2 per thousand vehicles/items
1 per thousand vehicles/items
0.5 per thousand vehicles/items
0.1 per thousand vehicles/items
≤ 0.01 per thousand vehicles/items
10
9
8
7
6
5
4
3
2
1

Current controls

Current Controls
2 types of controls
Prevention
Prevent the Cause/mechanism or failure mode/effect from
occurring or reduce their rate of occurrence
!
Detection
Detect the cause/mechanism and lead to corrective action

How to identify process controls

Current Controls

Detection ranking

Detection Rankings

Risk Priority Number

Analysis Of Risk
▪ RPN / RISK PRIORITY NUMBER
▪ What Is Risk?
▪ Probability of danger
▪ Severity/Occurrence/Cause

Evaluation by RPN Only
▪ Case 1
o S=5 O=5 D=2 RPN = 50
▪ Case 2
o S=3 O=3 D=6 RPN = 54
▪ Case 3
o S=2 O=10, D=10 = 200
▪ Case 4
o S=9 O=2 D=3 = 54
WHICH ONE
IS WORSE?

Example
▪ Extreme Safety/Regulatory Risk
o =9 & 10 Severity
▪ High Risk to Customer Satisfaction
o Sev. > or = to 5 and Occ > or = 4
▪ Consider Detection only as a measure of Test
Capability.

Actions taken

Actions

Re-rating RPN After Actions Have Occurred

Re-rating RPN After Actions Have
Occurred
▪ Severity typically stays the same.
▪ Occurrence is the primary item to reduce / focus on.
▪ Detection is reduced only as a last resort.
▪ Do not plan to REDUCE RPN with detection actions!!!
o 100% inspection is only 80% effective!
o Reducing RPN with detection does not eliminate failure mode,
or reduce probability of causes
o Detection of 10 is not bad if occurrence is 1

Outputs

●PCP will be based on the previous
activities in PFD and PFMEA.
●Review the PFMEA information developed
& supplied and use to identify:
▪Specific controls that may be needed due to the
information added
▪Identify which controls are Product or Process
oNote any Special Characteristics
oIdentify evaluation methods, frequency and Control
Methods
oNote Reaction Plans (particularly related to NC parts)
Process Control Plan

Process Control Plan Example
Part/
Process
Number
Process Name /

Operation Description
Machine,
Device, Jig,
Tools for Mfg.
Characteristics
Special
Char.
Class.
Methods
Reaction

Plan
No. Product Process
Product / Process
Specification /

Tolerance
Evaluation
Measurement

Technique
Sample
Control Method
SizeFrequency
300Initiate weld sequence
/


Perform TIG weld of
frame parts.
Robotic Arm
controller.

TIG welders.
Weld beads
per design
specification.
Tube welds meet
pull test with
failure in parent
material.

Pull test
using test
fixture 20-1.


1 pc. 


Per shift.


Hydraulic pull test
instruction TI21-01
Process monitoring
form PMF-20-01
Quarantine
material
since last
good pull
test.
Good welds,
no visible
defects.
yesWeld appearance
meets visual
standard.
Operator
evaluation to
Visual Std
TB20-VS1
100%Each
piece.
Visual inspection OWI
#20-01.
Remove part
and send to
repair.
Weld voltage
yes24 Volts AC

+/- 2.0 volts
Machine
Control
100%Each weld
cycle.
Closed-loop machine
control.
Scrap part &
Re-start
welder.
Weld voltageyes24 Volts AC

+/- 2.0 volts
Visual Once
each
Shift start
or
change-
over or
maint.
event.
Set-up OWI #20-02 &
Form PMF-20-02
Periodic
maintenance per PM-
WI #20.
Scrap
current part. 

Shut down.

Notify
maintenance
.
Inert gas flow
rate
yes5 cubic feet / min.

+/- 0.5 cfm
Visual twicePer shift.
Operator cleans gas
cup twice per shift
PM-WI-20. Process
monitoring form
PMF-20-01
Notify
maintenance
.
Inert gas flow
rate
yes5 cubic feet / min.

+/- 0.5 cfm
Visual of
verification
of Flow
Meter
Once
each
Shift start
or
change-
over or
maint.
event
Set-up OWI #20-02 &
Form PMF-20-02.
Equipment
Calibration Procedure
#368
Quarantine
material
since last
good pull
test.

Notify
maintenance
.
Form 818-1 (Rev 12Apr02)
CONTROL PLAN Control Plan No:
Part Number/Latest Change Level Key Contact/Phone Date (Orig.) Date (Rev.)
Customer Part Number Core Team Customer Engineering Approval/Date (If Req'd.)
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd.)
Supplier/Plant Supplier Code Other Approval/Date (If Req'd.) Other Approval/Date (If Req'd.)
Prototype Pre-Launch Production

Process Control Plan Example
Initiate weld sequence /
Confirm Wire feed rate
Initiate weld sequence /
Confirm Weld voltage
Initiate weld sequence /

Perform TIG weld of
frame parts.
Initiate weld sequence /
Confirm Inert Gas flow
rate
Scrap part &
Re-start
welder
Closed-loop machine
control.
Each weld
cycle.
100%Machine
Control
300 mm / minute

+/- 10 mm / min.
yesWeld wire
feed rate
Scrap part
& Re-start
welder
Closed-loop machine
control.
Each weld
cycle.
100%Machine
Control
24 Volts AC

+/- 2.0 volts
yesWeld voltage

Notify
maintena
nce.
Operator cleans gas
cup twice per shift
PM-WI-2500. Process
monitoring form
PMF-20-10
Per shift.
twiceVisual5 cubic feet / min.

+/- 0.5 cfm
yesInert gas flow
rate
Remove
part and
send to
repair.
Visual inspection OWI
#20-010.
Each
piece.
100%Operator
evaluation to
Visual Std
TB20-VS1.
Weld appearance
meets visual
standard.
yesGood welds, no
visible defects.
Scrap current
part.

Shut down.

Notify
maintenance.
Set-up OWI #20-020 &
Form PM-20-020
Predictive
maintenance

pinch roller replace @
180 days.
Shift start
or change-
over or
maint.
event
100%Operator
setup check
and
verification
300 mm / minute

+/- 10 mm / min.
yesWeld wire
feed rate
Quarantine
material
since last
good pull
test.
Notify
maintenan
ce.
Set-up OWI #20-02 &
Form PM-00-02.
Equipment Calibration
Procedure #368
Shift start
or change-
over or
maint.
event
Once
each
Visual
verification of
Flow Meter
5 cubic feet / min.

+/- 0.5 cfm
yesInert gas flow
rate
Scrap
current
part. 

Shut down.

Notify
maintenanc
e.
Set-up OWI #20-02 &
Form PM-20-02
Periodic maintenance
per PM-WI #20.
Shift start
or change-
over or
maint.
event
Once
each
Visual24 Volts AC

+/- 2.0 volts
yesWeld voltage

Quarantine
material
since last
good pull
test.
Hydraulic pull test
instruction TI41-01
Process monitoring
form PM-20-010
Per shift.


1 pc. 


Pull test
using test
fixture 20-1.


Tube welds meet
pull test with failure
in parent material.

Weld beads per
design
specification.
Robotic Arm
TIG welders
and controllers.
300.
.!
Robotic Arm
TIG welders
!
Initiate weld sequence /
Close and latch curtain
300
FrequencySize
Reaction

Plan
Control Method
Sample
Evaluation
Measurement

Technique
Product / Process
Specification /

Tolerance
ProcessProductNo.
Methods
Special
Char.
Class.
Characteristics
Machine,
Device, Jig,
Tools for Mfg.
Process Name /

Operation Description
Part/
Process
Number
Tags