Production Schedule for pre-production.pptx

ashanker0926 12 views 1 slides May 13, 2025
Slide 1
Slide 1 of 1
Slide 1
1

About This Presentation

Pre-production planning.


Slide Content

Production Schedule Production title: The Midnight Fiend Deadline for completion: 16/05/25 Schedule period: 06/05 - 16/05 Arranged by &Date: Aden Shanker 02/05/25 Date Activity Description Type of shot Talent Location Props Costume/Make-up Equipment Time 06/05/25 Studio shoot Poster 1 - picture of static TV and eyes Close up Aden Shanker, Jasmine Shanker SO17 2JU - living room TV None needed Camera, TV, Lighting 10 minutes 06/05/25 Studio shoot Poster 2 - picture of model looking afraid with their mouth covered Mid close-up Aden Shanker, Jason Kaur Photography studio N/A Leather Jacket, yellow or blue t-shirt or hoodie Camera, Lighting 25 minutes 06/05/25 Studio shoot Poster 3 - Picture of m odel sitting in what seems a paralysed or strained state, in an armchair, looking afraid. Mid close-up Aden Shanker, Jason Kaur Photography studio Chair Leather Jacket, yellow or blue t-shirt or hoodie Camera, Lighting 30 minutes
Tags