2 Project Name : Main Package Works (Pkg#1) of BSL for Installation of Electrolysis Plant (Capacity of 250 Nm3/ Hr ) for supply of Hydrogen to CRM-III Owner : Steel Authority of India Ltd., Location : Bokaro Steel Plant, Bokaro Steel City, Bokaro Jharkhand . Project Description:
3 Project Name Installation of Electrolysis Plant for Supply of Hydrogen to CRM-III Main Package works (Pkg#1) of BSL Owner Name Steel Authority of India Limited , Bokaro Steel Plant, Bokaro Steel City - Jharkhand Bidder Scope EPC of 250 Nm3/ Hr Hydrogen plant, O&M for 5 years Electrolyser Technology Alkaline type Site Location Bokaro Steel Plant , Bokaro , Jharkhand Temp. Range (+) 8°C to (+) 45°C Completion Period 08 (Eight) months from the Effective Date of the Contract. Project Summary :
4 Terms Conditions as per Tender GCC/SCC Remarks EMD BG Bid Validity 180 Days Bid Submission Date 23rd Dec 2023 Currency of Bid INR Only Defect Liability 18 months from COF or 12 months form operation acceptance, whichever is earlier Latent Defect till completion of O&M period from the date of commissioning including Defects Liability Period. Limitation of Liability Contract Price LD for Supply & Installation 0.5% per week or part thereof of contract price Maximum LD in delay 10% of total Contract Commercial Conditions
5 1.Mechanical Works: Design and procurement of all mechanical equipment required for the hydrogen generation plant( Electrolyser with accessories, supply pumps, Compressor, Piping etc. ) Installation, testing, and commissioning of mechanical equipment Structural works for supporting the mechanical equipment 2.Electrical Works: Design and procurement of all electrical equipment required for the hydrogen generation plant(HT panels, LT panels, Transformers, Rectifier system, Bus ducts etc.) Installation, testing, and commissioning of electrical equipment Electrical cabling works for power supply and control systems Lighting and earthing works 3.Civil Works: Design and procurement of civil materials required for the hydrogen generation plant Site preparation and earthworks Construction of foundations for the mechanical and electrical equipment Construction of control room and other civil structures Scope Of Work:
6 The EPC (Engineering, Procurement, and Construction) project for the generation of hydrogen at the Bokaro plant of SAIL (Steel Authority of India Limited) involves the design, procurement, and construction of a hydrogen generation plant that will utilize an Alkaline electrolyser . The plant will be equipped with modern technology to ensure efficient and safe operation. Our scope of work will include mechanical, electrical, and civil works required for the installation, testing, and commissioning of the electrolyser , as well as other associated equipment. The project is expected to significantly enhance the production capacity of the Bokaro plant and contribute to the growth of the Indian steel industry. To Summarize:
Project Summary 9 Project Name 10 TPD Methanol Synthesis Plant Package at NTPC Vindhyachal Owner Name NTPC Limited Bidder Scope EPC of Methanol Plant excluding Methanol Reactor (supply), Basic Engineering is by Toyo Japan and Residual/ detail engg . by Bidder. Site Location NTPC Vindhyachal Thermal Plant, Vindhyachal , UP. Project Comp. 12 (Twelve) months from the Effective Date of the Contract.
10 Commercial Conditions Terms Conditions as per Tender GCC/SCC EMD 20 MINR (in the form of BG) Bid Validity 6 Months Bid Submission Date 1st Dec 2022 Currency of Payment INR Only Defect Liability 18 months from COF or 12 months form operation acceptance, whichever is earlier Latent Defect 5 years from the end of defect liability period Limitation of Liability total Contract Price less payments already released to the Contractor LD for Delay in COF 7.02 Lakhs per day Maximum LD in delay 5% of total Contract LD for Performance No LD Bid Submission Online Reverse Bidding No
Columns/ Towers Heat Exchangers Drums & Tanks Crude Methanol Filters & Silencers Pumps Compressors Compressed Air & Dryer N2 Generation Package Dosing Package Cooling Water Package Effluent Treatment System Flare Stack Package Fire Detection & Fighting System LP Steam PRDS Station HVAC Piping, Valves & Supports 11kV/415V Transformer HT & LT Switchgear LT Busduct Energy Meter Battery & Battery Charger Earthing & Lightning Protection Gen Set ACDB & DCDB HT, LT & Control Cables Illumination System Communication System PLC System Public Address System Flow Transmitter Level Instruments Pressure Instruments Temperature Instruments Analyzers Instrumentation cables Misc. Major Scope of Supply Mechanical 11 Electrical Control and Instrumentation
NTPC Badarp ur Project 12
13 Project Description Project Name: Hydrogen Fueling Station for Green Hydrogen Mobility Pilot Min. 260 kg in max. 10 hours of operation Project Location: Badarpur, New Delhi, India Owner: NTPC Ltd.
14 Project Summary Project Name Hydrogen Fueling Station for Green Hydrogen Mobility Pilot Owner Name NTPC Badarpur Electrolyser Technology Alkaline, complying to ISO 22734:2019 No. of Electrolyser Units 2X50% Capacity (2X150 Nm3/hr.) 2 independent stream of operation starting from rectifier till compressor Hydrogen generation Min. 260 kg in max. 10 hours of operation Site Location NTPC Badarpur, New Delhi Bidder Scope EPC of project, O&M for 3 Years Completion Period 09 (Nine) months from the Effective Date of the Contract.
15 Commercial Conditions Terms Conditions as per Tender GCC/SCC Remarks EMD 1 Crore (in the form LC or BG) Bid Validity 180 Days Bid Submission Date 16th Feb 2023 Time 2:00PM Currency of Bid INR Only Contracts Formation Contract-1: Ex. Works Supply Contract-2: All Services Contract-3: O&M for 3 Years Defect Liability Defect Liability period shall be for three year Mode of Payment Against LC The value of L/C will be as per dispatch schedule for each quarter of year Limitation of Liability Contract Price LD for Delay in Commissioning 4,43,000 INR per Day Max. LD: 5% of Contract ( I & II ) Warranty Clause Electrolyser Module: 5 Years from Commissioning Other Equipment’s: 3 Years from Commissioning
Electrolyser (300 Nm3/ Hr ) with Aux. Hydrogen Compressors Hydrogen Storage (200 Bar) Hydrogen Storage (500 Bar) Hydrogen Dispensing System BESS (80 kW/ 600kWh) Rooftop Solar (40 kW) Micro Vertical Wind Turbine (20 kW) ETP with neutralizing pit HVAC Fire detection & protection system Piping, Valves & Supports Distribution transformer Rectifier transformer Rectifier PCC/ MCC Panel Lighting Panel LT Switchgear LT Busduct Battery & Battery Charger Earthing & Lightning Protection Energy Meter ACDB & DCDB Power & Control Cables Illumination System Integrated Control System PLC & SCADA (SA +HGB) HMI Operator Work Station Engineering Work Station UPS- Redundant Instruments H2 Leak Detection system Instrumentation cables Misc. Major Scope of Supply Mechanical 16 Electrical Control and Instrumentation