QRM-02.03.2024 dsr.pptx FOR CONSTRUCTION

samirkumar467056 22 views 58 slides Jul 25, 2024
Slide 1
Slide 1 of 58
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58

About This Presentation

QUALITY PPT FOR CONSTRUCTION


Slide Content

SITE NAME: DSR SSI TWIN TOWERS AYATI CONSTRUCTIONS & ESTATES LLP TOWER HEIGHT:A-BLOCK(4B+G+FF+TS+42),B-BLOCK(4B+G+TS+43) Location: PUPPALAGUDA, HYDERABAD QRM Meeting Date:08-03-24

1. QUALITY OBSERVATIONS 2. GOOD PRACTICES AND BAD PRACTICES 3. PMC/CLIENT MAJOR REPEATED COMMENTS 4. QUALITY ISSUES AND NCR ` INTRODUCTION:

QUALITY OBSERVATIONS A-BLOCK B-BLOCK PODIUM

QUALITY OBSERVATIONS A-BLOCK

LOCATION: A-BLOCK, 3 rd FLOOR,POUR-1,ARTIFICIAL GRASS TURF AREA HONEYCOMBS FOUND. ROOT CAUSE: LACK OF SUPERVISION NOT DONE PROPER MALLETING WITH RUBBER HAMMER CORRECTIVE ACTION: 1.REMOVE OFF LOOSE PARTICALS AND BINDING WIRES 2.FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: AFTER CONCRETING PROPER MALLETING SHOULD BE DONE STATUS: CLOSED 03.02.24 04.02.24

LOCATION: A-BLOCK, 3 rd FLOOR,PARTY AREA,COLUMN BOTTOM HONEYCOMBS FOUND. ROOT CAUSE: LACK OF SUPERVISION NOT PACKING WITH FOAM SHEET PROPERLLY CORRECTIVE ACTION: 1.REMOVE OFF LOOSE PARTICALS AND FOAM SHEET 2.FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: BEFORE CONCRETING PROVIDE FOAM SHEET IN GAPS STATUS: CLOSED 14.02.24 14.02.24

LOCATION: A-BLOCK, GROUND FLOOR,SW-3, WALL BULGE 20MM FOUND . ROOT CAUSE: LACK OF SUPERVISION NOT PROVIDE PROPER TIEROD AND SUPPORTS CORRECTIVE ACTION: 1.CHIPPING OF BULGE SURFACE AND CLEAN WITH WATER 2.FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: BEFORE CONCRETING PROVIDE PROPER TIEROD AND SUPPORTS STATUS:OPEN

LOCATION: A-BLOCK, GROUND FLOOR,SW-3, WALL BULGE 25MM FOUND . ROOT CAUSE: LACK OF SUPERVISION NOT PROVIDE PROPER SUPPORTS CORRECTIVE ACTION: 1.CHIPPING AND GRINDING TO BULGED SURFACE 2.FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: BEFORE CONCRETING PROVIDE PROPER SUPPORTS STATUS:OPEN

LOCATION: A-BLOCK, 3 rd FLOOR, MASTER SUIT ROOM,WINDOW OPENING TOP CONCRETE FILLED IN GROOVE AREA FOUND . ROOT CAUSE: LACK OF SUPERVISION NOT PROVIDE PROP HEAD WITH GROOVE CORRECTIVE ACTION: ENSURE PROPER SIZE GROOVE CUTTING AND CHIPPING TO BE . 2.FINISH WITH APPROVED METHODOLGY. AFTER THAT MAKE SURFACE GRINDING . PREVENTIVE ACTION : PROVIDE PROP HEAD WITH GROOVE STATUS:OPEN

QUALITY OBSERVATIONS B-BLOCK

LOCATION: B-BLOCK 3 rd FLOOR, SUIT ROOM-02 ENTRANCE FOYER AREA , OPPOSITE LIFT LOBY ENTRANCE, HONEYCOMBS FOUND. ROOT CAUSE: LACK OF SUPERVISION NOT REMOVE BINDING WIRES AFTER TYING WORK COMPLETED CORRECTIVE ACTION: 1.REMOVE OFF LOOSE PARTICALS AND BINDING WIRES 2.FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: PEP TALK CONDUCTED TO BARBENDERS AND CORPERNTERS . STATUS: CLOSED 05-02-2024 05-02-2024

LOCATION: B-BLOCK 4 TH FLOOR SUIT ROOM-01, CUTOUT BOTTOM REINFORCEMENT FOUND. ROOT CAUSE: LACK OF SUPERVISION NOT DONE PROPER MALLETING WITH RUBBER HAMMER CORRECTIVE ACTION: 1. SURFACE AREA SHOULD BE SHIPPING, REMOVE OFF LOOSE PARTICALS , CLEAN WITH WATER 2.FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: PROVIDE BOTTOM COVER BLOCKS AND AFTER CONCRETING MALLETING SHOULD BE DONE STATUS: CLOSED 26-02-2024 26-02-2024

LOCATION: B-BLOCK SECOND AND THIRD FLOOR SUIT-3 WINDOW-4, PROP HEAD WITH GROOVE NOT PROVIDE ROOT CAUSE: IMPROPER SUPERVISION NOT PROVIDE GROOVE PROP HEAD CORRECTIVE ACTION: 1. PROPER SIZE GROOVE CUTTING AND CHIPPING TO BE DONE. AFTER THAT MAKE SURFACE GRINDING . PREVENTIVE ACTION: 1.PROVIDE GROOVE PROP HEAD. STATUS: CLOSED 24-02-2024 24-02-2024

LOCATION: B-BLOCK SECOND FLOOR LIFT LOBBY AREA HONEYCOMBS FOUND ROOT CAUSE: IMPROPER SUPERVISION AFTER CONCRETING MELLETING NOT DONE CORRECTIVE ACTION: REMOVE LOOSE PARTICALS FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: DURING CONCRETING MELLETING SHOULD BE DONE STATUS: CLOSED 03-02-2024 03-02-2024

LOCATION: B-BLOCK THIRD FLOOR STAIRCASE-1, FLIGHT-1 TOP, HONEYCOMBS FOUND ROOT CAUSE: IMPROPER SUPERVISION AFTER CONCRETING MELLETING NOT DONE CORRECTIVE ACTION: REMOVE LOOSE PARTICALS FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: DURING CONCRETING MELLETING HAS SHOULD BE DONE STATUS: CLOSED 25-02-2024 25-02-2024

LOCATION: B-BLOCK SECOND FLOOR ARTIFICIAL GRASS TURF AREA, WALL SURFACE PEEL OFF FOUND ROOT CAUSE: IMPROPER SUPERVISION SHUTTERING OIL NOT APPLY TO MIVAN PANELS, AND NOT CLEAN PANELS AFTER DE-SHUTTERING CORRECTIVE ACTION: LOOSE PARTICALS REMOVED AND CLEAN THE SURFACE WITH WATER FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: CLEAN THE PANEL REGULARLLY BEFORE FIXING AND APPLY SHUTTERING OIL STATUS: CLOSED 25-02-2024 25-02-2024

LOCATION: B-BLOCK 5 TH FLOOR MASTER SUIT HONEYCOMBS FOUND ROOT CAUSE: IMPROPER SUPERVISION AFTER CONCRETING MELLETING NOT DONE CORRECTIVE ACTION: LOOSE PARTICALS REMOVED AND CLEAN THE SURFACE WITH WATER FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: AFTER CONCRETE MELLETING NEED TO BE DONE STATUS: CLOSE 03-03-2024

LOCATION: B-BLOCK 3 RD FLOOR STAIRCASE-1, BULGE FOUND ROOT CAUSE: IMPROPER SUPERVISION NOT PROVIDE PROPER SUPPORTS CORRECTIVE ACTION: BULGE SURFACE CHIPPING AND CLEAN THE SURFACE WITH WATER FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: PROVIDE PROPER SUPPORTING TO PANELS STATUS: OPEN

LOCATION: B-BLOCK GROUND FLOOR SHEAR WALL-9 BULGE FOUND ROOT CAUSE: IMPROPER SUPERVISION NOT PROVIDE PROPER SUPPORTS CORRECTIVE ACTION: BULGE SURFACE CHIPPING AND CLEAN THE SURFACE WITH WATER FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: PROVIDE PROPER SUPPORTING TO PANELS STATUS: OPEN

LOCATION: B-BLOCK GROUND FLOOR SHEAR WALL-10 BULGE FOUND ROOT CAUSE: IMPROPER SUPERVISION NOT PROVIDE PROPER SUPPORTS CORRECTIVE ACTION: BULGE SURFACE CHIPPING AND CLEAN THE SURFACE WITH WATER FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: PROVIDE PROPER SUPPORTING TO PANELS STATUS: OPEN

QUALITY OBSERVATIONS PODIUM

WEST SIDE FOOTING CONCRETE WASTAGE DUE TO FOOTING PASCHAL SHUTTERING BULGED

PCC NOT DONE AS PER DRAWING DIMENSIONS . FOOTING MARKING COMES ON EDGE OF PCC

LOCATION: SOUTH SIDE RETAINING WALL HONEY COMBS FOUND ROOT CAUSE: IMPROPER SUPERVISION NOT DONE PROPER MALLETING WITH RUBBER HAMMER CORRECTIVE ACTION: REMOVE LOOSE PARTICALS AND CLEANING WITH WATER FINISH WITH APPROVED METHODOLGY PREVENTIVE ACTION: 1.AFTER CONCRETING MALLETING SHOULD BE DONE AND GAPS CLOSE WITH FOAM SHEET STATUS: CLOSED

GOOD PRACTICES

CONCRETE CASTING DATES MENTION WITH STENCIL SHEET

After slab concrete Constructed curing ponds and maintain curing continuously.

AFTER SLAB CONCRETING FINISHING SHOULD BE DONE WITH POWER TROWEL

WALLS CURING SHOULD BE DONE WITH WATER SPRINKLER

After slab concrete Placed Hessain cloths and maintain curing continuously. Due to summer heat increased curing time.

During s lab concrete, Slab levels checked by level gauge rod .

During concrete work boom head cover with bag to overcome falling of concrete while boom shifting to one place to another place

BEFORE START PUMPING OF CONCRETE BOOM HEAD SHIFT TO OUTER OF SLAB AREA FOR PUMP SLURRY WATER(HI PUMP PRIME ) TO OUTSIDE OF SLAB.

During wall concrete continuous Rubber Hammer Malleting doing for avoid air gaps

DURING AND AFTER CONCRETEING CURING DONE ON PANELS FOR DECREASING HEAT

Apply shuttering oil to Mivan Panels with rollers before Panels fixing .

PROVIDED SHEARKEYS IN WALLS FOR BONDING TO FRESH CONCRETE

PROVIDED WOODEN STOPPERS BEFORE SLAB CONCRETE CASTING

APPLY NITO BOND SBR FOR BONDING PURPOSE IN BETWEEN FRESH AND EXISTING CONCRERE BEFORE CONCRETE POURING

MENTIONED PROPER NUMBERING ON MIVAN PANELS

PLACEING OF STEEL IN SAFE MANNER ON CONCRETE SLEEPERS

Slump at RMC Plant Slump at Site Checked the slump of Every RMC Vehicle in plant and Site.

Before setting out of concrete surface make BROOMING finishing being ensured to avoid cracks.

BAD PRACTICES

AFTER WORK COMPLETION BLOCK ENGINEERINGS ARE NOT KEPT COVER BLOCKS IN SAFE MANNER COLLECTED THE COVER BLOCKS AND HANDOVER IN STORE

COLLECTED THE STUB PIN AND HANDOVER IN STORE

AFTER CURING POND CONSTRUCTED STEEL RODS PLACED ON AND BROKEN IT, SO THAT CURING NOT PROPERLY HAPPEN

FOR VERTICAL REINFORCEMENT BARS MASTER RING NOT PROVIDE AT 1M LEVEL FROM SLAB

MINOR CRACKS ARE DEVELOPED IN PLASTERING DUE TO CURING NOT DONE PROPERLY AFTER PLASTERING DONE

3.PMC/CLIENT MAJOR REPEATED COMMENTS

Wall and slab junction area binding wire not Properly tying. Cover blocks not properly provided. Spacing not maintain properly in reinforcement. Cleaning not done properly. Vertical lapping length of bars not maintain properly. Master rings not provided.

4. QUALITY ISSUES AND NCR

THANK YOU