reliance mart at Jamnagar, India

guest8c9e72 7,944 views 46 slides May 04, 2008
Slide 1
Slide 1 of 46
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46

About This Presentation

Making of Reliance Mart at Jamnagar


Slide Content

Features & Photographs showing
Construction of
RELIANCE MART - JAMNAGAR
PREPARED BY
Niraj B Anadkat
General Manager – Projects
Reliance Engineering Associates (P) Ltd.

FEATURES OF HYPERMARKET
• Land - 14 Acres
• Built Up area for Phase 1 Building - 94,000 Sq Ft
• Built Up area for Phase 2 Building - 66,000 Sq Ft
• Total Built Up Area - 160,000 Sq Ft
• External Landscaping area – 450,000 Sq Ft
• Hard Landscaping - 210,000 Sq Ft
• Soft Landscaping - 240,000 Sq Ft

Access to Hypermarket
 Total No of Entrance Gates - 9 Nos

General Entry to Common People – 4 Nos
 Special Entrance for Township Residents – 3 Nos
 Utility Gates – 2 Nos

Parking Facility -
 Car - 450 Nos
 Motor Cycle - 70 Nos
 Bicycle - 13 Nos
 Bus - 6 Nos

Shopping Trolleys - 2000 Nos
 Trolley Parks – 10 Nos
 Seating arrangements – 75 Benches
to accommodate 300 persons

Construction Features
• Construction Started on - Oct’ 2006
• Completion of Project - Nov’ 2007
• Cement Consumed - 3500 MT
• Reinforcement Steel Consumed – 500 MT
• Structural Steel Consumed - 1600 MT
• Electrical Cable used 70 Kms
• Cable Tray fixed 8 Kms
• No of Lighting Fixtures 2200 Nos
• Illumination Level in Mall -
 Maximum Level - 800 Lux
 Average Level - 500 Lux

HOW WE BUILD THIS ?
CONSTRUCTION PICTURES

Land opposite Refinery Main Gate identified

BHOOMI - POOJAN

This way it was started in Oct 2006

Pre Engineered Building was Imported from Dubai and Installed at Site

Construction Progress Review by Chairman and other Directors

ACCIDENT WE FACED DURING CONSTRUCTION
( Fortunately No Injury )

TAKING SHAPE

AS BUILD….
PHOTOGRAPHS FOLLOWS…

VIEW FROM CAR ENTRANCE

PARKING AREA

SIDE VIEW OF BUILDING

VIEW FROM PEDESTRIAN ENTRANCE SIDE

BIRD’S EYE

FRONT VIEW FROM HELICOPTER

TROLLEY PARK

CANOPY 10m X 10m

Utilities at Hypermarket
• Power - Rated Capacity 3.2 MVA
• Power Load at Present 1.5 MVA
• HVAC System -
• Chillers Installed 3 Nos of 150 TR capacity each
• Total AHU installed – 7 nos of 15000 CFM each
• Water Treatment Plant - 20 m3 / hr
• Fire Water Operating Pressure 7 kg / cm2
• Water Storage Capacity 500 KL
• Pneumatic System installed
to keep water supply lines at 4 Kg/cm2 pressure at anytime.

Security & Loss Prevention System Introduced
• Every Entry & Exit are sealed & attended by Guards
• Frisking of staff – 100 %
• Material Monitoring - Receipts and dispatches are controlled
• General patrolling on periphery.
• Traffic Management
• Vigilance in Civil Dress
( A ) Physical Security :

• Access Control –
•Doors are with Magnetic Locks
• Restricted Entry
• Video Monitoring by 91 Cameras including PTZ Cameras
• Intruder Alarm System –
•Panic Buttons at Vital Locations
• PIR ( Passive Infra Red ) on all Entry & Exit
• Fire Alarms –
• Smoke Detectors – 351 nos
• Fire Hydrants – 14 nos
• Fire Extinguishers – 34 nos
• Manual Call Points – 12 nos
• Public Announcement System

( B ) Security Automation :

• Anti Shop Lifting Devices –
• Keeper Boxes with Sensor
• Spider Wraps with Sensor
• Apparel Tags ( Hard Tags )
• Soft Tags ( For shoes, leather items etc )
• IR (Infra Red) Alarm Pods for Mobile and other electronic goods
•EAS ( Electronic Article Surveillance ) Antenna.
( C ) Shrink Management :
( D ) Fraud Management :
• Monitoring POS transactions
• Internal Theft prevention
• Prevention of Sweet Shopping

President and Other Higher Officials on Inauguration Day

MAN AT SITE
Now Concentrating on next Project –
Family Entertainment Center at Jamnagar

Let’s not limit our challenges
Instead,
Let’s challenge our Limits !!