SER Infra Presentation Slide deck 26.09.2024.pdf

inderpalsdev 6 views 31 slides Sep 27, 2024
Slide 1
Slide 1 of 31
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31

About This Presentation

hydro capability project report


Slide Content

01
COMPANY PROFILE
SER Infrastructure Private Limited

02
About Company
SER Infrastructure established in 2021, offers
innovative, cutting edge technologies, products and
services via a sustainable and replicable model through
the expertise of experienced and seasoned technocrats
in the field of Renewables to markets and clients

Our tailormade solutions help our clients setup
projects with a fixed timeline and generate profits for
the stakeholders.

Our core competence lies in the field of hydro pumped
storage projects that could find application as battery
storage solution for RE projects.

SER Infra

03
Vision
To be the best Renewable Energy
Service Provider in Asia
Promote use of RE products & Services
to reduce environment impact on
nature
02
Be a leader in promotion of low
carbon technologies
SER Infra

04
To provide reliable &
sustainable RE products /
services in compliance with the
laws of nature.
Be a leading service provider for
Battery Storage solutions based
on technologies available in
Asia.
To provide best growth
environment to our employees, be
a great place to work.
To foster the growth and
sustenance of dedicated supply
chain for the sector.
SER Infra
Mission

05
Eknath Rathod
With 36 years
experience in
Hydro in Survey &
Investigation, Cost
Estimate,Electrom
echanical
equipment
design, Bid &
contract
management,
erection activities
of Surya HEP,
Ghatghar PSS and
Koyna Left Bank
HEP.

Meet Our Core Team
Inderpal Singh Dev
Over 30 years
experience in
Larsen & Toubro,
Alstom , GE in
Leadership roles
in Power,
Renewables
Sector and
expertise in
implementing
scenarios ranging
from Business
Transformation
to Acquisition of
Power Assets.
M S Chaudhari
More than 27
years of
experience in
Hydro in
Investigation
Studies, E&M
equipment & 220
kV switchyard,
transmission line
design, Project
Management of
Ghatghar PSS and
Koyna Left Bank
HEP.

With over 37 years of
experience in Energy
sector, , Project
Management,
Contractual/Commer
cial, Leadership and
Team Building skills,
experience of
working with reputed
consultants.
He has worked with
MAHAGENCO,
Reliance Energy,
Essar, DSPPL(FIL
Singapore), Unity
Infra Projects

V B Agashe
SER Infra
Retired from Govt
service as Executive
Engineer in 2017
after 36 years of rich
experience in
execution of
Irrigation Projects.
Also worked in
planning and design
of hydro projects
Prepared PFR/DPR of
Hydro Project in
South African
Country from survey
and investigation to
final presentation
and approval.
Retired from Govt
service as Deputy
Secretary in 2019
after 36 years of rich
experience. For 14
year worked in
execution and design
of Hydro Electric
project and Pumped
Storage scheme.
Having experience of
Mega project of
Konkan Railway and
several irrigation
Projects in
Maharashtra.
Sharad Dabhadkar
E & M Team Civil and Hydro Team
Sudhakar Jadhav
Advisory

05
Meet Our Support Team
SER Infra

Mrs L P Nayak Retired as Superintending Engineer after serving in Govt of
Maharashtra in Electrical wing. Instrumental in planning design and
executions of various hydro projects including Ghatghar PSS ( 250
MW)

Mr S. S.DeshpandeWorked in Koyana Hydro Electric Project 1000 MW for E and M Wing
Erection ,Testing and Commissioning Work As well as in Ghatghar
PSS 250 MW

Mr Rajan TakwaleRich experience in Planning and Design of various civil components
of hydro Electric project.

Mr Avinash Patil Served in Water Resources Department of Govt of Maharashtra in
various capacities for estimation, planning execution of Dams ,
Canal. Completed DPR of Mbongozi HEP , Malawi South Africa after
initial survey, investigation and Project Estimate
Mr Sunil Shalu and
Mr Sanjeev Dalwala

Served in Water Resources department on field as well as in office for
project estimate, survey and basic design of minor dam, canal
structures etc

06
Our Services
•Survey and Site investigation

•Pre Feasibility Report (techno economic viability)

•Preparation of DPR

•Detailed Engineering and Design of Project
Components

•Bid Specification preparation & OE role during
evaluation

•Invitation of bids from reputed vendors in the space

•Contract Agreement preparation

•Review of manufacturing drawings

•Project Monitoring

•Regulatory interfacing with Electricity Regulatory
Commission, CEA

•Test procedure witness

SER Infra

02
SER Infra
Stages of investigation from conception to completion

1.Prefeasibility report preparation and approval
2.Preliminary Feasibility Report preparation and approval
3.Detailed project report preparation and approval
4.Pre construction investigations

After PFR approval, following investigations are taken up
1.Water availability (Hydrological)
2.Electrical load surveys
3.Topographical Surveys
4.Ecological including wild life, forest
5.Geological and Foundation investigations

02
SER Infra
The purpose for preparing a Detailed Project Report is to ensure least
variation between the estimated & actual cost of the project. The
preparation of DPR includes:
1.Detailed Survey and Investigations
2.Planning for complete working of the project
3.Detailed structural and hydraulic designs
4.Electro-mechanical designs, Design of Power House, Switchyard
5.Layout drawings
6.Cost Estimates
7.B C ratio and financial return, Economic justification.
8.Salient features of the project
Before commencement of the construction works, it is necessary to
obtain all clearances & permissions (Environment, wild life/forest,
Electricity Regulatory Authorities) to avoid delay & cost overrun.

Detailed Project Report

02
SER Infra
Post DPR Activities

1.Component wise Bar chart planning of each activity- CPM PERT
2.Preliminary civil works – communications, Building & colonies.
3.Preparation of bidding document for Project Civil works and Main
T/G plant, Switchyard and associated equipment (Package wise)
4.Completion of award and contract formalities
5.Approval of various drawings in time bound manner
(Manufacturing schedule wise)
6.Pump Turbine model testing -witness test
7.Approval of Factory Inspection & test reports of equipment
8.Delivery of main T/G plant equipment at site
9.Construction of Dams & power house, switchyard plot, Erection of
Turbine parts
10.Site testing & pre-commissioning testing of Electrical equipment (
Dry tests)
11.Wet testing i.e. unit wise commissioning activities- Synchronising of
T/G unit with Grid

06
Experience (Partial List)

Koyna Left Bank PSS ( 2x40MW)
-Detailed Project Report preparation
-Electrical design, Layout design
-Formulation of Bidding process, shortlisting of Bidder

Warasgaon PSS (4x300 MW)
-Preparation of PIR

Koyna Stage-VI PSS (2 x 200 MW)
-Preparation of PIR

Ghatghar PSS –st 2 (2 x 125 MW)
-Preparation of PIR

Mutkhel PSS (1 x 110 MW)
-Preparation of PIR

Kodali PSS (2 x 110 MW)
-Preparation of PIR

Humbarli PSS (KHEP-V)
-Preparation of PIR




SER Infra
Ghatghar Pumped Storage 2x125 MW
-Detailed Project Report preparation
-Electrical design, Layout design
-Formulation of Bidding process, selection of Bidder,
Formalizing Contract Agreement
-Implemented Contract for Main Plant T/G plant, 150 T EOT
crane, 245 kV GIS S/yard, 220 kV XLPE cables, 185 MVA Main
Power Transformer

08
Few Key Projects
Financial vetting of 5 MW Solar Plant in Faridabad,
Haryana under PPA agreement
01
220 kv XLPE Cable Systems for 2x125 MW Ghatghar PSS02
245 KV GIS Switchyard for 2x125 MW Ghatghar PSS03
Bhatsa HEP ( 1x 15 MW)


04
Surya HEP ( 1x 6 MW)05
Ghatghar PSS (2 x 125 MW)

06

Koyna left bank HEP (2x40 MW)

07
Koyna St 4 ( 4 x 250 MW)08
SER Infra

07
Facilities
Pune
Deals with Civil
components of the
project.

Facility 01
Kalyan, Thane
Handles
Electromechanical
components of project.
Facility 02
Gurgaon, Haryana
Caters to NCR Region
and engages with
CPSU’s like NTPC and
THDC, SJVNL, BHEL.
Facility 03
Mumbai
Interacts with MERC,
MSETCL and State
Government for
various clearances /
permissions
Facility 04
SER Infra

TYPICAL PUMPED STORAGE SCHEME

15
SITE VIEWS
View of Saddle
Dam
GHATGHAR 2X125 MW P.S.S.

16
SITEVIEWS
U/G Machine
Hall
GHATGHAR 2X125 MW P.S.S.

17
SITEVIEWS
GHATGHAR 2X125 MW P.S.S.
Civil and E&M Team with Japanese Experts

18
SITE VIEWS
GHATGHAR 2X125 MW P.S.S.
Stator Lowering

19
SITE VIEWS
GHATGHAR 2X125 MW P.S.S.
Pressure Shaft

20
SITE VIEWS
GHATGHAR 2X125 MW P.S.S.
Inclined Pressure Shaft

21
SITE VIEWS

22
PRESENTATION TITLE
GHATGHAR 2X125 MW P.S.S.
Lower Dam 80 m with RCC technology

SITE VIEWS
23
SCHEMATICS
POWERHOUSE CROSS SECTON
FIRST LARGE P.S.S. IN
MAHARASHTRA
FIRST RCC DAMS IN INDIA
FIRST STEPPED SPILLWAY

SITE VIEWS
24
UPPER DAM LOWER DAM
UPPER INTAKE
VIEW OF LOWER DAM, LOWER INTAKE,
SWITCHYARD, TAIL SURGE WELL
LOWER INTAKE PROTECTION WORKS
TRANSFORMER HALL
GHATGHAR 2X125 MW P.S.S.

SITE VIEWS
25
HYDROMECHANICAL EQUIPMENT HALL
GHATGHAR 2X125 MW P.S.S.

SITE VIEWS
26
LAKE TAPPING
FIRST IN ASIA
LAKE
(DOUBLE
TAPPING
KOYNA 1920 H.E.P.

SITE VIEWS
27
SPILLWAY
UPPER INTAKE STRUCTURE
APPROACH TUNNEL
SPHERICAL
VALVE
KOYNA 1920 H.E.P.

SITE VIEWS
28
VENTILIATION TUNNEL
SERVICE BAY
MACHINE HALL
STATOR WINDING

SITE VIEWS
29
BUS DUCT TUNNEL
LOWER INTAKE STRUCTURE
TAIL SURGE SITE
OPEN SWITCHYARD

09
Contact
9987172946
[email protected]
402 DEEPJYOTI CO OP HSG SOC BIRLA
COLLEGE, KALYAN, Thane, THANE,
Maharashtra, India, 421301
SER Infra

10
Thank You
SER Infra
Tags