it includes basic info about different types of shoring
Size: 2.57 MB
Language: en
Added: May 17, 2024
Slides: 25 pages
Slide Content
Cosmos College of Management and Technology
Building Construction-II
Arch. III/I
Lecture 2
Temporary Works
(SHORING)
2079
Ar. Kailash Suwal
Ass. Professor
Building Construction II
Prepared By: Ar.Kailash Suwal (Ass. Professor)
•Chapter
1.A Temporary works –Shoring
1.A.2 FLYING SHORE
1.A.3 DEAD SHORE
Class Assignment SessionClass Assignment Session
1. Write down the construction methods of flying shore? And point
out the consideration while erecting a flying shore?
Dead Shoring
or vertical
Folding Wedge
Class Assignment SessionClass Assignment Session
1.Writedowntheconstructionmethodsofdeadshore?Andpoint
outtheconsiderationwhileerectingadeadshore?
2.Whichtypesofshoringdoyourecommendfordamagein
groundfloorexteriorwallrenovation?Whatarecomponentsof
thatshoring?
Ar. Kailash Suwal (Ass. Professor)
•Syllabus
•Coarse description and objectives
•Chapter
1.A Temporary works –Shore
1.A.2 Flying or horizontal Shore
1.A.3 Dead or vertical Shore
Home Assignment SessionHome Assignment Session
1. Sketch the following in sketchpad (min. Size A4) and submit in
next class.
1.A.2. Flying or horizontal Shore (standard and locally exist) –Even
roll no.
1.A.3 Dead Shore or Vertical (standard and locally exist) –Odd roll
no.
Free Medium (Color Pencil, pen, pencil. Ink pen, Water color)
Questions BankQuestions Bank
1.Expalinthetpesofshoring.
2.DescribetheobjectivesofShoring
Prepared By: Ar.: Kailash Suwal (Ass. Professor)
1.B. Under pinning