SIX SIGMA IMPROVES OEE performance from 20% to 39.1%

Julesk19 46 views 16 slides May 09, 2024
Slide 1
Slide 1 of 16
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16

About This Presentation

Six Sigma improves OEE


Slide Content

Six Sigma improvesOEE
December172021
Prepared by Julian Kalac, P.Eng
Lean Six Sigma Master Black Belt

PROBLEM 2021 OEEbelow 20%
0%
10%
20%
30%
40%
50%
60%
70%
Jan Feb Mar April May June July Aug Sept Oct Nov Dec
2021 OEE
Industry standard=85%

WHAT DO YOU WHEN YOU DON’T KNOW WHAT TO DO?
1-Go back to the formula
verify the formula is
correct
2-Analyze the data, what
does the data say?
3-Test, and Verify the Data

OEE=
Availability
Run \Time
Total time
Production Qty /
QPRx Run time
Performance
Quality
Good Qty
Total Qty
STEP 1 VERIFY THE FORMULA

Input
Output
OUTPUT
CAM PACKAGING MACHINE INPUT OUTPUTWHERE IS
THE BOTTLENECK?

The CAM packaging line
●Based on current bottleneck (case packer cycle time of 3.33 min
/case the QPR= 72 cartons /min ,or QPR= 4320/hr)
Cartoner
120/min
72 cartons/min
Process Flow
Case
Packer
72 cartons/min = Target Throughput

STEP 2--ANALYZE THE DATA

ANOVA statistical comparison between shifts
P=0.00
means shift 3 is significantly
different from other shifts
P=0.00
significant

Shift 3 Max = 75
cartons/min
SHIFT 3 Avg= 75
Cartons/min
Shift3>Target (72)

Shift 2 Max = 62
cartons/min
SHIFT 2 Avg= 62
Cartons/min
Shift 2 <Target (72)

Shift 1 Max = 52
cartons/min
SHIFT 1 Avg= 52
Cartons/min
Shift 1 <<Target (72)

Step 3—Verify Data

2021 OEECAM line @ 71 cartons /min
Avg= 25.2%
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
Jan Feb Mar April May June July Aug Sept Oct Nov Dec
39.0%
24.1%
31.1%
21.2%
22.3%
24.1%
39.3%
21.2%
24.7%
31.6%
38.0%
39.1%
CAM OEE 2021 at 71 cartons /min
OEE
New OEE = 39.1%

World Class OEE –85% OEE