AECOM Perunding Sdn Bhd Mackintosh Probe Test Syed Burhanuddin Syed Ab Rahim STN14 Maran Station 12 July 2024
AGENDA 1.0 INTRODUTION OF MP TEST 2.4 REMOVAL AND LIFTING SURPLUS SPUN PILE 3.0 PILE PLUG 2.0 PILE CUTTING PROCEDURE 2.1 EXCAVATION PILE CAP TO CUT OFF LEVEL 2.2 SURVEY WORK TO CUT OFF LEVEL 2.3 CUTTING PILE USING DIAMOND CUTTER 2.5 LEAN CONCRETE WORK 3.1 FABRICATION OF PILE PLUG 4.0 REFERRENCES 3.2 INSTALLATION OF PILE PLUG
1.0 INTRODUCTION Pile cutting or Cut off Pile refers to the process of trimming or levelling the upper part of foundation piles, either to a predetermined elevation or to remove damaged portions. This procedure is crucial in ensuring that the pile head is prepared to receive structural connections or to fit into other parts of the foundation system, such as pile caps or beams
2.0 PILE CUTTING PROCEDURE 2.1 Excavation Pile Cap to Cut off Level Formation Before excavation , the pile cap area shall be marked on the ground after conducting a survey work (Control points and As-built drawing) The excavation work carry out by using a machineries such as excavator and backhoe, the manual excavation is also require to remove the earth/soil in between the pile group. After excavation , the pit levels & pile cut off level shall be verified for correctness to the drawings and recorded.
Photo 1: Excavation work by machineries Photo 2: Manual excavation 2.1 Excavation Pile Cap to Cut off Level Formation
Photo 3: Levelling, compaction & marking for Cut off Pile Photo 4:Typical section of pile cap 2.2 Survey Work to Cut off Level
Photo 6: surplus spun pile after cut off pile Photo 7 : Surplus spun pile remove from excavation pit by crane. 2.4 Removal Of Surplus Spun Pile
Photo 8: Installation 50mm lean concrete side formwork Photo 9 : Casting lean concrete (Concrete G15) 2.5 Lean Concrete Work
Photo 10: Detail drawing for pile plug reinforcement Photo 11: Fabrication & inspection of Pile Plug 3.0 Pile Plug 3.1 Fabrication of Pile Plug
Photo 12: Installation & casting of pile plug. (Concrete G30) 3.2 Installation of Pile Plug
4.0 REFERENCES Method Statement ECRL-S12-CS5A-MS-0001 / CONSTRUCTION OF PILECAP FOR STN 13 (Rev04) Technical Specifications CD-ECRL-AR-GEN-SPC-0006 Part II TECHNICAL SPECIFICATION SECTION 6: STATION AND BUILDING WORKS PART II STRUCTURE (Rev3) Station Standard Drawings CD/ECRL/C/ML/SE/RFD/STR003/00000_Rev02 (11KV Distribution Station) CD/ECRL/C/STN13/SE/SEC3.6/STR001_Rev02 (STATION STRUCTURAL STN13 PAYA BESAR) Photo STN13 Paya Besar Station progress photo by IOW & supervisor.