STsdrewereds-03-Lifting-and-Slinging.pptx

RedaElawady1 30 views 60 slides Jun 03, 2024
Slide 1
Slide 1 of 60
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33
Slide 34
34
Slide 35
35
Slide 36
36
Slide 37
37
Slide 38
38
Slide 39
39
Slide 40
40
Slide 41
41
Slide 42
42
Slide 43
43
Slide 44
44
Slide 45
45
Slide 46
46
Slide 47
47
Slide 48
48
Slide 49
49
Slide 50
50
Slide 51
51
Slide 52
52
Slide 53
53
Slide 54
54
Slide 55
55
Slide 56
56
Slide 57
57
Slide 58
58
Slide 59
59
Slide 60
60

About This Presentation

Lifting-and-Slinging.pptx


Slide Content

Lifting & Slinging Safety #ST-3

BANKSMAN / SLINGER

General Safety BANKSMAN / SLINGER

ALWAYS THINK WHAT IF ? General Safety THE SLING BREAKS? THE LOAD SLIPS? THE LOAD SWINGS TOWARDS ME? ADD ANY OTHER WHAT IF’S OF YOUR OWN FOR ALL THESE YOU SHOULD HAVE A PLAN TO ENSURE YOUR OWN AND OTHERS SAFETY

General Safety ALWAYS HAVE AN ESCAPE ROUTE DO NOT GET TRAPPED IN SPACES YOU CANNOT GET AWAY FROM QUICKLY

General Safety NEVER TAKE LOADS OVER PERSONNEL MOVE THE PERSONNEL OR TAKE THE LOAD ROUND THEM THE SAME APPLIES TO YOURSELF NEVER GO UNDER SUSPENDED LOADS

General Safety BE AWARE OF PINCH POINTS

General Safety NEVER WRAP TAGLINE ROUND YOUR HANDS OR BODY IF ANYTHING HAPPENS YOU MAY NOT BE ABLE TO GET FREE QUICKLY ENOUGH AND COULD BE BADLY INJURED OR WORSE TAGLINES SHOULD BE HELD NORMALLY

General Safety BE AWARE OF FIXED OBSTACLE SUCH AS STAIRS, VENTS OR THE DERRICK STRUCTURE ITSELF

SUMMARY Ask yourself “WHAT IF ?” Have an escape route Never walk under loads or allow loads to be lifted over other personnel Watch out for fixed obstacles IF IN DOUBT ASK! General Safety

All items must have: Safe Working Load Unique Identification Number Current Color Code PRE-USE INSPECTIONS

SAFETY HOOK PRE-USE INSPECTIONS

PIPE HOOK PRE-USE INSPECTIONS

SUMMARY Wire Rope Slings Check for crushing Check Ferrule for cracks Check for kinks Check for broken wires Check for other signs of damage PRE-USE INSPECTIONS

SUMMARY Webbing Slings Check for fraying Check for splits Check for contamination Check stitching Check for other signs of damage PRE-USE INSPECTIONS

SUMMARY Shackles Check for wear Check not stretched or bent Check for cracks (Sound Check) Check proper pin correctly fitted Check for other signs of damage PRE-USE INSPECTIONS

SUMMARY Hooks Check for wear Check not stretched or bent Check for cracks Check latch mechanism closes fully Check for other signs of damage PRE-USE INSPECTIONS

BANKSMAN / SLINGER Slinging Application

Load on sling = 1000Kg Load on sling = 500Kg 1000KG Load on sling = 500Kg Slinging Application SPREADER BAR IS USED AND SLINGS ARE HUNG OFF THIS AS SLINGS DO NOT MEET THERE IS NO ANGLE BETWEEN THEM SLINGS ATTACHED TO LOAD SHARE LOAD EQUALLY AND EACH BEARS 500KG SPREADER BAR IS HUNG OFF ANOTHER SLING WHICH BEARS FULL WEIGHT OF LOAD OR 1000KG ( NOTE WE ARE NOT COUNTING WEIGHT OF SPREADER BAR)

1000KG 90 O Load on sling = 700Kg Load on sling = 700Kg Slinging Application THIS TIME BOTH SLINGS ARE ATTACHED TO THE CRANE AND ANGLE BETWEEN THEM IS 90 DEGREES AS YOU CAN SEE LOAD ON EACH SLING HAS INCREASED SUCH THAT EACH SLING NOW BEARS 700KG

Load 1000Kg Load 1000Kg 1000KG 120 O Slinging Application THIS TIME ANGLE BETWEEN THEM HAS INCREASED TO 120 DEGREES LOAD ON EACH SLING HAS INCREASED SO THAT EACH NOW BEARS 1000KG OR FULL WEIGHT OF LOAD AS WE HAVE JUST SEEN IF ANGLE BETWEEN INCREASES THEN LOAD IMPOSED ON SLINGS INCREASE

1000KG 90 O SWL 1000Kg SWL 1000Kg Slinging Application RULE FOR SLINGING WHEN USING TWO SLINGS IS: ANGLE BETWEEN SLINGS MUST NEVER exceed 90 DEGREES EACH SLING MUST BE RATED FOR FULL WEIGHT OF LOAD.

SWL of Assembly 1000Kg 1000KG 90 O 90 O Slinging Application SAME RULE STANDS FOR FOUR LEGGED SLINGS IN THAT THE ANGLE BETWEEN SLINGS MUST NOT EXCEED 90 DEGREES. IN THIS CASE HOWEVER THE BRIDLE ASSEMBLY WILL HAVE TO BE RATED FOR THE FULL WEIGHT OF THE LOAD. THIS WILL NORMALLY BE MARKED ON THE RING AT THE TOP

If you choke then half the SWL Double wrap to get 360 degree contact Slinging Application IMPORTANT RULE WHEN USING SLINGS IS: IF YOU CHOKE A SLING YOU MUST HALF ITS’ SWL WHEN SLINGING TUBULARS YOU MUST ENSURE THEY ARE DOUBLE WRAPPED. THIS IS TO GET 360 DEGREE CONTACT.

Slinging Application NEVER HIT OR FORCE EYE OF SLING DOWNWARDS WHEN SLINGING TUBULARS. SLINGS WILL FIND THEIR OWN BITE YOU WILL NOT INCREASE THE GRIP BY FORCING EYE DOWN ALL YOU WILL SUCCEED IN DOING IS INCREASING ANGLE WHICH AS WE KNOW INCREASES LOAD IMPOSED ON SLING

Slinging Application WHEN SLINGING TUBULARS MAKE SURE SLINGS ARE CHOKED IN THE SAME DIRECTION. IF YOU DO NOT, THEN LOAD WILL TWIST.

Slinging Application SLINGS SHOULD BE EQUAL DISTANCE FROM EACH END ENSURE ANGLE DOES NOT EXCEED 90 DEGREES HOWEVER

Slinging Application THIS IS WHAT HAPPENS IF SLINGS ARE NOT EQUAL DISTANCES FROM EACH END.

Slinging Application ALWAYS USE TAGLINES

Slinging Application ENSURE LOAD IS CLEAR TO LIFT PRIOR TO SIGNALLING CRANE OPERATOR. LOOK OUT FOR DECK BEAMS OR OTHER OBSTRUCTIONS

Slinging Application NEVER MIX DIFFERENT SIZE TUBULARS IN SAME BUNDLE AS SMALLER SIZE MAY SLIP OUT

PIN END PROTECTOR BOX END PROTECTOR Slinging Application PROTECTORS SHOULD ALWAYS BE IN PLACE ON TUBULARS

BASKET HITCH Slinging Application BASKET HITCH CAN BE USED TO LIFT FRAGILE BOXES AS SLINGS WILL NOT CRUSH THE LOAD WHEN USING BASKET HITCH TAKE GREAT CARE LOAD DOES NOT SLIP

Slinging Application MAKE SURE THERE ARE NO LOOSE ITEMS ON THE LOAD PRIOR TO MAKING ANY LIFT LOOK ALL ROUND LOAD CAREFULLY

Slinging Application POSITION TIP OF BOOM DIRECTLY OVER LOAD THIS WILL ENSURE LOAD PICKS UP CLEANLY WITHOUT SWINGING.

Slinging Application IF TIP OF BOOM IS NOT DIRECTLY OVER LOAD THEN IT MAY SWING AND HIT PEOPLE OR PLANT CAUSING INJURY OR DAMAGE.

Slinging Application MAKE SURE SLINGS AND SHACKLES ARE NOT TWISTED IF YOU LIFT A LOAD WITH TWISTED SLINGS YOU ARE LIKELY TO CAUSE DAMAGE OR EVEN CAUSE THE EQUIPMENT TO FAIL DURING THE LIFT

Slinging Application ENSURE LOAD IS LEVEL BEFORE MAKING LIFT THIS MAY MEAN SECURING LOOSE EQUIPMENT IN HALF HEIGHTS AND CONTAINERS SO IT WILL NOT MOVE DURING THE LIFT. ALL LOADS SHOULD BE LIFTED 2” - 3” ABOVE THE DECK AND CHECKED TO SEE THEY ARE LEVEL BEFORE CONTINUING WITH THE LIFT

Slinging Application ALWAYS CHECK INSPECTION PLATE ON CONTAINERS AND HALF HEIGHTS TO ENSURE TEST DATE STAMP IS CURRENT.

Slinging Application CONTAINER DOORS MUST BE FIRMLY SECURED BEFORE MAKING LIFT. Collect staff tidy inside the container

Slinging Application HALF HEIGHTS MUST NOT HAVE ITEMS OVERHANGING THE EDGES THESE MAY HAVE TO BE SLUNG INDIVIDUALLY

Door to be closed Ensure the bottles will not fall over. Slinging Application GAS BOTTLES MUST ALWAYS BE MOVED IN A CERTIFIED BOTTLE CARRIER. DO NOT MIX DIFFERENT TYPES OF GAS BOTTLES (Chemical reaction may happen) NEVER MOVE A GAS BOTTLE USING SLINGS. VALVES SHOULD BE TURNED OFF AND VALVE PROTECTOR CAPS SHOULD BE FITTED

LIFTING POINT SLING AND SHACKLE Slinging Application CERTAIN ITEMS OF PLANT MAY HAVE DEDICATED LIFTING POINTS FOR USE WITH EYE BOLTS. ALWAYS USE DEDICATED LIFTING POINTS IF FITTED AS THEY ARE POSITIONED TO ENSURE STRAIGHT LIFT BEARINGS AND SHAFTS SHOULD BE PROTECTED FROM DAMAGE USING WOOD OR RAGS. Mandatory

CENTRE OF GRAVITY Slinging Application IF THERE IS NO DEDICATED LIFTING POINT THEN YOU WILL HAVE TO CONSIDER WHERE THE CENTRE OF GRAVITY OF THE LOAD IS BEFORE YOU POSITIONS THE SLINGS REMEMBER THIS MAY NOT BE IN THE MIDDLE OF THE LOAD

BARREL HOOKS BARREL CARRIER Slinging Application WHERE EVER POSSIBLE BARRELS SHOULD ONLY BE LIFTED USING DEDICATED BARREL LIFTING EQUIPMENT

Slinging Application WHEN USING PIPE HOOKS MAKE SURE YOUR FINGERS WILL NOT BE CAUGHT WHEN LOAD IS LIFTED

Slinging Application NEVER ATTACH TAGLINE TO SLING OR HOOK WHEN USING PIPE HOOKS AS YOU COULD PULL HOOK OUT CAUSING LOAD TO FALL. TAGLINE SHOULD BE ATTACHED DIRECTLY TO THE LOAD

SUMMARY Never exceed 90 degree angle Choked sling = half SWL Double wrap tubulars and choke in the same direction Aways fit protectors to tubulars Take extra care with pipe hooks Slinging Application

SUMMARY Check containers & half heights for current test date stamp Close container doors properly Never allow items to overhang half heights Sling loads round the centre of gravity ALWAYS USE A TAGLINE Slinging Application

Banksman BANKSMAN / SLINGER

Banksman Hook Up

Banksman Hook Down

Banksman Boom Up

Banksman Boom Down

Banksman Move to the right (right of the banksman)

Banksman Move to the Left (Left of the banksman)

Banksman Halt

Banksman Emergency Stop

Banksman Easy Easy

SUMMARY Can the Crane Op see your signals Use a radio if needed Speak slowly & clearly Establish & confirm radio contact with the Crane Op Be aware of background noise Regularly check the battery Banksman