In transport engineering, subgrade is the native material underneath a constructed road, pavement or railway track. It is also called formation level.
The term can also refer to imported material that has been used to build an embankment.
Size: 195.98 KB
Language: en
Added: Dec 05, 2013
Slides: 8 pages
Slide Content
EPA Infrastructure Pvt. Ltd.EPA Infrastructure Pvt. Ltd.
Sub-Grade Preperation
B-267, North Ex Mall
Sector-9, Rohini,
Delhi-110085
What is Sub-Grade?
In transport engineering, subgrade is the native material underneath a
constructed road, pavement or railway track. It is also called formation level.
The term can also refer to imported material that has been used to build an
embankment.
Preperation of Sub-grade
Subgrades are commonly compacted before the construction of a road, pavement or
railway track, and are sometimes stabilized by the addition of asphalt, lime, portland
cement or other modifiers. The subgrade is the foundation of the pavement structure,
on which the subbase is laid.
Preparation of the subgrade for construction usually involves digging, in order to
remove surface vegetation, topsoil and other unwanted material, and to create space
for the upper layer of the pavement. This process is known as "subgrade formation"
or "reduction to level".
Subgrade shall be free from all foreign
debries and rock outcrops
Geotextile being laid on the uncompacted
layer of soil
Compacting the soil surface after
geotextile layer