tariff regulations of thermal power sector as per revised guidelines of cerc
Size: 465.41 KB
Language: en
Added: Sep 25, 2024
Slides: 4 pages
Slide Content
SL Particulars Tariff 2024-29 Tariff 2019-24
Comparison with Tariff Regulations
2019
1Useful Life & operation life
Useful Life 25 Years 25 Years No Change
Operational life 35 Years Provided in Tariff 2024-29
2DC, SG incentive
Normative Annual Plant Availability Factor
(NAPAF)/ Normative DC
83% for stations completing 30 years from COD as
on 31.03.2024
Rest all Stations : 85%
85%
83% for stations completing 30 years
from COD as on 31.03.2024
NAPLF for incentive
83% for stations completing 30 years from COD as
on 31.03.2024
Rest all Stations : 85%
85%
83% for stations completing 30 years
from COD as on 31.03.2024
Recovery of Capacity charge
The capacity charge shall be recovered in two
parts, viz., Capacity Charge for Peak Hours of the
month and Capacity Charge for Off- Peak Hours of
the month
The capacity charge recovered under two segments
of the year, i.e. High Demand Season (period of
three months) and Low Demand Season (period of
remaining nine months), and within each season in
two parts viz., Capacity Charge for Peak Hours of
the month and Capacity Charge for Off Peak Hours
of the month
High Demand and low Demand seasons
excluded
SG incentive
75 Paisa/ KWH in Peak Hrs , 55 Paisa/ Kwh in Off-
peak Hrs
65 Paisa/ KWH in Peak Hrs , 50 Paisa/ Kwh in Off-
peak Hrs
Peak hrs incentive increased by 10
paisa
Off-Peak hrs incentive increased by 5
paisa
3Heat Rate
200 / 210 / 250 MW (COD before 01-04-
2009)
2415 kcal/kwh 2430 kcal/kwh Reduced by 15 kcal/kwh
500 MW-sub-critical, (COD before 01-04-
2009)
2375 kcal/kwh 2390 kcal/kwh Reduced by 15 kcal/kwh
200 / 210 / 250 MW Stations achieve COD on
or after 01.04.2009
1.05 X Design Heat Rate (kCal/kWh 1.05 X Design Heat Rate (kCal/kWh No Change
500 MW & Above capacity units Stations
achieve COD on or after 01.04.2009
1.045 X Design Heat Rate (kCal/kWh) 1.05 X Design Heat Rate (kCal/kWh
Reduced by 0.005 X Design Heat Rate
(kCal/kWh)
GTCHR for dry cooling System
Maximum GTCHR minimum of the actual design
GTCHR or 6% higher than the values given in the
CERC table
Provided in Tariff 2024-29
Tanda-I 2750 Kcal/ Kwh 2750 Kcal/ Kwh No Change
Kanti-II 2500 Kcal/Kwh 2364 Kcal/ Kwh Increased by 136 Kcal/ Kwh
4Boiler Efficiency
Changes in Tariff Regulations 2024-29 as compared to Tariff Regulations 2019-24 for Coal Stations
SL Particulars Tariff 2024-29 Tariff 2019-24
Comparison with Tariff Regulations
2019
Minimum Boiler Efficiency
86 % for Sub Critical & Super critical
86.5 % for Ultra Super Critical
86 % for Sub Critical & Super critical
86.5 % for Ultra Super Critical
No Change
5Secondary Fuel Oil Consumption(SFOC)
For Corner fired Boiler 0.50 ml/kWh 0.50 ml/kWh No change
For wall fired boilers (Kudgi, Lara, Solapur,
Farakka-II, Ramagundam-I, Barh-I, Kahalgaon-
I, Meja)
1.00 ml/kWh 0.50 ml/kWh Increased by 0.5 ml/ Kwh
6APC:
200/210/250 MW 8.50% 8.50% No change
500 MW & above - With TDBFP 5.25% 5.75% Decrease by 0.50%
- With MDBFP 8% 8% No change
Tanda 12% 11.50% Increased by 0.5%
7Additional APC:
Tube type coal mill (Talcher-I, VSTPS-2 &
Unchahar-2, Barauni-2)
0.80% 0.80% No change
IDCT 0.50% 0.50% No change
Air Cooled Condenser – Direct / Indirect
cooling
1%/ 0.5% 1%/ 0.5% No change
8Transit and Handling Losses
Pit head 0.20% 0.20% No change
Non-Pit head 0.80% 0.80% No change
Non-pit head multi modal transportation
(using two or more than two modes of
transport involving multiple
trans shipments)
1% Provided in Tariff 2024-29
9Special allowance Rs 10.75 lakh per MW per year Rs 9.5 lakh per MW per year Increase by 1.25 Lakh per MW
10O&M Expenses Annual escalation of 5.25 % Annual escalation of 3.5 % Increase by 1.75%
For 2024-25 For 2023-24
200/210/ 250 MW 40.92 37.84
500 MW & above 27.17 25.84
600 MW & above 25.78 23.26
800 MW & above 23.20 20.93
11Return on equity (ROE) 15.50% 15.50% No change
SL Particulars Tariff 2024-29 Tariff 2019-24
Comparison with Tariff Regulations
2019
Reduction in ROE
1% For Commercial operation without
commissioning of any of FGMO, data telemetry,
communication system up to load dispatch
Centreor protection system based on the report
submitted by the respective RLDC.
0.25% for not achieving ramp rate of 1% per min.
1% For Commercial operation without
commissioning of any of RGMO or FGMO, data
telemetry, communication system up to load
dispatch Centre or protection system based on the
report submittedby the respective RLDC.
0.25% for not achieving ramp rate of 1% per min.
FGMO instead of “RGMO or FGMO”
Additional ROE @ 0.25%
0.125% for every incremental ramp rate of 0.5%
per min achieved subject to ceiling of 1%.
0.25% for every incremental ramp rate of 1% per
min achieved subject to ceiling of 1%.
Additional ROE for every 0.5% per min
extra ramp rate insatead of 1%
12Sharing of gain
Marginal contribution Gain sharing (Heat rate,
Sp. Oil Cons, APC)
50:50 50:50 No Change
Sharing of saving in interest due to re-
financing or restructuring of loan
50:50 50:50 No Change
Sharing of Non-Tariff Income (land or
buildings, eco-tourism, sale of scrap, and
advertisements)
50:50 50:50 No Change
Gain on Replacing thermal energy by lower
cost RE energy
As per LPS or 50:50 Provided in Tariff 2024-29
Sharing of Gain through market DAM As per LPS or 50:50 As per LPS As per LPS or 50:50
13Rebate & late payment surcharge for
Rebate on payment within a period of 5
days
1.50% 1.50% No Change
Rebate on payment after 5 days and within a
period of 30 days
1% 1% No Change
Rebate on payment after 30 days and within a
period of 45 days
- - No Change
Late payment surcharge As per LPS rules 2022 1.50% As per LPS rules 2022
14 Monthly Incentive on PFR Response
Up to 1% of AFC (only if monthly avg PFR
performance is more than 30%)
- Provided in Tariff 2024-29
15Working Capital
Pit head Cost of coal for 10 days Cost of coal for 10 days No Change
Non pit head Cost of coal for 20 days Cost of coal for 20 days No Change
16Gross Calorific Value (GCV)
Margin in GCV for storage loss 85 Kcal/Kg 85 Kcal/Kg No Change
GCV considered if sampling done by 3rd party “GCV as Received” “GCV as Received” No Change
SL Particulars Tariff 2024-29 Tariff 2019-24
Comparison with Tariff Regulations
2019
GCV considered in absence of 3rd party
sampling
“GCV as billed” Added in Tariff 2024-29
GCV consideration in Import coal “GCV as billed” Added in Tariff 2024-29
17
Expenses allowed separately above
Normative O&M expenses
Min value of capital spares to be allowed
separately over Normative O&M expenses
10 Lakh -
Min Add cap expenditure of individual asset
to be allowed separately over Normative
O&M expenses
20 lakh -
Other expenses allowed separately above
Normative O&M expenses
The Water Charges, Security Expenses, Ash
Transportation Expenses and Capital Spares
The Water Charges, Security Expenses and Capital
Spares
Ash Transportation Expenses added
Any additional O&M expenses due to any
change in law
Allowed only if overall impact of such change in
law event in a year is more than 5% of normative
O&M expenses
No condition Min 5% impact condition added
18 Cut-Off date
Last day of the financial year closing after thirty
six months from the date of commercial
operation of the project
Last day of the calendar month after thirty six
months from the date of commercial operation of
the project
Last day of FY instead of calendar
month