TESTING OF
TRANSFORMERS
Tests on Bushing CTs
IR , Continuity and polarity, Ratio and Magnetization test
IR measurements
Ratio test
Vector group test
Floating Neutral point measurement
Magnetization current test
Magnetic balance test ( for 3 phase unit )
C & Tan delta measurement of bushings and windings
TESTING OF TRANSFORMERS
contd…
Winding resistance measurement
Tests on OLTC and Cooler controls
Alarm and trip tests
Core Isolation test
Testing of oil for DGA & other parameters
Oil filling , oil circulation and air venting
Tests on Bushing CTs contd…
Closelywatchtheneedleoranalogscaleofthevoltmeter.It
shouldjumpinthepositivedirection.Thishappensina
fractionofasecond,sothemetermustbemonitoredvery
closely.Ifthevoltmeterkicksinthepositivedirection,the
polaritymarksarecorrect.Ifitkicksinthenegativedirection,
the polarity marks are incorrect.
Primaryandsecondaryleadsaresaidtohavesamepolarity
whenatagiveninstantthecurrententerstheprimaryleadin
questionandleavesthesecondaryleadinquestioninthe
samedirectionasthoughtwoleadsformedacontinuous
circuit.
Tests on Bushing CTs contd…
Magnetization test
Some of the following conditions can cause CT
saturation:
CT secondary burden greater than rated.
Extremely high current flowing through the
CT (fault current).
Current flowing through CT primaries with
open-circuit secondaries.
DC current flowing through either winding.
IR MEASUREMENTS contd…
Evaluation of test results
Inair,IRvalueswillbenearly15-20timesmorethan
intransformeroilatthesametemperature.
Withevery10°Cdropintemperature,IRvalues
increasesbyapproximately1.5timesi.e.anIRvalue
of200M-ohmsatanoiltemp.of40°Cisequivalentto
300M-ohmsat30°C.
FollowingIRvaluesasathumbrulemaybe
consideredastheminimumsatisfactoryvaluesat
30°C(oneminutemeasurements)atthetimeof
commissioning
IR MEASUREMENTS contd…
Rated Voltage class Minumum desired
of Winding IR value at 1 min.
11 KV 300 M-ohms
33 KV 400 M-ohms
66 KV & above 500 M-ohms
IR MEASUREMENTS contd…
Polarisation Index
It is the ratio of the 10 min to 1 min readings.
Polarisation Index Insulation condition
Less than 1 Dangerous
1.0 –1.1 Poor
1.1 –1.25 Questionable
1.25 –2.0 Fair
Above 2.0 Good
RATIO TEST
Purpose
Todeterminetheturnsratiooftransformers.
Turnsratioistheratioofthenumberofturnsina
higherwindingtothatinalowerwinding.
PRECAUTIONS
ThevoltageshouldbeappliedonlyintheHigh
voltagewindinginordertoavoidunsafevoltage.
Ratio test contd…
Testingprocedures
KeepthetappositioninthelowestpositionandIVandLV
terminalsopen.
Apply3phase415VsupplyonHVterminals
Measurevoltagesappliedoneachphase(Phase-Phase)onHV
andIVterminalssimultaneously
Repeatabovestepsforeachofthetappositionseparately
RepeatabovestepsafterinterchangingthevoltmetersofHVand
IVwindingsandthenaveragethereadingsforfinalcalculationof
ratio.
TheabovetestcanalsobeperformedbyTransformerturns
rationmeter(TTR)
Twowindingsononephaseofatransformerareconnectedto
theinstrumentandintheinternalbridgeelementsarevariedto
produceanullindicationonthedetector
Ratio test contd…
Evaluation of results
Theturnsratiotoleranceshouldbewithin0.5%
Outoftoleranceratiomaybesymptomaticofshorted
turnsespeciallyifthereisanassociatedhigh
excitationcurrent.
Ratiomeasurementsmustbemadeonalltapsto
confirmtheproperalignmentandoperationofthetap
changers.
Openturnsintheexcitedwindingwillbeindicated
withverylowexcitingcurrentandnooutputvoltage
VECTOR GROUP TEST
Purpose
To determine the phase relationship and polarity of transformers.
Testing procedures
Connect Neutral point and LV phase with earth.
Join 1R1 of HV and 3R1 of tertiary.
Apply 415 V 3 phase supply to HV terminals
Measure voltage across the following terminals
1R1 –1Y1 3Y1 –1B1 3Y1 -N 2Y1 -N
1Y1 -1 B1 3Y1 –1Y1 1R1 –N 2B1 -N
1B1 –1 R1 3R1 –N 2R1 -N
Vector group test contd…
Evaluation of results
Ensure 2R1 –N = 2Y1 –N = 2B1 –N
Ensure 3R1 –N > 3Y1 –N > 3B1 –N
3Y1 –1B1 >3Y1 –1Y1
The above confirms vector group Y naod 11
MAGNETISING CURRENT
TEST
Purpose
Thistestisperformedtolocatedefectinmagnetic
corestructure,shiftingofwindings,failuresinturnto
turninsulationorproblemsintapchangers.
Precautions
ThistestshouldbedonebeforeDCmeasurementsof
windingresistancetoreducetheeffectofresidual
magnetism.Thetransformermaybedemagnetised
beforecommencementofmagnetisingcurrenttest.
MAGNETISING CURRENT TEST
contd
Testing Procedure
KeepthetappositioninthelowestpositionandIVandLV
terminalsopen.
Apply3phase415VsupplyonHVterminals.
Measurethevoltagesappliedoneachphase(phase–phase)
onHVterminalsandcurrentineachphaseofHVterminal.
Aftercompletionoftheabovesteps,repeatthemeasurements
intappositionNormalaswellasinHighestposition.
KeepthetappositioninnormalandkeepHVandLVterminals
open.
Apply3phase415VsupplyonIVterminals
MeasurephasetophasevoltagebetweentheIVterminalsand
currentoneachoftheIVterminals.
MAGNETISING CURRENT TEST
contd…
Evaluation of test results
Thesetofreadingsforcurrentmeasurementsineach
ofthetappositionshouldbeequal.Unequalcurrents
shallindicatepossibleshortcircuitsinwinding.
Resultsbetweensimilarsingle-phaseunitsshouldnot
varymorethan10%.Thetestvaluesontheoutside
legsshouldbewithin15%ofeachotherandvalues
forthecentrelegshouldnotbemorethaneither
outsidefora3phasetransformer.
Ifanoutoftolerancereadingisexperiencedwhile
turnsratio,windingresistanceandimpedancetests
arenormal,residualmagnetismshouldbe
suspected.
MAGNETIC BALANCE TEST
Purpose
Thistestisconductedtochecktheimbalance
inthemagneticcircuitonlyin3phaseX’mers.
Precautions
Nowindingterminalshouldbegrounded,
otherwiseresultswouldbeerraticand
confusing.
MAGNETIC BALANCE TEST
contd…
Testing Procedures
Keepthetapinnormaltapposition
DisconnecttheX’merneutralfromground
Applysinglephase230Vacrossonephase
ofIVwindingterminalandneutral(sayV1)
thenmeasurevoltageinothertwoIV
terminalsacrossneutral(sayV2&V3).
Repeatthetestforeachofthethreephases.
RepeattheabovetestforHVwindingalso.
MAGNETIC BALANCE TEST
contd…
Evaluation of results
Ensure that V1 = V2 + V3
Zero voltage or very negligile voltage induced
in other two windings should be investigated.
C AND TAN DELTA
MEASUREMENT( BUSHING)
Purpose
Insulationpowerfactorordissipationfactor(Tan
delta)andcapacitancemeasurementofbushing
provideanindicationofthequalityandsoundnessof
theinsulationinthebushing.
Precautions
Measurementmaybemadeatlowvoltagesusually
below10KV.
Connectiontooverheadbusatthebushingneedto
beremovedonlyifthebusaffectthereadings
appreciably.
Porcelainofthebushingsshallbecleananddry.
C AND TAN DELTA MEASUREMENT(
BUSHING)contd…
Testsshallnotbecarriedoutwhenthereiscondensationonthe
porcelainandwhentheRHisinexcessof80%.
Terminalsofthebushingsofeachwindingshallbeshortedtogether
usingbarebraidedcopperjumper.Thesejumpershallnotbeallowedto
sag.Transformerwindingsnottestedshallbegrounded.
Measureandrecordambienttemperatureandrelativehumidityfor
reference.
Ensurethatthetestspecimenisisolatedfromotherequipments.
Connectthegroundterminalofthetestsettoalowimpedanceearth
ground(toearthmatofthesub-station)
TypeTests
Routine Tests
Special Tests
Tan Delta & Capacitor Measurement
TypeTests
Routine Tests
Special Tests
Tan Delta & Capacitor Measurement
Mains & Commutating Mode
Routine Tests
Special Tests
Tan Delta Testing
For Null Condition
N
1
I
1
= N
2
I
2
For Capacitive Current
N
1
ICs = N2 ICx
N
1
VCs = N
2
VCx
Cx = (N1/N2)/Cs
TypeTests
Routine Tests
Special Tests
Tan Delta Measurement of Bushings
TypeTests
Routine Tests
Special Tests
Tan Delta Measurement of Bushings
For C
1
: Apply 10kV between HV and test tap on UST mode.
For C
2
: Apply 500 kV between Test tap and Ground with
HV Guarded on GSTg mode
TypeTests
Routine Tests
Special Tests
UST Mode
Earth will be connected to N Point
Hence only C
HL
will be measured
TypeTests
Routine Tests
Special Tests
GST Mode
Here measurement is made for the
Parallel combination of C
H
and C
HL
TypeTests
Routine Tests
Special Tests
GSTg mode
Here measurement is done for C
H
as L is guarded
C & Tan measurement contd…
Windings
ForICTs(2WindingTransformers),followingcombinationshall
betaken:
HV+IV&LVinUSTmode,bothMainsandreverseandaverage
tobetakentonullifyexternalinterference
HV+IV&Tank(LVtoGndtoGuard)inGSTgmode
LV&Tank(LVtoGndandHVtoGuard)inGSTgmode
-ForReactors,themeasurement shouldbedonein
HV/Tank+GndinGSTmode
-For3windingtransformer,measurementtobemadebetween
eachwindingandGndwithoneremainingwindingguardedand
thesecondremaoningwindinggroundedinGSTgtestmode
C & Tan measurement
contd…
Windings contd.
Thetestisperformedat10KV
Max.valueofTanofclassApaperinsulation,oil
impregnatedat20°Cshouldbe0.007.
RateofchangeofTanandcapacitanceshouldbe
marginal.Tanshouldnotvarymorethan0.001
frompreviousvalue.Capacitancevalueshouldbe
+10%,-5%
Tanmeasurementistemperaturedependentand
correctionfactorshouldbeapplied,if
measurementistakenattemperatureotherthan20
°C.
C & Tan measurement contd…
For ICTs :
Tan delta and Capacitance measurement of windings
should be done in combination of
HV+IV / LV+TANK+E
HV+IV+LV / TANK+E
LV/HV+IV+TANK+E IN GST TEST MODE
For Reactors
HV / TANK+E IN GST TEST MODE
Protection & Alarm checks
Check for correct operation of protection by sorting contacts at MB / relay and
appearance of alarm at control panel in C.R.:
Buchholz relay/ OSR of Main tank / OLTC
WTI/ OTI
PRD
Low oil level in conservator
Tap change incomplete
Cooler fan/ pump fail
DGA & Oil parameters tests
OIL SAMPLE TO BE TAKEN FOR DGA AS PER
FOLLOWING FREQUENCY
BEFORE COMMISSIONING
24 HOURS AFTER 1ST CHARGING
15 DAYS AFTER 1ST CHARGING
ONE MONTH AFTER 1ST CHARGING
3 MONTHS AFTER 1ST CHARGING
THEREAFTER EVERY SIX MONTHS
Oil Parameters before energisation
Prior to energisation of transformer, the oil sample
shall be tested for following properties & acceptance
norms:
1.BDV (kV rms)-60 kV (Min.)
2.Moisture content -15 ppm (Max.)
3.Tan delta at 90 ºC-0.05 (Max.)
4.Resisitivity at 90 ºC-1*10-cm (Min.)
5.Interfacial Tension-0.03 N/m (Min.)