The integrated master plan and integrated master schedule
galleman
8,905 views
108 slides
Apr 26, 2014
Slide 1 of 108
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
About This Presentation
The Integrated Master Plan (IMP) and Integrated Master Schedule( (IMS) provide a strategy for the incremental delivery of program outcomes through increasing maturity assessments with Measures of Effectiveness, Measures of Performance, Technical Performance Measures, and Key Performance Parameters.
...
The Integrated Master Plan (IMP) and Integrated Master Schedule( (IMS) provide a strategy for the incremental delivery of program outcomes through increasing maturity assessments with Measures of Effectiveness, Measures of Performance, Technical Performance Measures, and Key Performance Parameters.
These assessment assure the needed capabilities of the project are met at each assessment point to confirm physical percent complete as planned in the Integrated Master Plan
The*IMP*/*IMS*Structure*
6*
IMS
IMP
Describes how program
capabilities will be
delivered and
how these
capabilities will
be recognized
as ready for
delivery
Supplemental Schedules
Work Packages and Tasks
Criteria
Accomplishment
Events
or
Milestones
1*
6.0*Build*IMP*
The*IMP/IMS*provides*Horizontal*and*
Ver<cal*Traceability*of**
progress%to%plan%
! Ver<cal*traceability*AC*
"*SA*
"*PE*
! Horizontal*traceability*WP*
"*WP*
"*AC*
7*
Program Events
Define the maturity
of a Capability at a point in
time.
Significant Accomplishments
Represent requirements
that enable Capabilities.
Accomplishment Criteria
Exit Criteria for the Work
Packages that fulfill Requirements.
Work*
Package*
Work*
Package*
Work*
Package*
Work*
Package*
Work*
Package*
Work*
Package*
Work*
package*
6.0*Build*IMP*
The*IMP’s*role*during*Execu<on*
8*
Program Execution
PMB for IBR Proposal Submittal DRFP & RFP
Performance Measurement Baseline
Tasks (T)
BOE
% Complete
Statement of Work
Program Deliverables
IMP
Accomplishments (A)
Criteria (C)
EVMS
Events (E)
Budget Spreads by CA & WP CAIV
Capabilities Based Requirements
X BCWS =
Probabilistic Risk Analysis
=
Time keeping and ODC =
Technical Performance Measure
BCWP
ACWP
Cost & Schedule Risk Model
BCWS
Decreasing technical and programmatic risk using Risk Management Methods
IMS
Physical % Complete
Continuity and consistency from DRFP through Program Execution
WBS
6.0*Build*IMP*
1
st
,*Principle*–**
IMP*Building*is*a*Full%Contact%Sport*
9*
6.0*Build*IMP*
Horizontal"and"VerCcal"Traceability"
of"the"IMP/IMS"
Integrated/Master/Schedule/
Work"sequenced"to"
produce"outcomes"
for"each"WP."
! VerCcal"traceability"AC
"
""SA
"""PE"
! Horizontal"traceability"WP
"""WP
""AC"
Program Events
Define the maturity
of a Capability at a point in
time.
Significant Accomplishments
Represent requirements
that enable Capabilities.
Accomplishment Criteria
Exit Criteria for the Work
Packages that fulfill Requirements.
Work"
Package"
Work"
Package"
Work"
Package"
Work"
Package"
Work"
Package"
Work"
package"
Work"
Package"
Work"
Package"
23"
7.0"6"Steps"