TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)

GautamSharma644406 75 views 33 slides Aug 29, 2024
Slide 1
Slide 1 of 33
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23
Slide 24
24
Slide 25
25
Slide 26
26
Slide 27
27
Slide 28
28
Slide 29
29
Slide 30
30
Slide 31
31
Slide 32
32
Slide 33
33

About This Presentation

TOTAL QUALITY MANAGEMENT
(Continuous Quality Improvement)
TOOLS FOR QUALITY CONTROL


Slide Content

TOTAL QUALITY
MANAGEMENT
(Continuous Quality
Improvement)

QUALITY PLANNING
Who is customer?
What do they need?
QUALITY CONTROL
Evaluate, compare, act
QUALITY
IMPROVEMENT
Establish infrastructure
Who is customer?
What Level of Quality do they need?
Are they purchasing to Some Quality Specification?
Any Safety Considerations?
Future Litigation?
Ethical Issues?

QUALITY PLANNING
Who is customer?
What do they need?
QUALITY CONTROL
Evaluate, compare, act
QUALITY
IMPROVEMENT
Establish infrastructure
QUALITY CONTROL
 Inspection
 
      
Destructive
 
      
Non-destructive
 
      
Sampling
 Process Control
 
      
Monitoring Process (relates to inspection)
 
      
Feedback Control
 
      
Statistical Process Control (knowing when the process is
out of control)
 Correction
 
      
Knowing what to correct when process is out of control
 

Cost of Quality Before & After
Improvement
0
10
20
30
40
50
60
70
80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Time
Series
1

Tools for Quality
Control
Check Sheets
Pareto Charts
Why-Why Diagrams
Cause & Effect Diagrams
Flowcharts
Histograms
Scatter Diagram
Control Charts

Problem
Solving
Steps
Plan
Do
Study
Act
Link these
Two in
Quality
Circle

CHECK SHEETS
Used to keep a record
of the number and type
of discontinuities over a
specified period of time
or within a certain
batch of product.
PARETO CHART
A graphical representation ranking
discontinuities from the most to
least significant. Used to help
brainstorm what discontinuities, if
worked upon first, would be the
most likely to produce the greatest
improvement in quality.
  Class Example
Our manufacturing procedure is composed of several steps. Several of these
procedures have lead to discontinuities noticed upon inspection. The steps causing
defectives are as follows:
 
      
Caulking 198 defectives
 
      
Fitting 25 defectives
 
      
Connections 103 defectives
 
      
Torque 18 defectives
 
      
Gapping 72 defective
  A Pareto Diagram will be developed.

WHY-WHY DIAGRAMS
A systematic representation of causes of why some
occurrence happens. Used to guide brainstorming sessions.

FLOW CHARTS
Flow charts are graphical representations of the steps involved
in a process. Constructing a flow chart helps give a better
understanding of the systems involved.
Process
DecisionData
Process
Process
Terminator
Yes
No
Control
transfer

CAUSE AND EFFECT DIAGRAMS (Fishbone Diagram)
Used in brainstorming session to help identify the causes of quality
losses. This diagram is particularly useful after the flow chart and
the Pareto diagrams have been developed.
QUALITY
(Effect)
Cause
Step 1:Decide on the quality characteristic {e.g. Reduction of
wobble during machine rotation}
Step 2:Set up the fish bone backbone
Step 3:Identify main factors causing effect {e.g. Workers,
Materials, Inspection, Tools}
Step 4: Add Cause to each branch

Benefits of Cause and Effect Diagram
 
       
Making diagram is educational in itself
 
       
Outline relationship
 
       
Note what samples need to be taken
 
       
Guide for discussion
 
       
Causes are actively sought and results written on diagram
 
       
Appropriate data collected - no time wasted
 
       
Shows level of technology

Problem
Solving
Steps
Plan
Do
Study
Act
Link these
Two in
Quality
Circle

CONTROL CHARTS
 
      
Used to test if the process is in control
 
      
Used to see if significant changes have occurred in the
process over time
“Indiscreet” or
“Continuous Data
Chart” or “X-R Chart”
Measurement at time
intervals
Measurements compared -
control over time.
Examples:
Length (mm) Volume (cc)
Weight (gm) Power (kwh)
Time (sec) Pressure (psi)
Voltage (v)
“Discrete Data Charts” or
“pn-p charts”
Inspection on lot or batch
Note # good/defective
# of parts inspected in the lot = n
Fraction of defective in lot = p
Number of defectives = pn

- R CHART CONSTRUCTION X
In the manufacturing process for this example parts are being
machined with a nominal diameter of 13 mm. Samples are
taken at the following times of day: 6:00, 10:00, 14:00, 18:00
and 22:00, for 25 consecutive days. The diameter
measurements from these samples are presented on the table
in the next slide.
Class Example

S t e p 1 : C o l l e c t D a t a
S t e p 2 : S o r t d a t a i n t o s u b g r o u p s ( i . e . l o t s , o r d e r # , d a y s , e t c . )
n = s i z e o f t h e s u b g r o u p { i n t h i s e x a m p l e 5 t i m e s p e r d a y)
k = n u m b e r o f s u b g r o u p s { i n t h i s e x a m p l e 2 5 d a y s }
S t e p 3 : F i n d t h e m e a n f o r e a c h s u b g r o u p (X)
X=
X X X X
n
n1
2 3
  .....

S t e p 4 : F i n d R a n g e f o r e a c h s u b g r o u p ( R )
R = X l a r g e s t v a l u e - X s m a l l e s t v a l u e

Step 5: Find Overall Mean ( X )
X =
XXXX
k
k1 2 3
...

Step 6: Find average value of range ( R ) R =
RRRR
k
k123
...

Step 7: Complete control limits using attached table
For X Control Chart
Central Line - CL = X
Upper Control Limit - UCL = X +A
2R
Lower Control Limit - LCR = X- A
2R

For R Control Chart
Central Line - CL = R
Upper Control Limit - UCL = D
4R
Lower Control Limit - LCR = D
3R

Step 8:Plot Chart

P CONTROL CHART CONSTRUCTION
An inspector at the end of the manufacturing line for the
production of car wheel rims, at the end of each shift,
inspects the lot of wheel rims made during that shift. On
good days when the welder is running properly, over 400
wheels are made per batch. On poor days, as low as 50 to 60
wheels are made per batch. The inspector marks on his/her
“check sheet” for each batch the total number of wheels
inspected and the number of defects returned for rework in
each lot.
Class Example

Step 1: Collect Data
Step 2: Divide data into subgroups (usually days or lot). Subgroup size should be
greater than 50 units.
n = number in each subgroup
pn = number of defects in each subgroup
Step 3: Compute fraction of defectives (for %, multiply by 100)
p = pn/n
Step 4: Find the Average Fraction of Defectives ( p )
p =
( )
( )
totaldefectives
totalinspected
=
pn
n



Step 5: Compute the Control Limits for each Lot
Central Line CL = p
Upper Control Limit UCL = p + 3
p p
n
( )1

Lower Control Limit LCR = p - 3
p p
n
( )1

Step 6:Draw P Control Chart

PN CONTROL CHART CONSTRUCTION
Class Example
On an assembly line of windshield wiper motors, the inspector selects
randomly 100 motors per hour to examine. The inspector notes on the
“check sheet” the number of defective motors in each 100 selected.

Step 1: Collect Data (lot size set constant)
Step 2: Calculate Values p =


n
pn

CL = pn
UCL = pn + 3pnp()1
LCL = pn - 3pnp()1
Step 3: Plot Chart

QUALITY PLANNING
Who is customer?
What do they need?
QUALITY CONTROL
Evaluate, compare, act
QUALITY
IMPROVEMENT
Establish infrastructure
ISO
9000