Y u k t H I t e m p L a t e f o r r e f e r

Aravindhsiva 34 views 19 slides Jul 12, 2024
Slide 1
Slide 1 of 19
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19

About This Presentation

Template


Slide Content

DENSITY BASED TRAFFIC CONTROL
SYSTEM USING IOT
YUKTI Innovation Challenge 2023
Institution’s Innovation Council (IIC),
Ministry of Education’s Innovation Cell
Submission of Assignments 1-5 for 1
st
Stage Evaluation
Proto ID:IC20181059
IIC Institute Name: RATHINAM
COLLEGE OF ARTS AND SCIENCE
Team Lead Name:YugapriyadharsiniN
Theme/Sector of Focus:
Mentor Name:Mr.N.Ganapatiram
Team Members:Narmatha M
Sumathi V Gayathri N

Assignment 1: Problem Framing/Statement Canvas
Preparation and Submission of a Problem Statement Canvas
Sheet for Validation of your Idea/Prototype/Innovation
Find few Sample Problem Statement/Framing Canvas copy for Reference and
Blank Formats for Fill up and Upload of the same (jpg or pdf) in the YUKTI
Portal.
Please refer the example and format of Problem Statement Canvas provided at
https://www.metabeta.com/blog/process/problem-statement-canvas/. Alternatively can refer the Problem Framing
Canvas at https://miro.com/miroverse/problem-framing-canvas-1/

Who is your Customer Segment: Public(road transport user)
Idea/Innovation Title: Density based traffic control system using IOT
Prepared By: Yugapriyadharsini N
Problem Statement Canvas
YUKTI Proto ID:IC201810579
Date of Submission:
27/10/2023
Contact No: 9715730692
Your Answer:
ROAD(at traffic)
Your Answer:
LARGER TRAFFIC DENSITY
Your Answer:
WAIT LOT OF TIME
Your Answer:
MAIN JUNCTIONS AT MATROPOLITAN CITIES
Your Answer:
Using short cuts ,by changing route may make the travel even late,
and end up in wrong routes even at some dangerous area
Your Answer:
FRUSTRATRE A LOT
Your Answer:
INCREASE IN STRESS ,POLLUTION AND UNABLE TO REACH
DESTINATION IN ACCURATE TIME

Assignment 2: Empathy Map/Opportunity Canvas
Preparation and Submission of an Empathy Map/
Opportunity Canvas Sheet for Validation of your
Prototype/Innovation
Find few Sample empathy canvas copy for Reference and a Blank Format for
Fill up and Upload of the same (jpg or pdf) in the YUKTI Portal.
Complete Guidance of Preparing Empathy Canvas with Templet Available at https://miro.com/miroverse/empathy-map-canvas-1/
Opportunity Canvas at

Your Answer:
Road users hear traffic lights change more frequently, see
other road users given priority, and hear emergency vehicles
given clear paths through traffic.
Your Answer:
Density based traffic control system empathizes with all road users to optimize flow and
improve safety.
Who is your Customer Segment:
General public
Idea/Innovation Title:
DENSITY BASED TRAFFIC CONTROL SYSTEM USING IOT
YUKTI Proto ID:IC201810579Designed By: Yugapriyadharsini N Date of Submission: 27/10/2023
Your Answer:
•Traffic flow is improving,but I'm
still stuck.
Your Answer:
We're getting to our
destinations faster.
Your Answer:
Density-based traffic control is a step in the
right direction.
Your Answer:
Density based traffic control system needs to
optimize traffic flow and improve
safety for all road users.
Your Answer:
•Traffic lights that change more frequently or stay green for longer on less
congested roads.
•Other road users being given priority, such as pedestrians and cyclists.
•Emergency vehicles being given clear paths through traffic.
Your Answer:
"We're able to get to our destinations more quickly
now.“
"I'm still stuck in traffic, but it's better than it was
before."
Your Answer:
Road users may adapt their travel times,
modes of transportation, and awareness of surroundings
to density-based traffic control.

Assignment 3: Business Model Canvas
Preparation and Submission of an Business Model Canvas Sheet for
Business Opportunity Validation your Prototype/Innovation
Find few Sample Business Model Validation copy for Reference and a Blank
Framework for Fill up and Upload of the same (jpg or pdf) in the YUKTI Portal.

Key partnerships
Who are our key partners?
7
Key activities
What things do you do to deliver your value proposition?
Resources
What assets do you need to make it a reality?
Business Model Canvas
Date:
8
6
Cost structure
What are the most important and expensive resources that you’re going to have to pay for?
9
Revenue streams
How do you actually make money to sustain your business?
5
Customer relationships
How do you find customers, keep them and grow user base?
4
Channels
How does your product or service get to your customer?
3
Value proposition
What problem or need are you solving for?
2
Customer segments
Who are your customers? What are the different groupings?
1
•By using real-time data from sensors
to detect the density of traffic on
different roads and intersections. This
data is then used to adjust the timing
of traffic lights and other traffic control
devices in order to reduce congestion
and improve safety.
•Density-based traffic control systems
create value for:
•Drivers:reduced travel
times,improved fuel
efficiency,increased safety
•Pedestrians:shorter wait times at
crosswalks,increased safety
•Cyclists:safer cycling
conditions,dedicated bike
lanes,priority at intersections
•Emergency vehicles:quicker response
times,lives saved
•Society as a whole:reduced economic
costs,improved public
health,increased social equity
•Offer installation and setup services.
•Provide training and support to
customers.
•Collect and analyze data to provide
insights.
•Offer customization and integration
services.
•Provide ongoing maintenance and
updates.
•Customers of a density-based traffic control system using Arduino value reduced traffic congestion,
improved fuel efficiency, increased safety, improved data and insights, and reduced workload for staff.
The pricing mechanism can be based on subscription fees, pay-per-use fees, or performance-based
fees.
7
27/10/2003
Idea/Innovation Title:
DENSITY BASED TRAFFIC CONTROL SYSTEM USING IOT YUKTI Proto ID:IC20181059
A density-based traffic
control system using
Arduino can create a
relationship of trust,
partnership, and
collaboration with
customers. Customers
will feel appreciated,
valued, empowered, and relieved
.
Technical infrastructure: sensors,
microcontrollers, communication
infrastructure, software. Business
infrastructure: CRM system, billing
and payment system, marketing and
sales infrastructure.

Assignment 4: Recent Images of
Prototype/Innovation
Place at least two –three recent images of your
product/innovation
&
Place the URL of maximum 3 minutes video on your
product/innovation. Refer video preparation guideline
Note:
1.If video contains the IP component then video may be uploaded in the google drive and access
shall be given to [email protected]
2.Due to ease of accessibility, the video may be uploaded on YouTube and video link should be
provided.
3.Only provide video URL/Link and no video should be sent in email to MIC

https://youtu.be/1Q6SoOz19oM

Assignment 5: Submit Brief Presentation on your
Innovation and Business Opportunity Plan

LEARN NOW
1. The Overview
Create a very high-level overview of your product or service
I am Yugapriyadharsini from
Rathinam arts and science college,
Here to present my idea .
My idea is density based traffic
control system using Arduino nano
for four way traffic

LEARN NOW
2. The Problem
What problem are you trying to solve? Is it really a problem?
Roadway transport users need to wait
too long to cross the traffic and reach
their destination so the need to miss
lot of opportunity due to late.
Forroad transport users
BYusing sensors we can measure the amount of people in a side and allocate little
more time for long queue .

LEARN NOW
3.The Solution
Describe how are you solving the problem
CREATINGA SENSOR BASED TRAFFIC
SYSTEM
ITWILL CREATE SAFE ENVIRONMENT AND
SAFETY FOR DRIVERS AND PEDESTRIANS
https://youtu.be/1Q6SoOz19o
M

LEARN NOW
4. The Product/Service
Describe how are you solving the problem
https://youtu.be/1Q6SoOz19oM.
Wecan create fast and safe
environment for roadway traffic
system.
DRIVERS,EMERGENGY
VEHICLES,PEDESTRIANS

LEARN NOW
10. Resource Mobilisation Plan
What is your Resource Mobilization Strategy and What you have done so far?
PROTOTYPE DESIGNED AND RUNNING

LEARN NOW
11. Way forward Strategy
What is your implementation strategy in short-term, midterm and long-term?
Creating a small setup at a
institution for traffic
management.
Execute it in a small city .Executing in large cities.

LEARN NOW
12. The Team
Show the people behind the idea and briefly describe their role
Yugapriyadharsini,
Gayathri,Narmatha,Sanmathi,
Mr .GanapathiramN
Final year BSC CS students Rthinam
College of arts and science
Yugapriyadharsini-coding,Gayathri–Techinacal,Narmathaand Sanmathi-
designing

LEARN NOW
13. Contact
Leave your contact details and let people know how to reach you quickly
9715730692,9894821010
[email protected]

Thankyou
Tags