1200 14

804 views 8 slides Jul 17, 2013
Slide 1
Slide 1 of 8
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8

About This Presentation

No description available for this slideshow.


Slide Content

1571200 (Pare 14) = 1984

Indian Standard (restimmes1997)

METHOD OF MEASUREMENT OF BUILDING
AND CIVIL ENGINEERING WORKS

PART14 GLAZING

( Third Revisic

UE 69,003,12:698,3

+1200 (Part 14) - 194

Indian Standard

METHOD OF MEASUREMENT OF BUILDING
AND CIVIL ENGINEERING WORKS

PART 14 GLAZING

( Third Revision.)

Messarement of Works of is Engineering,
lading River Valley Projet), BDC 44

pa” ps
Le Dion Cam nn) enr. Lake

ie ear te Wr Dora

BUREAU OF INDIAN STANDARDS

Sapa tone ere old Ace

AS + 1200 ( Part 14) - 1984

(Continued from page 1)

Members Represeming
Bot Director (D ) ‘National Buildings Organization, New Delhi
Shirt AK. Lat ( Alternate )
y Ass Raso KAR Cateutta Port Trost, Caleutta
Sunt SK. Laws Institution of Engineers ( India ), Calcuta
Sunt K. K. Mapuor MES Bullders Association of India ( Res),
New Delhi
Sui R. K, Ban (Alternate)
Sunt DATTA 8. Matte Indian Institute of Architects, Bombay
‘Pros M. K. Goowous ( Alternate)
Sunt 8. MURTHY ‘Gammon India Limited, Bombay
‘sir H, D. MAtance ( Alternate)
CB. PATEL MN. Dastur and Company Private

Es
Sum B.C. Pare (Alienate)
sum KA Pa Berea of Public Enterprises, New Delhi
SU VOS, Parwanonae Minty of Deine
‘gan © Kanon (Alternate)
Da RS. Si acas Hinda Universi, Banaras
Sia ka: Soma Hinge Bel Works’Comacton Lite,
Surrnovmenoino Sonvevon oF Centcal Pubite Works Department, New Dei
‘Worn Cano
Sinon or Von 7,
Canon) Carate
sim 6. Rane Director General, ES Ecole Member)
Direior CON Ense)

Secretary
samt KM. Maxon
Senior Deputy Director ( Civ Enge ),

Indian Standard

METHOD OF MEASUREMENT OF BUILDING
AND CIVIL ENGINEERING WORKS.

( Third Revision )

15 à 1200 (Part 14) -1988

05 Since measurement of ene type of trade je ao rated to that of

Another ona, ao to aca De send sevi 0118: 1200 164
the Sees! Comme decide that cash pe fade agen, si
50.196 bs sued separately ar ren pao. Thi wl a Es elf
‘he pide wore various tnd ing he ander

This pare 14 covering lasing was, therefore, avc a a separate
The nt sume in DW and Tas tow been teed in order
Fo Rep the provisions he withthe ato practise

deciding. wheter a paris requiramen of this
montent shal te rounded of econo ith
atu shoud Us the sae a that the spied vale in hs Kandard.

1.1 Thin standard Pr 14) cover the method of measurement of lazing
1 Ping and ol engineering work,

2. GENERAL RULES

bin of ame — together provided these are
rd

ing dimensions, the order shal be

Ten bead or With and

23 Descripion of Mens The description of cach item shall, uns

tier, be Re) to ine, where meta comen a
In handling, loas, volosdin sonas and waste

24 Memaremente — AN works bal be measured nein decia!
ed ins place ua gen In 241 and 342

AA Dimensions shall e mented tothe nee OL m.
2.42 Areas sll be worked ut to the nearest O° m
25 mi of Quaniies —The bis of quantiles shall fully describe the

1S 1200( Part 14) - 1984

materials and workmanship, and accurately represent the work to

26 The vacios kind ofshcts for glazing like glass and oher materials
hal bs seed und Shall be measured separat In be cae of ied
fas don or attra of remfonsment shah be described aod in eae of
sted pie Aal be ated whether I on dae or both sds.

27 Work ia wood, metal concreto and the Like shall be measured

28 Ide metodo ng ball be de and mat parts
nice the following clatcaion: The ope and pay Mal ale De
a) Front and back put and spied or fixed wth glazing pin,

©) Rodded in rubber or velvet and Sed with beads (wherever
regres),
3. METHOD OF MEASUREMENT
A Work shall be measured in square metres satin the thickness,

31: The dimensions ofeach pane sal be else dimensions of opening
plas width of rebate of ro member of window/door, The pane
‘ther han rotangulg or equate shal be sur us he pilot zo

an om mise pa cn se cn. Sa cating sal be deme

32 Cicalr cut all be measured ss cara in running mets. The
{erste sal be dese to side any form of cae

233 Glass and set ouvres shal be describe and coumeratd

34 Mack old broken gas and prparin or ow fas sal be

25 Hole died in work shal be eoumerted satig diameter of the hole,
pe and tes of he gasjahet and ae of pa
36 Grinding, polishing and rounding off edge of las or ling sheet
al be nel and measured m runa mei.

AMENDMENT NO. 1 MAY 2002
TO

IS 1200 (Part 14): 1984 METHOD OF MEASUREMENT
OF BUILDING AND CIVIL ENGINEERING WORKS

PART 14 GLAZING
(Third Revision )
( Page 5, clause 3.1.1, last sentence | — Substitute the following for the
existing sentence:

“Cutting to make a circumscribing rectangle shall be deemed to be included in
the item.’

(Page 5, clause 3.2 ) — Substitute the following for the existing clause:

43.2 Cutting required for panes other than rectangular or square shall also be
deemed to be included in the item. The shape required shall be detailed in the
drawings or otherwise desired.’

Reprography Unit, BIS, New Delhi, India.
Tags