This is 5S presentation, that what is 5S and how it is implemented in our office
Size: 1.99 MB
Language: en
Added: Mar 13, 2024
Slides: 55 pages
Slide Content
PRESENTATION
ON
5S
MARUTI CENTER FOR EXCELLENECE
What is5S
1. Sei-ri (Organization)
2. Sei-ton (Neatness)
3. Sei-so (Cleaning)
4. Sei-ke-tsu (Standardization)
5. Shi-tsu-ke (Self-discipline)
5S stands for 5 initials of the
following Japanese words:
5 Steps for improvement
KAIZEN
Meaning of 5S
Sei-ri
Dictionary definition:
To put things in order (or organize them)
according to a specific rule or principle.
Industrial definition:
To distinguish between necessary things
and unnecessary things, and getting rid
of what you do not need.
Seiri = Organization
Prepared by Jegan/PKC
12/07/200226
At the beginning of each month,
put a red tag on every item.
During the month, remove the red
tag when item is used.
At the end of the month, decide
whether the item with the tag is
necessary or not.
Red tag movement
1.Classification management
(Necessary& unnecessary things)
•Red tagmovement
For unnecessary things, find
their true causes.
Key Concepts in Sei-ri
1. Organize your workplace
Before After
Typical Seiri Activities
Solution
Sei-ri
Sei-ton
Sei-ton
Seiri Seiton
NOT TRACEABLE
•Phone call …….. Pen
•Important paper……File
•M/c repair ………. Catalogue
•Modification ……… original drawing
•Keys
•Engine repair ….. Special tool/special jig/feeler gauge
•Preventive maint……. Particular tool
•Die change…………. Allen key, special tool
•Jig has broken…… duplicate jig
•C/v shear pin broken…… shear pin n/a
•washing m/c is u/b……. Spare parts n/a
•Line stopped …. Matl. Available in the plant but not traceable
•Particular consumable….. Not traceable….. Expiry date crossed
•Items lying at wrong locations
•e-mail not traceable.
Dictionary definition:
Establishing a neat layoutso that you can
always get just as much of what you need
when you need it.
Industrial definition:
It is a way of eliminating
search.
Seiton = Neatness
Question
How long is your patience?
5 minutes? 2 minutes?? or 5 seconds???
When you ask someone to bring a
hammer, how long can you wait
without getting mad?
Tool Box
30 SecondRule
30 SecondRule30 SecondRule
1.Design an efficient layout.
(Functional storage)
2.Eliminate search
Everything should have a name.
(A place for everything and everything in its place)
Reserved seats
Key Words:
1. Stripes on files
2. First in, first out
3. Easy to read notices
Before After
Typical Seiton Activities
Sei-ri
Sei-ton
Sei-soSei-ton
Seiri Seiton Seiso
Definition:
Eliminating garbage, filth, and
foreign matters for a cleaner
workplace. Cleaning as a form
of inspection.
Seiso = Cleaning
Keep things clean
(Caring attitude)
+ Inspection
Key Words:
1. Quick 5S drill
2. Sparkling clean campaign
3. Everybody is a cleaner
Broom
Mop
Dust pan
Typical Seiso Activities
Inspection
•5S + Inspection
•Identify abnormalities & remove the cause from
it’s root.
•Chips from m/c;
•Oil Leakages
•Coolant Leakages;
•Water leakage from pipes;
•Steam leakage from over head pipe;
•Cartons lying on floor;
•Papers scattering on floor;
•Paint on floor;
•Consumables on floor;
Definition:
Doing the right things as a matter
of course.
Shitsuke = Self-discipline
The Japan HR Association
Morning exercise
1.Habit formation
(Make it a habit)
2.Create a disciplined workforce
Key Words:
1. Wear your safety shoes
2. Exercise time
3. No smoking at workplace
Typical Shitsuke Activities
Exercise
•Establish a clean-up time every day.
•Segregation of mix material.
•Make a reserved seat for each tool.
•Paint yellow lines at workplace.
•Wear safety badge this week.
SEIRI SEITON SEISO SEIKETSU SHITSUKE
SEISO
SEIRI
SEITON
SEIKETSU
SHITSUKE
Exercise
•Remove expired materials.
•Display names of tools on the shelf.
•Force workers to greet each other.
•Prepare a manual of the work.
•Clean up a hidden place.
SEIRI SEITON SEISO SEIKETSU SHITSUKE
SEIRI
SEITON
SHITSUKE
SEIKETSU
SEISO
Benefits of 5S
National Productivity
Board, Singapore
Why not start 5S today?
JOURNEY TOWARDS WORLD CLASS
1. 5S
2. EXACTNESS
3. VISUALIZATION
4. STANDARDIZATION
5. OPERATOR EASINESS
6. 5S INSIDE THE MACHINE
7. KAIZEN
8. DAILY WORK MANAGEMENT
9. 3G CONCEPT-GENCHI (GO TO THE SPOT), GENBUTSU (SEE THE ACTUAL PROBLEM), GENJITSU
(TAKE THE REALISTIC ACTION)
10. 3M CONCEPT-MUDA(WASTAGE), MURA(UNSTABLE), MURI( DIFFICULT)
11. ELIMINATE MUDA OR USE 3 Re CONCEPT- Reduce, Reuse, Recycle
12. JOB DESCRIPTION i.e Responsibility, Authority and Accountability
13. ACTIVITY CHART
14. BUSINESS PROCESS FLOW DIAGRAM
15. MANAGING POINTS AND CHECKING POINTS
16. GLOSSARY OF TECHNICAL & MANAGERIAL TERMS USED IN THE COMPANY
17. ENGINEERING INFRASTRUCTURE
18. DEEP ANALYSIS
19. SYSTEM FOR POKAYOKE CHECKING ( e.g Poka Yoke should be of preventive type rather detection type)
20. MFO- MANAGEMENT FOR OBJECTIVE ( Policy Deployment)
21. TOP MANAGEMENT QUALITY AUDIT.