Ghazi Uni on going project review presentation.pptx

AppSouls 6 views 3 slides May 10, 2024
Slide 1
Slide 1 of 3
Slide 1
1
Slide 2
2
Slide 3
3

About This Presentation

univetsity scheme


Slide Content

Construction of building of Ghazi University, D.G.Khan SR No GS No Gestation Period Scheme Type Approval Status Cost (M) Exp upto June-23 Allocation Nov23- Feb 24 (M) Release By P&DD (M) Controlling Release (M) Spending Release (M) Utilization (M) (2023-24) Utilization % AGE ( Pifra ) 15 141 01.07.2019 To 30.06.2024 OG Approved 24-12-2019 1349.3 691.6 125.66 C= 125.65 R= 0.01 C= 62.83 31.42 31.4 Scope of the Scheme Capital: A) Civil Work: Skill Development Centre, Academic Block for School of Business, Academic Block-1: (Ground Floor, First Floor, Second floor Mumty , Additional Items) Academic Block-2: (Ground Floor, First Floor, Second floor, Third Floor, Forth Floor Mumty , Additional Items), Academic Block-3: (Ground Floor, First Floor, Second floor, Third Floor Mumty , Additional Items), Construction of Hostel: (Ground Floor, First Floor, Second floor, Third Floor Mumty , Additional Items Revenue: Furniture and Fixtures, IT Equipment, Plant Machinery and Equipment, Newspapers, Periodicals and Books, Medical & Laboratory Equipment Physical Progress Grey structure completed. Roofs laid. Work in progress . Tender of 4 th component is to be issued, which is slowing down the progress. Return

Return Construction of building of Ghazi University, D.G.Khan