HAZCON / HAZDEM
CONTENTS
1.0 PURPOSE
1.0.1 Team
1.0.2 Timing
1.0.3 Preparation
1.0.4 Documentation
HAZCON / HAZDEM: APPLICATION
1.1 SPECIFICATION OF THE WORK
a) HAZCON
b) HAZDEM
1.2 METHOD STATEMENT
1.3 HAZCON STUDY
1.4 HAZDEM STUDY
1.5 MONITORING OF ACTIVITIES
1.6 REVIEW OF HAZARD STUDY


Slide Content

1 CATALYST, PROCESS TECHNOLOGY

CONSULTANCY

Process Safety Guide:

GBHE-PGP-008

HAZCON / HAZDEM

Process Information Disclaimer

HAZCON / HAZDEM: APPLICATION

1.1 SPECIFICATION OF THE WORK

HAZCON STUDY
HAZDEM STUDY

MONITORING OF ACTIVITIES

REVIEW OF HAZARD STUDY

The HAZCON and HAZDEM studies are intended to be flexible so that it can be
used efficiently for both small internal work and large construction project
tical therefore that the Project Manager (or his nominated deputy), are
ympetent to make a judgment on the extent ofthe information, documentation,
and additional consultation required to minimize construction installation risks.

where hazard construction legislation exists, the HAZCON and
‚dies should form part of the legislative safely system requiremen
without the need for duplication of any parts of the study proc

Where external contractors are being used in the installation and construction
otk this may result in additional costs to implement safeguards identified in the
HAZCON

The Project Manager (or his nominated deputy) is responsible for ensuring that
HAZCON and HAZDEM are carried out and im

104 Team

À clear specication of the work and conditions fo be met
A method statement of how the work will be completed.

sment can then be made, and where necessary safeguard actions
proposed and implem

1.0.4 Documentation

For work undertaken by external contractors the ne ments making up
the documentation for HAZCON or HAZDEN should be provided for in the
procurementtender package.

Checks Worksheets to record
‘ring te Soy pat rom the Study

HAZCON Acton List (er

14 SPECIFICATION OF THE WORK
(a) HAZCON

Manager (or his nominated deputy) should

the work shall be completed under,
(including training, safety inductions, site entry/exit restraints, and
commercial aspects)

Testing, commissioning and handover requirements.

Other information as deemed relevant by the Project Manager (or his
nominated deputy),

HAZDEM

The Project Manager (or his nominated deputy) should prepare fication of
the work required

‘Dependent on the

(©) _ Other information as deemed relevant by the Project Manager (or his
nominated deputy).

1.2 METHOD STATEMENT

Based on the interpretation of the specification of the work
package, the Construction Manager (which for internal work may
be the Project Manager (or his nominated deputy), or for external
sourced work, the Contractor), should prepare a method
tatement

The method s lanager how the work
will be completed in accordance with al the requirements, and the
level of consideration given to safety.

Method statements should be unique to each individual project,
Le. generic ones should be avoided) and should include as appr

13 HAZCON STUDY
The HAZCON should include:

A description of the scope and specification of the work;
The method statement

The HAZCON Check

The HAZCON Act

Recommendations for training and briefing construction
personnel;
special conditions to be included in monitoring

The method statement should be analyzed to identify any hazards
and these assessed to determine what safeguards are required.

The sequence of events or operations for the work should be considered one by
‘one, and those considered requiring actions are recorded and noted on a
HAZCON Action List

The HAZDEM Action List (worksheet x2);

Recommendations for training and briefing construction
personnel:

‘Special conditions to be included in monitoring.

The method statement should be analyzed to identify any hazards and th
assessed to determine what safeguards are required.

The sequence of events or operations for the work should be
‘one, and those considered requiring actions are recorded and noted on a
HAZDEM Action List (worksheet x

Note: On large projects the Project Manager (or his nominated depu
judge the scale of the HAZDEM.
to be suitable, and th
is available as an alternative.

feguards, procedure

onitoring should be carried out on a regular basis, appropriate to the s
type of the

un up that cover all SHE requirements, and a s

Complete monitoring exercises should be filed by the Project Manager (or his
‘nominated deputy), and retained in the SSHE dossier.

1.6 REVIEW OF HAZARD STUDY

{At the completion ofthe study the follow
completed

+ Actions should have been as

[10

GBH ENTERPRISES, LTD

VULCAN Catalyst Process

Technology Consultancy
Sales and Service

Gerard B. Hawkins
Managing Director, C.E.O.

Skype: GBHEnterprises
Office: +1-312-235-2610
Cell: +52 55 2108 3070

[email protected]
[email protected]
‘woww.gbhenterprises.com
wulinkedin < erardbhaw
ww gplus to/GBHEnterprise

naltenergy com