Kite Presentation on education's cultures

mahidtabrezmk58 5 views 23 slides Jul 01, 2024
Slide 1
Slide 1 of 23
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11
Slide 12
12
Slide 13
13
Slide 14
14
Slide 15
15
Slide 16
16
Slide 17
17
Slide 18
18
Slide 19
19
Slide 20
20
Slide 21
21
Slide 22
22
Slide 23
23

About This Presentation

Educational ppt regarding pakistani culture


Slide Content

PROJECT IMPLEMENTATION UNIT
COMMUNICATION & WORKS DEPARTMENT
KHYBER PAKHTUNKHWA

INTRODUCTION
Project Name:
KHYBERPAKHTUNKHWA INTEGRATEDTOURISMAND
ENTERPRISEDEVELOPMENTPROJECT(KITE)
Project Location:
i. Peshawar ii. Dir
iii. Swat iv. Chitral
v. Abbottabad vi. Hazara
vii. Mansehra viii. Southern KP

OBJECTIVES
STRENGTHEN INSITUTIONALCAPACITY,INCREASEPRIVATE
SECTOR PARTICIPATION,AND IMPROVE DESTINATION
INFRASTRUCTUREINSUPPORTOFTHETOURISMECOSYSTEMIN
KHYBERPAKHTUNKHWA.

COMPONENTS
FOUR COMPONENTS ARE ENVISIONED
COMPONENT1:SECTORENABLEMENTANDTOURISM
VALUECHAINS(US$30MILLION).
COMPONENT2:INFRASTRUCTUREDEVELOPMENT
(US$60MILLION).
COMPONENT3:INSTITUTIONBUILDINGFORDESTINATION
MANAGEMENTANDIMPLEMENTATIONOF
REGULATORYREFORMS(US$10MILLION).
COMPONENT4:CONTINGENTEMERGENCYRESPONSE
COMPONENT(US$0).

Communication & Works Department
COMPONENT
COMPONENT2:INFRASTRUCTUREDEVELOPMENT
(US$60MILLION)
AIMS: AnImprovedconnectivityandbetterroad
infrastructureforsafeandquickeraccess
oftourist.
Theactivatesofthiscomponentaredividedintothreesub-
components:-
1.AccessibilityandRoadConnectivity:(ChanglaGallito
MakhnialRoad)
2.DestinationPlanningandVisitorFacilityDevelopment:
3.EnvironmentManagement:

COMPONENTS
COMPONENT3:INSTITUTIONBUILDINGFORDESTINATION
MANAGEMENTANDIMPLEMENTATIONOF
REGULATORYREFORMS(US$10MILLION)
AIMS:Todevelopthedesiredinstitutionalcapacitieswithin
GoKPfor(DepartmentofSports,Culture,Tourism
andYouth&C&WDepartment).
COMPONENT4:CONTINGENTEMERGENCYRESPONSE
COMPONENT(US$0)
AIMS: ThiswouldallowtheGoKPtoreallocate
financingfromothercomponentstopartially
coveremergencyresponseandrecoverycosts.

KHYBER PAKHTUNKHWA INTEGRATED TOURISM
AND ENTERPRISE DEVELOPMENT PROJECT
PIU STRUCTUREPIU (C&W Department)
Housed at Peshawar
1. Project Director
2. Senior Infrastructure Engineer
3. Road Engineer
4. Environmental Expert
5. Social Safeguards Expert
6. Divisional Accounts Officer (Additional Charge)
7. Procurement Expert
8. Project Accounts Officer
9. Support staff (Drivers etc)
10. Additional staff as and when desired

(CHANGLAGALI MAKHNYAL ROAD)
SALIENT FEATURES
TotalLengthofProject: 63.50KM
RoadAlignment MostlyHillyTerrain
LengthofRoadtobeImproved 10+10=20KM
by(GoKPRecourses)
LengthofRoadSponsored 43.50KM
byWorldBank
FormationWidth 32Feet
Carriageway(BlackTopWidth) 20Feet
PCCShoulder(Eachside) 04Feet
Drain 3.2Feet
Sub Base Course 8 inches
Water Bound Macadam (WBM) 10 Inches
Asphalt Base Course 03 Inches
Asphalt Wearing Course 02 Inches

PROPOSED CROSS SECTION

LOCATION
MAP

•StartsatChangalagalionMurreeAbbottabadRoadata
distanceofabout17KmfromMurreeandabout51Km
fromDistrictAbbottabad.
•EndsatPirsohawa(IslamabadKPboundary)atabout20Km
fromIslamabadCity
•10KmfromPirsohawa(PirsohawatoKohmalgali)isalready
constructedbyC&WHaripur
•Next10Km(fromKohmalgalitoKohalabala)isunder
constructionbyC&WHaripur
•About43.5Km(fromKohalabalatoChangalagali)willbe
constructedbyWBfundingunderthisproject
PROJECT LOCATION BRIEF

PROPOSED ALIGNMEMT
By GoKP
Funding
By WB
Funding

MAJOR SETTLEMENTS
•Changalagali
•Ziarat Masoom
•Mari
•Nagri Tutial
•Lora
•Noorpur
•Garhi
•Kund Battal
•Gambeer
•Bagla
•Phallah
•Ruper
•Kohala Bala

EXISTING ROAD CONDITION

EXISTING ROAD CONDITION -SECTION I
•Two lane rigid
pavement
•Good pavement
condition
•Steep grades
•Private huts on both
sides
•Very less traffic

EXISTING ROAD CONDITION -SECTION II
•Single lane flexible
pavement with PCC
shoulders at few
locations
•Good pavement
condition with few
eroded reaches
•Realignment
Required at Ziarat
Maasoom Bazar
•Very less traffic

EXISTING ROAD CONDITION -SECTION III
•Single lane shingle
/ earthen road
•Realignment
required at Hairpin
Bends Location and
Nagri Tutial Area
•Negligible traffic

EXISTING ROAD CONDITION -SECTION IV
•Single lane newly
constructed
flexible pavement
•PCC shoulder
provided at few
locations
•Improvement of
alignment at
Hairpin Bends
required
•Relocation of
Services required
•Less traffic

EXISTING ROAD CONDITION -SECTION V
•Part of Lora Hazara
Murree Link Road
•Poor pavement
condition
•Narrow width for
vehicle crossing
•Relocation of Services
& Realignment at
Kohala Bazar required
•Considerable traffic
movement

PROPOSED FACILITIES FOR TOURIST & MAINTENANCE STAFF
Camp Office Comprising of
•Office Area having 2X offices, 2X Bed rooms, TV Lounge and
Kitchen
•Staff Quarter having 2X bed rooms, TV Lounge and Kitchen
Service Area Comprising of
•Restaurant for 200 Persons
•Bachelor Staff quarters for Restaurant Staff having 10 Bedrooms,
TV Lounge and Kitchen
•Toilets area having 20X Toilets for male, female and persons with
disabilities
•TUC Shop Area having 3X TUC shops
•Prayer Halls 2X for male and female with 50 persons capacity
each
4X Rest Areas
Lawn and Playing Area for Kids
Toilets 2X for male, 2X for female and 1x for person with disabilities

PROPOSED FACILITIES FOR OPERATION & MAINTENANCE
2X Toll Plaza
2X pay loaders for snow cleaning
1X Dumper for removal of slides
1X staff quarter for drives 2X bed rooms, TV Lounge and Kitchen