Pengembangan Usaha Ikan Badut Amphiprion ocellaris Pada Sistem 2.ppt

MerliaDonna2 4 views 11 slides Sep 19, 2025
Slide 1
Slide 1 of 11
Slide 1
1
Slide 2
2
Slide 3
3
Slide 4
4
Slide 5
5
Slide 6
6
Slide 7
7
Slide 8
8
Slide 9
9
Slide 10
10
Slide 11
11

About This Presentation

PU Ikan Badut


Slide Content

Pengembangan Usaha Ikan Badut
Amphiprion ocellaris Pada Sistem
Resirkulasi Berbasis In Land Aquaculture
Bidang Kegiatan :
PROGRAM KREATIVITAS MAHASISWA KEWIRAUSAHAAN
Oleh :
Handika Gilang Pramana Putra C14062575 (2006)
Zamzam Jamil Mahbub C14060442 (2006)
Andhini Fitri L. C14061415 (2006)
Ikbal Kamaludin C14062559 (2006)
Mega Dewi Astuti C24070066 (2007)
Dosen Pembimbing :
Ir. Harton Arfah, M.Si
INSTITUT PERTANIAN BOGOR
BOGOR
2010

LATAR BELAKANG

METODOLOGI

PERTUMBUHAN
Rata-rata Pertumbuhan :
0.1 – 0.2 cm/minggu
Ikan
Sampling Ke- (cm)
19/3/201026/3/20102/4/20109/4/201016/4/2010
1 2.3 2.7 2.9 3.3 3.6
2 2.5 2.9 2.8 3.2 3.7
3 2.2 2.5 3.4 2.1 3.3
4 2.1 2.8 2.4 3.2 3.2
5 2.8 2.5 2.7 3.6 3.1
6 2.4 2.4 3.4 3.1 3
7 2.6 2.4 2.7 3.2 3.8
8 2.2 2.3 2.8 3.4 3.4
9 2.3 2.6 2.9 2.8 3.4
10 2.4 3 2.7 2.9 3.3
11 2.5 3.1 3 2.8 3.7
12 2.3 2.3 3.1 2.9 3.9
13 2.4 2.2 2.9 3.1 3.8
14 2.9 2.7 2.8 2.9 3.7
15 2.7 2.6 2.7 3.2 3.6
16 2.3 2.7 2.9 3.3 3.5
17 2.1 2.4 3 3.5 3.5
18 2.2 2.6 3.1 3.6 3.6
19 2.6 2.5 3 3.2 3.2
20 2.5 2.6 3.1 3.7 3.3
21 2.6 2.7 2.8 3 3.3
22 2.5 2.4 2.8 3.2 3.4
23 2.2 2.4 2.8 3.2 3.7
24 2.1 2.9 2.9 3.4 3.6
25 2.3 2.8 2.7 3.3 3.3
26 2.4 2.8 2.9 3.2 3.5
27 2.4 2.7 3.1 3.1 3.6
28 2.1 2.6 3 3.4 3.6
29 2.5 2.5 2.7 3.5 3.8
30 2.6 2.7 3 3.3 3.3
Rata-rata2.4 2.61 2.9 3.19 3.49

PEMELIHARAAN

FILTER & KUALITAS AIR
Karang Mati
Kerikil
Pasir Sungai
Kapas
Pipa PVC
DO
4,9-5,6 ppm
Salinitas
30 – 31 ppt
Suhu
27-28
o
C

PEMASARAN
Pemasaran dilakukan langsung kepada KONSUMEN

PEMASUKAN

PENGGUNAAN DANA
Tanggal Biaya
17-2-2010 Rp 199,000
18-2-2010 Rp 11,500
19-2-2010 Rp 395,000
20-2-2010 Rp 252,000
27-2-2010 Rp 10,000
28-2-2010 Rp 124,500
2/3/2010 Rp 810,000
5/3/2010 Rp 97,000
18-3-2010 Rp 900,000
19-3-2010 Rp 47,500
1/4/2010 Rp 505,000
4/4/2010 Rp 600,000
Total Rp 3,951,500

EVALUASI

TERIMA
KASIH
Tags